Download - Case Study -Hotel design
![Page 1: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/1.jpg)
IV SEM ARCHITECTURAL DESIGN CASE STUDY REPORT ‘15 HOTEL
SURYA EXECUTIVE
DESIGNED BY : AR. KOTA
![Page 2: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/2.jpg)
Location: Solapur, Maharashtra, India
Co ordinates: 17.68°N 75 .92°E
Climate: Dry (arid and semiarid)
Soil: Deccan basalt of continental tholeiitic province of india
Population: 951,118
SOLAPUR
![Page 3: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/3.jpg)
Surya hotel
![Page 4: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/4.jpg)
Plan:
FIRST FLOOR LEVEL PLAN
![Page 5: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/5.jpg)
Zones:
I. Public Spaces:
II. Lodging (guestrooms):
III. Recreation :
IV. Restaurant :
V. Services:
![Page 6: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/6.jpg)
BUBBLE DIAGRAM:
Link between the different zones: Parking
Main Entrance
Lobby+waiting
Administrative Offices
Common Toilets
RestaurantGuestrooms
Site entrance
Service entrance
![Page 7: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/7.jpg)
Zone 1:
PUBLIC SPACES:
1) Parking:
2) Lobby :• Reception • Waiting area• Administrative offices• Stairs and elevators
3) Corridors :
ZONE 2:
LODGING ZONE(Guestrooms):
1) Bedrooms:o Double bedroomo Twin bed room
2) Suites:o Double bedroom suiteo Twin bedroom suite
![Page 8: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/8.jpg)
ZONE 3: RECREATION FACILITIES:
1) Lawn
2) Gym
3) Fountain
4) Outdoor seating on first floor
ZONE 4 : RESTAURANTS:
1. Buffet & Banquet hall
2. Bar
3. Restaurant
ZONE 5: SERVICES:
i. Elevators
ii. Fire escape stairs
iii. Electricity
iv. Ducts:
v. Service floor
![Page 9: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/9.jpg)
ZONE 1Public spaces:
2)Parking:
Parking Near Main Entrance
Parking Near Site Entrance
![Page 10: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/10.jpg)
Public spaces:
2) LOBBY:
i. Entrance:
MAIN ENTRANCE
From InteriorFrom Exterior
SITE ENTRANCE
![Page 11: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/11.jpg)
Waiting Area View From Fifth Floor
RECEPTION PLAN
ii) Waiting: iii) Reception :
Waiting Area Seating
Reception
![Page 12: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/12.jpg)
Elevator : Stairs:
Elevator and stairs:
![Page 13: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/13.jpg)
Public spaces :
3.Corridors :
Corridor (executive floor)
Corridor
![Page 14: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/14.jpg)
ZONE 2:
GUESTROOMS:
TOTAL NO.
ROOMS: AREA ROOMS PER FLOOR
BEDROOMS
Double bedroom 40 Bedroom, bathroom 8
Twin bedroom 10 Bedroom, bathroom 2
SUITES
Double bedroom suites 10 Sitout,bedroom,bathroom 2
Twin bedroom suites 10 Sitout,bedroom,bathroom 2
70
![Page 15: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/15.jpg)
GUESTROOMS ENLARGED PLANS
![Page 16: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/16.jpg)
ZONE 3
RECREATION FACILITIES:
WATER CASCADE
GYM
OUTDOOR DINING
![Page 17: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/17.jpg)
ZONE 4: RESTAURANTS:
Buffet hall
Bar
Banquet hall
![Page 18: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/18.jpg)
Restaurant:
RESTAURANT
DINING HALL KITCHEN
![Page 19: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/19.jpg)
ELECTRICAL SERVICES MCB WERE PROVIDED AT EACH FLOOR TO CONTROL EACH ROOM AT ANY
ELECTRICAL INCONVIENCE APPEARED A GENERATOR ROOM WAS PROVIDED FOR ELECTRICAL BACKUP WHICH RUN ON
DIESEL GENERATOR ROOM WERE PROVIDED AT PARKING LEVEL
