REMOVE EX. BUILDING (FOUNDATIONS, WALLS, SLABS & UTILITY SERVICES, ETC.)
AutoCAD SHX Text
REMOVE EX. CURB & GUTTER
AutoCAD SHX Text
REMOVE EX. CURB
AutoCAD SHX Text
REMOVE EX. CONC. TURNOUT
AutoCAD SHX Text
REMOVE EX. CONC. TURNOUT
AutoCAD SHX Text
REMOVE CONC. PAVING (SAW-CUT AT EDGES TO REMAIN, TYP.)
AutoCAD SHX Text
REQ'D SAW-CUT, TYP.
AutoCAD SHX Text
REQ'D SAW-CUT, TYP.
AutoCAD SHX Text
REQ'D SAW-CUT, TYP.
AutoCAD SHX Text
REQ'D SAW-CUT, TYP.
AutoCAD SHX Text
REMOVE CONC. PAVING (SAW-CUT AT EDGES TO REMAIN, TYP.)
AutoCAD SHX Text
EX. GRATE INLET (RETAIN)
AutoCAD SHX Text
EX. GRATE INLET (RETAIN)
AutoCAD SHX Text
EX. GRATE INLET (RETAIN)
AutoCAD SHX Text
EX. WALL & FENCE (RETAIN)
AutoCAD SHX Text
REMOVE EX. FENCE, WALL & FOOTINGS
AutoCAD SHX Text
EX. FENCE (RETAIN)
AutoCAD SHX Text
REQ'D CONSTRUCTION FENCE (APPROX. LIMITS OF DEMOLITION)
AutoCAD SHX Text
EX. SIDEWALK (REMOVE & REPLACE)
AutoCAD SHX Text
REQ'D CONSTRUCTION FENCE (APPROX. LIMITS OF DEMOLITION)
AutoCAD SHX Text
EX. AC UNIT (REMOVE)
AutoCAD SHX Text
EX. SSWR LATERAL (REMOVE & CAP AT MAIN). CONTRACTOR SHALL VERIFY THAT NO OTHER SERVICES ARE TIED TO THE BUILDING'S SERVICE.
AutoCAD SHX Text
EX. GAS METER (PRESERVE & PROTECT)
AutoCAD SHX Text
EX. GAS (PRESERVE & PROTECT)
AutoCAD SHX Text
REQ'D CONSTRUCTION EXIT PAD (FIELD LOCATE)
AutoCAD SHX Text
EX. LIGHTS (RETAIN)
AutoCAD SHX Text
EX. LIGHT (RETAIN)
AutoCAD SHX Text
EX. LIGHT (RETAIN)
AutoCAD SHX Text
EX. BRICK PIER (REMOVE & REPLACE)
AutoCAD SHX Text
EX. BRICK PIER (RETAIN)
AutoCAD SHX Text
EX. SIGN (RELOCATE, SEE ARCH)
AutoCAD SHX Text
SALVAGE, RELOCATE AND REPLANT EXISTING TREES ON PROJECT AREA AT LOCATION DESIGNATED BY MHA
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
REMOVE EX. CONC. PAVING
AutoCAD SHX Text
EXISTING STORM PIPE
AutoCAD SHX Text
EXISITNG CONTOUR
AutoCAD SHX Text
715
AutoCAD SHX Text
EXISITNG UNDERGROUND POWER
AutoCAD SHX Text
EXISITNG OVERHEAD POWER
AutoCAD SHX Text
EXISITNG WATER
AutoCAD SHX Text
EXISITNG GAS
AutoCAD SHX Text
EXISITNG SANITARY SEWER
AutoCAD SHX Text
EXISITNG CONCRETE PAVING
AutoCAD SHX Text
REMOVE EX. CURB & GUTTER
AutoCAD SHX Text
REMOVE EX. UTILITY
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
DEMOLITION PLAN
AutoCAD SHX Text
C1.0
AutoCAD SHX Text
1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
20
AutoCAD SHX Text
80
AutoCAD SHX Text
10
AutoCAD SHX Text
north
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
ISSUE DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJ. MGR.:
AutoCAD SHX Text
MBA PROJECT NO.
