Canary Islands 100% RES Experiences:
El Hierro, La Graciosa, …
Canary Islands Institute of Technology (ITC)
Gonzalo Piernavieja
R&D Director
Brussels, 20 March 2014
![Page 2: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/2.jpg)
European Outermost Regions (ORs)
ORs are NATURAL LABORATORIES for developing, testing and
demonstrating new technologies which will be implemented in
continental regions (Europe and ROW), in insular regions worldwide, as
well as in developing countries
ORs are the IDEAL PLATFORMS to showcase and transfer adapted
technologies to regions of developing and emerging countries
worldwide (and particularly of European neighbour regions)
VISION
![Page 3: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/3.jpg)
The Canary Islands: Ideal Test Bench ORs: Natural Laboratories
Every island configurates one or several real laboratories for testing and
demonstrating new technologies, especially emerging ones.
Europe needs test platforms for renewable energies, sustainable water
technologies, marine technologies, etc. ORs can host outstanding experimental
platforms in different areas and become perfect sites for R&D&D activities
worldwide
![Page 4: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/4.jpg)
SUSTAINABILITY
The Canary Islands are fully committed to the development and implementation
of innovative energy, water and environmental protection technologies and
policies, providing sound proof of concepts for the whole Europe and RoW
ORs: Natural Laboratories
![Page 5: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/5.jpg)
Strategic Areas (III)
SCIENCE & TECHNOLOGY FOR INTERNATIONAL COOPERATION
ORs: STRATEGIC ELEMENTS FOR R&D AND TECHNOLOGY
COOPERATION WITH DEVELOPING COUNTRIES
The Canary Islands have been carrying out succesful international cooperation
projects (especially with West Africa and South America) for many years,
developing and transferring adapted technology, for example in the energy, water,
agriculture, fishing and public health sectors
RENEWABLE ENERGIES AND WATER TECHNOLOGIES
The Canary Islands Government is deploying
technology parks specialized in adapting technologies
for the developing world.
![Page 6: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/6.jpg)
The Canary Islands (Spain)
2 mill. inhabitants, 12 mill. tourists/year
Total energy dependence on external resources
Electricity generation from fossil fuels (oil); low heat demand
Isolated (insular) electrical systems
Importance of water-energy binomial (desalination)
Energy Framework
![Page 7: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/7.jpg)
Energy Framework The Canary Islands
> 2.5 GW installed power, approx. 9000 GWh total el. consumption
15% of electricity consumed in water cycle
Abundant Renewable Energy Resources:
wind: ~ 4000 h.eq./y; sun: ~ 2000 kWh/m2/y
Electricity generation
55,6% Road Transport29,9%
Other (Industrial,
Residential...)12,1%
Combined water-electricity
production 2,4%
Seawater desalination plants
Structure of internal fossil
fuels market
![Page 8: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/8.jpg)
INRES - 229947
Surplus of Energy Supply: Potential on RES development
RES in Canary Islands are already cheaper than conventional sources for electricity.
8
13,992 13,550
7,170
c
14,033 13,550
7,170
18,510
13,550
7,170
21,500
13,550
7,170
23,500
13,550
7,170
24,210
13,550
7,170
Fuente: IUDR – FEDEA, extraído del Análisis de los sobrecostes de la Energía
del Sistema Energético de Canarias de RICAM. Elaboración propia.
Coste de la Energía Eléctrica en Canarias (c€/kWh)
![Page 9: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/9.jpg)
MAXIMIZING PENETRATION OF RENEWABLE ENERGIES (RES)
Barriers to RES penetration in the Canary Islands
Electrical System Land Planning Economic-Administrative
issues
Forecasting of wind and
solar resources
Energy storage
Grid stability studies
Strategy for maximizing RES penetration in the Canary Islands
![Page 10: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/10.jpg)
Obstacles for the Sustainable Energy Development in Islands
Weak, isolated grids
Fragile ecosystems (rich biodiversity, etc.)
Lack of space for energy infrastructure placement
Difficulties for the massive deployment of Renewable Energies
….
![Page 11: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/11.jpg)
Technical Solutions (I) HV/MV: Pumped Hydro (where possible)
Lower
Reservoir
Upper Reservoir
Control
Desalination Plant
Pumping Station
Wind Farm
Hydro Power Station
![Page 12: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/12.jpg)
Technical Solutions (II)
HV/MV:
Subsea electrical interconnections
Pajara
Be tan curia
Tu ine je
Ant igua
L a Oliv a
Pue rto de l Rosa rio
T eg uise
T ias
Yaiza
T inajo
Arre cife
San Ba rt olomé
Haria
La G rac iosa
LANZAROTE
Matas Blancas
Gran Tarajal
Las Salinas
Corralejo
Macher
Pla ya Blanca
Punta Grande
Cable Submarino
FUERTEVENTURA
66 kV
San Bartolomé
Enlace submarino Gran Canaria y Fuerteventura :
Refuerzo del enlace submarino entre Lanzarote y Fuerteventura
![Page 13: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/13.jpg)
Technical Solutions (III)
MV/LV:
Distributed Generation, esp.:
Mini- & Microgrids with high renewable energy penetration, incl.
energy storage, management of critical loads (e.g. seawater
desalination) and electrical mobility
![Page 14: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/14.jpg)
ITC is a technology center specialized in:
Energy Saving/Efficiency, Renewable Energies
Water Technologies
Other emerging technological sectors
International Cooperation
(energy and water supply to peri-urban and
remote areas)
![Page 15: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/15.jpg)
Activity lines The ITC
Contribution to maximization of RES penetration:
Characterization of RE resources (mapping and prediction)
Test platforms for RES systems and components (solar labs, distributed
generation lab, etc.)