AIR CONDITIONING SERVICES AC DUCTS WERE PASSING THROUGH SERVICE FLOOR AND WERE SIZE OF ABOUT
1.5sq.ft IN CROSSECTIONAL AREA
SERVICES
AIR CONDITION WAS BOTH CENTRAL AND PARTIALTHE AIR CONDITION MACHINE WAS KEPT AT THE PARKINGLOBBY WAS COOLED THROUGH DUCT AC PROVIDED
FIRE ESCAPE STAIRS
![Page 20: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/20.jpg)
SECTION SHOWING SERVICE DUCTS
![Page 21: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/21.jpg)
AIR CONDITION WAS BOTH CENTRAL AND PARTIAL THE AIR CONDITION MACHINE WAS KEPT AT THE
PARKING LOBBY WAS COOLED THROUGH DUCT AC
PROVIDED SERVICE FLOOR A SERVICE FLOOR WAS PROVIDED BETWEEN 1ST
FLOOR AND 2ND FLOOR WHICH RUN PERPENDICULARLY CONNECTING ELECTRICAL,SEWEAGE,AC DUCT OF EACH ROOM IT WAS EXACTLY BELOW THE 2ND FLOOR
THE HEIGHT OF THE SERVICE FLOOR WAS ABOUT 2.4m BESIDE WHICH A SMALL PARTY BANQUET AND A LADIES STAFF ROOM ON EITHER SIDE OF THE SERVICE ROOM
LIFTS 2 lifts were provided for vertical transportation 1 for lodgers and 1 as service liftSERVICE DUCTA service duct was given as an vertical duct for ventilation and for sewage connection , water supply for toilets and cables
![Page 22: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/22.jpg)
STRUCTURAL FEATURES STRUCTURE WAS COMPLETELY FRAME STRUCTURE GUESTROOMS WERE RUNNING ONE NEXT ANOTHER IN A L SHAPE IF HOTEL IS CUT DIAGONALLY AND FOLDED IT COMPLETELY OVERLAPSE HENCE IT
IS SYMMETRICAL A STRUCTURE WAS COMPLETELY A RCC COMPLEX AND BRICK WALL WERE USED
FOR PARTITION
ARCHITECTURAL FEATURES LOCAL ARCHITECTURE FEATURES WAS GIVEN THE MOST IMPORTANCE WINDOWS WERE PROJECTED FOR THE ENTR Y OF AIR
EXTERIOR VIEW
![Page 23: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/23.jpg)
AESTHETIC FEATURES
VERLI MURALS WERE DONE ON SERVICE FLOOR ELEVATION
AT THE EXTERIOR ELEVATION STEPED FOUNTAIN WAS GIVEN INFRONT OF OUTDOOR SEATING AT 1ST FLOOR LEVEL
A COLOURED IRON PIPES WERE PROVIDED AT THE EXTERIOR ELEVATION ABOVE PARKING
PAINTINGS WERE PROVIDED AT STAIRS,BAR AND RESTURANT PLACES AND AT GUESTROOMS
SCULPTURES WERE GIVEN AT CORRIDORS
AQUARIUM WAS PROVIDED NEAR PARKING AT SERVICE STAIRS
COMPOUNDS WERE DECORATED
![Page 24: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/24.jpg)
MERITS BANQUET HALL WAS SPACIOUS AND
BEAUTIFUL SCULPTURES WERE KEPT WHICH WERE PLEASING TO EYES
GOOD LIGHT AND VENTILATED BALCONIES AND WAITING
ROOMS WERE DESGINED TO ACHIEVE MAXIUM THERMAL COMFORTS
KITCHEN WAS GOOD LIT AND VENTILATED
FOUNTAIN WAS PLEASING DURING NIGHT OUTDOOR DINNER
MATERIAL WASTE WAS HIGHLY REDUCED BY USING THEM OVER PARKING AS A CAP FOR SHADOW OF IRON PIPES AND ALSO AT MANY OTHER PLACES
MAXIMUM VEGETATION WAS PROVIDED
DEMERITSPASSAGE TO OFFICE DOESNOT HAVE CORRECT CIRCULATIONNO RAILING WAS PROVIDED FOR SAFETY AT STAIRCASE SERVICE FOR CONFERNCE HALL WAS THROUGH WINDOW PASSAGE TO RESTURANT WAS ONLY 0.75m WIDE A COLOURED AND LIGHTNED UMBRELLA WAS PROVIDED AS JHUMAR WHICH SPOILED THE BEAUTY OF LOBBYBALCONIES WERE STEPPED AND PROJECTED WHICH GAVE A UNPLEASANT FEELINGRESTURANT WAS NATURAL LIGHT OBSTRUCTED THERE WAS NO PARTITION GIVEN BETWEEN THE DINING AND WAITING IN THE RESTURANT
CONCLUSION
![Page 25: Case Study -Hotel design](https://reader035.vdocuments.us/reader035/viewer/2022081505/5876ba6b1a28abad1a8b6abd/html5/thumbnails/25.jpg)
PRESENTED BY:1.SHARANAGOUDA2.HEBA S.3.TEJLINGA4.AISHWARYA5.SHILPA6.SOWMYA.P7.MADHUSHREE8.SOWMYA.K9.AISHWARYA.A
10.GOVIND S.11.SYED ZAID IQBAL12.ANURAG.BAJAJ13.SHAGUFTA N.14.TASMIYA T.15.TALHA16.FAIZAL17.SHRUTHI.P18.DEVIKA.PATIL19.RAHEEM