AutoCAD SHX Text
MSA
AutoCAD SHX Text
MCS
AutoCAD SHX Text
MCS
AutoCAD SHX Text
C1901.00
AutoCAD SHX Text
03/01/2019
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
1. THE CONTRACTOR SHALL FOLLOW THE ASBESTOS ABATEMENT DESIGN FOR THE CONTRACTOR SHALL FOLLOW THE ASBESTOS ABATEMENT DESIGN FOR DEMOLITION OF THE BUILDING. REFER TO MAY 4, 2016 BUILDING . REFER TO MAY 4, 2016 BUILDING ENVIRONMENTAL, INC. ASBESTOS SURVEY INCLUDED IN DEMOLITION SPECS PROJECT MANUAL, PERTAINING TO THE MANAGEMENT OFFICE BUILDING. 2. THE CONTRACTOR SHALL VERIFY LOCATION OF ALL UTILITIES AND PIPING WHICH THE CONTRACTOR SHALL VERIFY LOCATION OF ALL UTILITIES AND PIPING WHICH MIGHT INTERFERE WITH DEMOLITION. ANY DAMAGES TO UTILITIES SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL DEBRIS NOT CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL DEBRIS NOT ACCEPTABLE TO THE OWNER AND ENGINEER. 4. CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES BEFORE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES BEFORE DEMOLITION AND VERIFYING LOCATION OF ALL UTILITIES SHOWN OR NOT SHOWN. 5. PROTECT EXISTING TREES ON SITE AS SHOWN TO BE RELOCATED PER PLANS. PROTECT EXISTING TREES ON SITE AS SHOWN TO BE RELOCATED PER PLANS. 6. THE CONTRACTOR SHALL ATTEMPT TO SAVE ALL TREES ON THE PROPERTY. THE CONTRACTOR SHALL ATTEMPT TO SAVE ALL TREES ON THE PROPERTY. IN THE EVENT THE CONTRACTOR BELIEVES IT NECESSARY TO REMOVE A TREE, HE/SHE SHALL NOTIFY THE ENGINEER IMMEDIATELY. IN THE EVENT OF ENGINEER/OWNER OWNER APPROVAL, THE TREE TO BE DEMOLISHED SHALL BE CLEARED AND GRUBBED. NO BURNING SHALL BE ALLOWED ON OWNER'S PROPERTY. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND COST OF THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND COST OF THE RELOCATION OF ALL UTILITIES ALONG THE RIGHT-OF-WAY AND ON THE SITE ASSOCIATED WITH THE DEMOLITION OF THIS PROJECT, SUCH AS, BUT NOT LIMITED TO, SIGNAL POLES, SIGNAL CONTROLS, DRAINAGE STRUCTURES, TRAFFIC SIGNS, UTILITY POLES, GUY WIRES, ETC. 8. ALL WATER AND SEWER WORK & MATERIALS SHALL MEET MWWSSB STANDARDS ALL WATER AND SEWER WORK & MATERIALS SHALL MEET MWWSSB STANDARDS AND SPECIFICATIONS. 9. CONTRACTOR SHALL COORDINATE WITH ALAGASCO TO REMOVE ALL GAS CONTRACTOR SHALL COORDINATE WITH ALAGASCO TO REMOVE ALL GAS SERVICES AND METERS TO THE BUILDINGS. 10. CONTRACTOR SHALL ERECT A 6' CHAIN LINK CONSTRUCTION FENCE AROUND CONTRACTOR SHALL ERECT A 6' CHAIN LINK CONSTRUCTION FENCE AROUND THE CONSTRUCTION AREA. ALL WORK, INCLUDING MATERIAL STORAGE, SHALL BE KEPT WITHIN THIS AREA. 11. CONTRACTOR SHALL RESTORE THE SITE TO A CONDITION ACCEPTABLE TO THE CONTRACTOR SHALL RESTORE THE SITE TO A CONDITION ACCEPTABLE TO THE OWNER. 