Development of RES systems (with energy storage): hybrid systems,
mini- microgrids, insular 100% RES models, etc., electricity & water
supply to remote African villages
Grid stability studies
Energy storage: wind-pumped hydro, RE-HYDROGEN, etc.
![Page 16: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/16.jpg)
Pozo Izquierdo Facilities (Gran Canaria)
![Page 17: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/17.jpg)
Distributed Generation and Microgrids Test facilities. Overview
• PV: 27 kWp • Wind turbines: 7,5 kW • Resistive and reactive loads • Storage (300 kWh) • Electrolyzer 70 kW • Fuel Cells 6 x 5 kW • Grid simulator 125 kVA • Measurement equipment
![Page 18: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/18.jpg)
Distributed Generation and Microgrids Test facilities. Equipment
PV plants: 27 kWp
Small windturbines: 34,9 kWp Main switch board (for test configuration)
![Page 19: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/19.jpg)
Distributed Generation and Microgrids Test facilities. Equipment
Hydrogen system:
6 Fuel Cells (PEM). 5 kW each.
6 SMA SI inverters
1 Electrolyzer: 60 kW
H2 Storage: 500 Nm3 (25 bar)
Desalination Plant: 25 kW
Wind Turbine Vestas : 225 kVA
Load simulators:
• Load Bank 1 :150 kW (continuos by
PE)+ 100 kVAr (1 kVAr step)
• Load Bank 2: 40 kW (1 kW step) + 30
kVAr (0.75 kVAr step)
![Page 20: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/20.jpg)
Power Electronics Lab for DG and Microgrids
Power Electronics laboratory overview
SuperCapacitors Storage System for Diesel
Dominated microgrids stabilitation
and high PV penetration
![Page 21: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/21.jpg)
Solar Energy forecasting
SOLAR GENERATION PREDICTION
NWP (Numerical Weather Prediction): M5/WRF models with statistics post-processing
![Page 22: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/22.jpg)
CANARY ISLANDS INSTITUTE OF TECHNOLOGY (ITC)
We have accumulated 15 years of experience in the development of solutions for the ENERGY and WATER supply to peri-urban/rural/remote areas
We have carried out consulting and electrification/water desalination projects using RENEWABLE ENERGIES, as well as training and awareness activities in:
• Mauritania (since 1996)
• Morocco (since 1998)
• Tunisia
• Cape Verde
• Senegal
• ECOWAS
![Page 23: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/23.jpg)
ITC Experience Technology transfer examples (I)
Electrification of isolated communities with wind/solar energy
Development and installation of small autonomous desalination
plants, powered by renewable energies
![Page 24: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/24.jpg)
4 seawater desalination plants, National Park Banc d’Arguin,
Mauritania
4 brackish water desalination plants, powered by solar energy,
Morocco
Brackish water desalination plant powered by solar energy,
Tunisia
ITC Experience Technology transfer examples (II)
![Page 25: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/25.jpg)
Cabo Verde and ECOWAS (ECREEE)
ITC currently advices the Government of Cape Verde in its Renewable Energy Policy
ITC is technological
consultant of ECREEE
(ECOWAS)
![Page 26: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/26.jpg)
The ISLE-PACT Project (I)
GOALS: Achieve an overall objective of more than 20%
CO2 emissions reduction by 2020
Demonstrate islands’ political commitment to EU
sustainable energy objectives by signing a
BINDING DECLARATION, THE PACT OF
ISLANDS
Develop Island Sustainable Energy Action Plans
(ISEAPs) as the means by which they will achieve
the overall target of the project
Develop methodologies and tools to monitor
progress of implementation of ISEAPs as well as
track progress in reducing CO2 emissions
Assess environmental and socio-economic
factors
Produce a pipeline of priority bankable projects
Propose a number of financing tools and
mechanisms that will provide the financial
resources needed by investors
Launch a strong information dissemination
campaign
Participating Regions (12):
– Azores , Madeira
– Islas Canarias, Baleares
– Creta
– Malta
– Chipre
– Cerdeña
– Gotland+ B7 Islands
– Samso
– Outer Hebrides of Scotland
![Page 27: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/27.jpg)
The ISLE-PACT Project (II)
Projects for maximizing penetration of RES
RES Systems
Sustainable Transport
Energy Storage
Energy Efficiency
• Restriction in transport
infrastructures
• Reduction in losses
• Excess RES production
• Mobility (H2 – EPV)
• Grid stability
• Technologies
• Land availability
• Resources (wind-sun-etc)
Distributed Generation
• Rational use of energy
www.isle-pact.eu
![Page 28: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/28.jpg)
EUROPEAN COMMISSION
Take a week to change tomorrow
Projects that will contribute to increase RES penetration in European
Islands in all the energy value chain
Generation
Energy Storage
Energy Efficiency
Manageable loads: e.g. electric
vehicles, Water desalination
Reversible pump-hydro
Batteries
Hydrogen
Wind, solar, Wave, Geothermal,
Biomass, hybrid (wind-diesel)
Final consumption
Microgrids, district heating and
cooling, etc.
