  • CAMPAN VALLEY RESIDENTIAL LAYOUT PROJECT PHOTOS-FEBRUARY 15 th 2015
  • Slide 2
  • Slide 3
  • Slide 4
  • VIEW-1: BITUMEN MACADAM, SEWERLINES & WATER SUPPLY LINES COMPLETED & FOOTPATH FORMATION WORK IN PROGRESS BETWEEN BLOCK 32 & COMPOUND
  • Slide 5
  • VIEW-2: SEWER LINE, STORM WATER DRAIN, WATER SUPPLY LINES, BITUMEN MACADAM COMPLETED & FOOT PATH FORMATION WORK IN PROGRESS BETWEEN BLOCK 19 & COMPOUND
  • Slide 6
  • CLUB HOUSE: NORTH SIDE ELEVATION-PLINTH BEAM & COLUMNS CASTING WORK IN PROGRESS
  • Slide 7
  • CLUB HOUSE: EAST SIDE ELEVATION-PLINTH BEAM & COLUMNS CASTING WORK IN PROGRESS
  • Slide 8
  • CLUB HOUSE: SOUTH SIDE ELEVATION-PLINTH BEAM & COLUMNS CASTING WORK IN PROGRESS
  • Slide 9
  • CLUB HOUSE: WEST SIDE ELEVATION-PLINTH BEAM & COLUMNS CASTING WORK IN PROGRESS
  • Slide 10
  • MODEL VILLA FOUNDATION- FOUNDATION WORK IN PROGRESS
  • Slide 11
  • TRANSFORMERS ERECTED IN PLACE