12. CONTRACTOR TO VERIFY ACTUAL LIMITS OF DEMOLITION. CONTRACTOR TO VERIFY ACTUAL LIMITS OF DEMOLITION. 13. ALL EXISTING ASPHALT TO BE REMOVED MUST BE SAW-CUT AT THE EDGES TO ALL EXISTING ASPHALT TO BE REMOVED MUST BE SAW-CUT AT THE EDGES TO REMAIN. 14. ALL CONCRETE TO BE REMOVED SHALL BE SAW-CUT OR REMOVED TO THE ALL CONCRETE TO BE REMOVED SHALL BE SAW-CUT OR REMOVED TO THE NEAREST JOINT. 15. ADJUST ALL MANHOLE AND VALVE BOXES THAT ARE TO REMAIN TO FINAL ADJUST ALL MANHOLE AND VALVE BOXES THAT ARE TO REMAIN TO FINAL GRADE. 16. CONTRACTOR SHALL PROVIDE AN AS-BUILT DESIGN SURVEY OF THE CONTRACTOR SHALL PROVIDE AN AS-BUILT DESIGN SURVEY OF THE DEMOLISHED SITE, INCLUDING TOPOGRAPHIC AND UTILITY INFORMATION. 17. THE FINISHED SITE SHALL BE CLEAR OF ALL DEBRIS. THE CONTRACTOR THE FINISHED SITE SHALL BE CLEAR OF ALL DEBRIS. THE CONTRACTOR SHALL SEED AND MULCH THE ENTIRE SITE. WATER AS NEEDED IN ORDER TO ACHIEVE A THOROUGH AND CONSISTENT GROUND COVER THAT IS ACCEPTABLE TO OWNER. 18. ALL EXCAVATED MATERIAL MUST BE HAULED OFF OF THE SITE.ALL EXCAVATED MATERIAL MUST BE HAULED OFF OF THE SITE.
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
(3.6m)
AutoCAD SHX Text
12' MIN.
AutoCAD SHX Text
50' (15m) MIN.
AutoCAD SHX Text
SPILLWAY
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
ROADWAY
AutoCAD SHX Text
DIVERSION RIDGE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
20' (6m) R
AutoCAD SHX Text
NOTES: 1. ALL CONSTRUCTION ENTRANCES SHALL BE ALL CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY, WHEELS SHALL BE CLEANED WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. 3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABLIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN.
AutoCAD SHX Text
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT PAD
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
STRAW BALES, SANDBAGS, OR CONTINUOUS BERM OF EQUIVELENT HEIGHT
AutoCAD SHX Text
SUPPLY WATER TO WASH WHEELS IF NECESSARY
AutoCAD SHX Text
2"-3" DIA (MIN) COURSE AGGREGATE MIN. 6" (150mm) THICK
AutoCAD SHX Text
NOTE: USE SANDBAGS, STRAW BALES OR OTHER APPROVED METHODS TO CHANNELIZE RUNOFF TO BASIN AS REQUIRED.
THIS
DRA
WIN
G AN
D AL
L CO
PIES
THE
REO
F IS
THE
PRO
PERT
Y O
F M
BA E
NGI
NEE
RS, I
NC.
THI
SDR
AWIN
G M
AY N
OT
BE U
SED
OR
REPR
ODU
CED
WIT
HIN
AN
Y CO
MPU
TER
ENVI
RON
MEN
T O
R BY
ANY
PRIN
T M
EDIA
FO
RMAT
WIT
HOU
T TH
EW
RITT
EN C
ON
SEN
T O
F M
BA E
NGI
NEE
RS, I
NC.