IDENTIFYING POTENTIAL BANKABLE PROJECTS
Distribution
Primary sectors
Industry
Services
Residential
![Page 29: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/29.jpg)
The ISLE-PACT Project (III)
Criteria for prioritizing projects ● Compatibility with current framework and existing schemes for promoting RES
● Contribution to global strategy for maximizing RES penetration in the island
● Impact on the reduction in energy demand
● Performance on standard financial parameters (PAYBACK, IRR, NPV)
● Maximization of Green House Emissions reduction to necessary investment cost
● Capacity for local employment creation of the investment project
● Innovative aspect of the project
● Maximization of energy production per unit of occupied land
A list of aprox. 25 bankable projects will be compiled for
the 12 participating European island regions
![Page 30: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/30.jpg)
SMILEGOV
Enhancing effective implementation of sustainable energy action plans in European islands through reinforcement of smart multilevel governance
2nd Consortium meeting
Visby, Gotland, Sweden
24th and 25th September 2013
AAAA
www.sustainableislands.eu
![Page 31: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/31.jpg)
La Graciosa 100% RES
La Graciosa:
650 inhabitants
0.7 MW peak
2 GWh/y demand
Smart Microgrid with high RES penetration, energy storage (incl.
desalination) and electric vehicles fleet
On-going
![Page 32: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/32.jpg)
![Page 33: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/33.jpg)
SMART METERS (already installed) + electric vehicles (planning phase)
![Page 34: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/34.jpg)
Multimegawatt Wind Test Platform at Arinaga Port (Gran Canaria)
![Page 35: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/35.jpg)
24/9/2013, Visby 2nd Consortium meeting
First spanish off-shore wind turbine (GAMESA)
![Page 36: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/36.jpg)
El Hierro: 100% RES Island
278 km2
10.500 inhabitants
7 MW peak
40 GWh/y demand
(Diesel)
Construction finished;
Commissioning in 2014
![Page 37: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/37.jpg)
100% renewable energy supply
• Design and construction of a Wind- Hydro Power Station
• Installation of solar collectors & PV systems
• Evaluation of biomass exploitation possibilities
• Transport. Sustainable Mobility • Environmental Education
![Page 38: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/38.jpg)
Wind-Hydro Power Station
![Page 39: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/39.jpg)
Construction finished El Hierro: 100% RES Island
Wind – Pumped Hydro Power Station
![Page 40: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/40.jpg)
Wind – Pumped Hydro Power Station
Wind Farm 11,5 MW
Hydroelectric Substation 11,3 MW
Pumping Station 6 MW
Upper Reservoir 400.000 m3
Lower Reservoir 150.000 m3
![Page 41: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/41.jpg)
Upper Reservoir
![Page 42: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/42.jpg)
![Page 43: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/43.jpg)
![Page 44: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/44.jpg)
![Page 45: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/45.jpg)
![Page 46: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/46.jpg)
![Page 47: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/47.jpg)
![Page 48: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/48.jpg)
![Page 49: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/49.jpg)
Conductions
![Page 50: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/50.jpg)
![Page 51: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/51.jpg)
![Page 52: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/52.jpg)
![Page 53: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/53.jpg)
Lower Reservoir
![Page 54: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/54.jpg)
![Page 55: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/55.jpg)
![Page 56: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/56.jpg)
![Page 57: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/57.jpg)
![Page 58: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/58.jpg)
Hydro-Station
![Page 59: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/59.jpg)
![Page 60: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/60.jpg)
![Page 61: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/61.jpg)
![Page 62: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/62.jpg)
Pumping-Station
![Page 63: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/63.jpg)
![Page 64: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/64.jpg)
![Page 65: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/65.jpg)
![Page 66: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/66.jpg)
![Page 67: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/67.jpg)
![Page 68: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/68.jpg)
![Page 69: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/69.jpg)
Wind Farm
![Page 70: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/70.jpg)
![Page 71: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/71.jpg)
![Page 72: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/72.jpg)
![Page 73: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/73.jpg)
![Page 74: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/74.jpg)
![Page 75: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/75.jpg)
![Page 76: Canary Islands and El Hierro](https://reader035.vdocuments.us/reader035/viewer/2022081821/5494cbc6ac795959288b4dc1/html5/thumbnails/76.jpg)
Thank you! [email protected]