11/20/2012

1

WSHFC

Continuum of Needs and Resources Chart

Local Government & Public Housing Authorities<Federal, State & Local Funds>

Housing Trust Fund Program<Federal, State & Local Funds>

Housing Finance Commission<Using No State Funds>

Private SectorPrivate Sector

SubsidyInsurance

Federal ProgramsFederal Programs

No Income 50% (Area Median) 80% Median 115%

Mortgage Interest Deduction &

Housing Credits and Tax exempt Bonds – It’s Simple!

WSHFC

Page 2: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

2

Tax Credits

Eq

uity

$$

for

Pro

ject

How are the Credits Turned Into Equity for the Project?

WSHFC

Tax Credit Partnership

Investor = 99% Owner

Developer = 1% Owner

$14,000,000

Credit to Equity

$13,580,000

WSHFCTAX CREDITS

InvestorTAX SAVINGS

10 years

Investorpays $0.97 / dollar

of tax credit

HousingEQUITY

$14,000,000

Credit to Equity

$9,800,000

WSHFCTAX CREDITS

InvestorTAX SAVINGS

10 years

Investorpays $0.70 / dollar

of tax credit

HousingEQUITY

Page 3: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

3

WSHFC

Best Process:

Objective vs. Subjective?

•Policy Objectives:– maximize public benefit

– appealing to investor

– geographic dispersion

– project readiness

– public funder coordination

•Allocation Approach– geographic credit pools

– public benefit point criteria

– caps and limits

Public Benefit Point Criteria

WSHFC

Page 4: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

4

WSHFC

USDA RD 538 Loan

6 Site PortfolioBond Tax Credit Financing

Rehab 6 Site Location

LIHTC BUDGET

Costs Per Unit

Acquisition Costs $       7,483,656  $      38,576 

Construction $       6,008,074  $      30,969 

Soft Costs $       3,388,296  $      17,465 

Other Development $       1,812,086  $        9,341 

Total Costs $    18,692,112  $      96,351 

Total Project Costs $    18,692,112 

Total Eligible Basis‐Acquisition $       8,061,656 

Total Eligible Basis‐Rehab $       8,358,746 

Reasonable Expected Basis (1st Yr.) $    17,000,402 

.

WSHFC

USDA RD 538 Loan cont.

Bond Tax Credit Financing

Rehab 6 Site Location

Residential Sources Uses

USDA 538 Loan/Bond $9,000,000 Acquisition $ 7,483,656 

USDA Loan Assumptions $3,592,659 Construction $ 6,008,074 

Deferred Developer Fees $1,796,927 Soft/Financing Costs $ 3,388,296 

Tax Credit Equity $4,302,522 Replacement Reserves $1,812,082

Total Sources $18,692,108 $18,692,108

Credit to Equity

Page 5: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

5

Chelsea Apartments - Oak Harbor, WA

Harmony House – Shelton, WA

Wellington Apts. – Snohomish, WA

Page 6: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

6

USDA RD 515 Loan

3 Site PortfolioCompetitive Tax Credit Financing

Rehab 3 Site Location

Residential Sources Residential Uses

USDA 515 Loan $2,347,969 Acquisition $3,323,022

GP Contributions $205,780 Construction $5,201,163

Sponsor Take Back Note $892,031 Soft/Financing Costs $3,388,102

Tax Credit Equity $8,892,507 Reserves $426,000

Total Sources $12,338,287 Total Uses $12,338,287

WSHFC

USDA RD 515 Loan cont.

Competitive Tax Credit Financing

Rehab 3 Site Location

Residential Sources Residential Uses

USDA 515 Loan $2,347,969 Acquisition $3,323,022

GP Contributions $205,780 Construction $5,201,163

Sponsor Take Back Note $892,031 Soft/Financing Costs $3,388,102

Tax Credit Equity $8,892,507 Reserves $426,000

Total Sources $12,338,287 Total Uses $12,338,287

Credit to Equity

Page 7: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

7

Mercy Housing Northwest Allegre Villa, Sandstone & Cambridge

Apts. RD Rehab

RD Transfer Application – lots of paper

Mercy Housing Northwest

• Acquired 30 property, 926 unit RD portfolio 8 yrs ago from private developer to preserve housing

• Strategy to rehab properties with emphasis on health and safety, energy conservation, accessibility, and extending useful life to enhance the overall sustainability and marketability

• Renovated 7 properties with HUD Green Retrofit• Phase 2 - 84 senior units in 4 buildings in 3 rural

towns

Mercy Housing Northwest

Sandstone Apartments, Tenino WAConstructed in 1978

Pre Rehab

Page 8: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

8

Mercy Housing Northwest

Moving Day – Residents are temporarily relocated

Mercy Housing Northwest

Sandstone Apartments in progress - rigid insulation, new windows and new roof & gutters installed

Mercy Housing Northwest

Pre-rehab non-conforming stairs

Rehab in progress to bring to code

Page 9: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

9

Mercy Housing Northwest

Typical pre-rehab kitchen

Mercy Housing Northwest

Asbestos abatement underway – floors, ceilings and wall texture throughout

Mercy Housing Northwest

Kitchen - asbestos abatement completed

Page 10: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

10

Mercy Housing Northwest

Accessibility modifications to sidewalks, ramps and driveway

Mercy Housing Northwest

Cementitious board siding installation underway

Competitive Housing Credit Timeline

Initial developer inquiry

Application submitted Day 1

Staff reviews and underwriting Day 1-90

Housing Tax Credit

Page 11: C8 financing affordable rental projects   p pt - bob peterson

11/20/2012

11

Tax Exempt Bond Timeline

Initial developer inquiry

Application submitted(Day 1)

Final commitment from lender or credit enhancer Day (55)