MO
NTG
OM
ERY H
OUSIN
G A
UTHO
RIT
YPARKS P
LACE P
HASE IV
MAN
AG
EM
EN
T O
FFIC
E D
EM
OLIT
ION
1
E
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
D
C
B
A
1026 R
osa L
Parks A
ve, M
ontgomery, AL 3
610
8
300 20th Street North, Suite 100Birmingham, Alabama 35203P(205) 323-6385
1. SOLID SOD OR LANDSCAPING / MULCHING IS REQUIRED ON ALL SOLID SOD OR LANDSCAPING / MULCHING IS REQUIRED ON ALL DISTURBED AREAS. 2. A MINIMUM OF 4" OF TOPSOIL (AND FERTILIZING) IS REQUIRED FOR ALL A MINIMUM OF 4" OF TOPSOIL (AND FERTILIZING) IS REQUIRED FOR ALL DISTURBED AREAS TO RECEIVE SODDING, PERMANENT MULCHING, OR LANDSCAPING. 3. THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING EROSION AND THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING EROSION AND STABILIZING ALL DISTURBED AREAS ON SITE. 4. PLASTIC SHEETING OR TEMPORARY MULCHING IS REQUIRED TO COVER PLASTIC SHEETING OR TEMPORARY MULCHING IS REQUIRED TO COVER ALL STOCKPILES THAT WILL REMAIN FOR 3 DAYS OR MORE. ALL STOCKPILES TO REMAIN FOR 3 DAYS OR MORE SHALL BE SURROUNDED WITH A SEDIMENT BARRIER (TYPE "A" SILT FENCE OR A 20" WATTLE. 5. GRAVEL SURFACING OR TEMPORARY MULCHING IS REQUIRED FOR ALL GRAVEL SURFACING OR TEMPORARY MULCHING IS REQUIRED FOR ALL DISTURBED AREAS NOT IN AN ACTIVE WORK AREA (DISTURBED AREAS WHERE ACTIVE GRADING OR WORK IS NOT PERFORMED WITHIN 13 DAYS, MINIMUM). 6. ALL CONSTRUCTION SEQUENCING AND TECHNIQUES CANNOT BE ALL CONSTRUCTION SEQUENCING AND TECHNIQUES CANNOT BE ANTICIPATED BY THE ENGINEER, SO THERE MAY BE ADDITIONAL BMP MEASURES THAT WILL BE NEEDED TO SUFFICIENTLY PROTECT THE SITE FROM EROSION AND SEDIMENT TRANSPORT OFF SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND CONSTRUCT THESE BMP'S AND ACCOUNT FOR ALL SCENARIOS AND ACCOUNT FOR ALL BMP'S SHOWN OR OTHERWISE NEEDED IN BASE BID PRICE FOR PROJECT. BMP'S SHOWN ARE THE ENGINEERS ESTIMATE OF THE MINIMUM AMOUNT NEEDED. THE CONTRACTOR SHALL NOT BE PAID ADDITIONALLY FOR ADDITIONAL BMP'S, INCLUDING TEMPORARY MULCHING OR FOR BMP MAINTENANCE, REPLACEMENT OR REMOVAL.
AutoCAD SHX Text
EROSION CONTROL NOTES
AutoCAD SHX Text
STORM SEWER GRATE
AutoCAD SHX Text
REINFORCED CORNERS
AutoCAD SHX Text
MANAGEABLE 2 FOOT CONTAINMENT AREA
AutoCAD SHX Text
LIFT STRAPS
AutoCAD SHX Text
OPTIONAL OVERFLOW PORTS
AutoCAD SHX Text
DUMPING STRAPS
AutoCAD SHX Text
STORM INLET
AutoCAD SHX Text
CITY/STATE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DR. NO:
AutoCAD SHX Text
DR. BY:
AutoCAD SHX Text
DETAIL OF INLET SEDIMENT CONTROL DEVICE
AutoCAD SHX Text
DANDY SACK
AutoCAD SHX Text
TM
AutoCAD SHX Text
NOTE: THE DANDY SACKÔ WILL BE MANUFACTURED IN THE U.S.A. FROM A WOVEN WILL BE MANUFACTURED IN THE U.S.A. FROM A WOVEN MANUFACTURED IN THE U.S.A. FROM A WOVEN FROM A WOVEN MONOFILAMENT FABRIC THAT MEETS OR EXCEEDS THE FOLLOWING SPECIFICATIONS:
*Note: All Dandy SacksÔ can be ordered with our optional oil absorbent pillows can be ordered with our optional oil absorbent pillows
AutoCAD SHX Text
*OR SIMILAR - TO BE APPROVED BY ENGINEER
AutoCAD SHX Text
5' MIN.
