![Page 1: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/1.jpg)
Capacity Building by the three International Metal Study Groups
UNCTAD Workshop, Bangkok, September 2001by: Ian Burrell
ILZSG
NON-FERROUS METALS CONSULTATIVE
FORUM ON SUSTAINABLE DEVELOPMENT
![Page 2: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/2.jpg)
What are the Study Groups ?
• Three Intergovernmental Groups related to Metals:– International Copper Study
Group– International Lead and Zinc
Study Group– International Nickel Study Group
![Page 3: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/3.jpg)
Who are the Members ?
![Page 4: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/4.jpg)
Who are the Permanent Observers?
World Bank
![Page 5: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/5.jpg)
Who Else Participates ?
![Page 6: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/6.jpg)
Consultative Forum on SD
• Joint project by all 3 groups;• 1st Meeting in Brussels, 2000• Forum for discussion for all
stakeholders;• Actions to address concerns
relating to the production and use of non-ferrous metals
![Page 7: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/7.jpg)
• 3 ad-hoc Working Groups:– production;– product stewardship;– science.
• Initiate activities related to the recommendations identified by the Forum.
Working Groups
![Page 8: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/8.jpg)
Product Stewardship
• An emerging principle for a new
generation of pollution prevention• Focus is on product systems instead
of production facilities• Can be voluntary, economic or
regulatory• New management tools developing
– risk assessment, risk management etc.
![Page 9: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/9.jpg)
Product Stewardship Schemes
• Vision statement on objectives;• Set of principles and criteria;• Institutional capacity;• Management systems;• Communication systems.
![Page 10: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/10.jpg)
• Governance;• Communication;• Recycling;• Research and Knowledge base.
Product Stewardship Working Group
![Page 11: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/11.jpg)
Governance
• Internal and external auditing;• Include environmental and social
as well as financial performance;• Adopt corporate codes of conduct
that define ethical behaviour. – With governments– local communities– other partners
![Page 12: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/12.jpg)
Communication
• Stakeholder dialogue about products;• Clarify extent of responsibility;• Ensure products’ risk assessment;• Improve risk management measures
and inform all relevant parties;• Report promptly on H & E hazards
– to officials, employees, customers & public.
![Page 13: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/13.jpg)
Recycling
• Design for the environment– ease of dismantling
• Collection– enhance volume collected– work with users, distributors, manufacturers– link local and national governments
• Innovation– promote clean technology– consider tax incentives
![Page 14: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/14.jpg)
Research and Knowledge Base
• Disclose data on products’ SD impact– involve whole product chain
• Assessment of impact– safe uses, benefits– risks, challenges
• Manage impact– develop solutions for priority SD problems– introduce a credible auditing process
![Page 15: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/15.jpg)
ILZSG Work with the Common Fund
• Four projects (3 zinc, 1 lead)• Aims of projects
– promote metal usage– promote transfer of technology– develop new beneficial uses
• Future - include aspects of
product stewardship?
![Page 16: Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C](https://reader034.vdocuments.us/reader034/viewer/2022051517/5697bf841a28abf838c8703b/html5/thumbnails/16.jpg)
The NFMSD Forum’s Web Site
For more details please contact
the NFMSD Forum’s web site
www.nfmsd.org