AutoCAD SHX Text
8" WATTLE
AutoCAD SHX Text
SAND BAGS TO WEIGH DOWN WATTLES ON PAVING
AutoCAD SHX Text
OVERLAP ENDS PER MANUFACTURES RECOMMENDATIONS (1' MIN., 3' MAX.)
AutoCAD SHX Text
DROP INLET
AutoCAD SHX Text
SURFACE FLOW
AutoCAD SHX Text
SURFACE FLOW
AutoCAD SHX Text
SURFACE FLOW
AutoCAD SHX Text
WATTLE INLET PROTECTION
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
EROSION CONTROL GENERAL NOTES
AutoCAD SHX Text
1. ANY SLOPE OR FILL WHICH HAS BEEN GRADED, WITHIN THIRTEEN (13) DAYS ANY SLOPE OR FILL WHICH HAS BEEN GRADED, WITHIN THIRTEEN (13) DAYS OF THE COMPLETION OF SUCH GRADING OR COMPLETION OF ANY PHASE OF GRADING BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER MATERIALS SUFFICIENT TO RESTRAIN EROSION. HAY MULCH OR GRAVEL SHALL USED. 2. THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL ADEM AND CITY THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL ADEM AND CITY REQUIREMENTS. 3. THE BEST MANAGEMENT PRACTICES (BMP) SHOWN ON THIS PLAN SHALL BE THE BEST MANAGEMENT PRACTICES (BMP) SHOWN ON THIS PLAN SHALL BE IMPLEMENTED AND MAINTAINED DURING THE COURSE OF THIS WORK AND UNTIL DISTURBED AREAS ARE EITHER VEGETATED OR STABILIZED AGAINST EROSION. ADEQUATE PROTECTIVE MEASURES SHALL BE PROVIDED FOR THE CONTAINMENT OF HAZARDOUS SUBSTANCES AND ANY OTHER MATERIALS WHICH MAY POLLUTE STORM WATER RUNOFF, INCLUDING PETROLEUM PRODUCTS, LUBRICANTS, AND PAINT. THE CONTRACTOR SHALL PROVIDE A COMMERCIAL DUMPSTER SERVICE FOR THE COLLECTION, REMOVAL AND DISPOSAL OF SUCH MATERIALS FROM SITE. 4. ALL CONTROL MEASURES SHALL BE CHECKED AND REPAIRED AS NECESSARY, ALL CONTROL MEASURES SHALL BE CHECKED AND REPAIRED AS NECESSARY, MONTHLY IN DRY PERIODS AND WITHIN TWENTY-FOUR (24) HOURS AFTER ANY RAINFALL AT THE SITE OF 0.75 INCH WITHIN TWENTY-FOUR (24) HOUR PERIOD. DURING PROLONGED RAINFALLS, DAILY CHECKS AND REPAIRING SHALL BE DONE. THE CONTRACTOR SHALL MAINTAIN WRITTEN RECORDS OF SUCH CHECKS AND REPAIRS, WHICH RECORDS SHALL BE SUBJECTED TO INSPECTION OF THE OFFICIAL AT ANY REASONABLE TIME. 5. THERE SHALL BE NO VISIBLE FLOATING SCUM, OIL OR OTHER MATTER THERE SHALL BE NO VISIBLE FLOATING SCUM, OIL OR OTHER MATTER CONTAINED IN THE STORM WATER DISCHARGE. THE STORM WATER DISCHARGE MUST NOT CAUSE AN UNNATURAL COLOR OR ODOR IN THE COMMUNITY WATERS AND MUST NOT CONTRIBUTE ANY MATERIALS IN CONCENTRATIONS SUFFICIENT TO BE HAZARDOUS OF OTHERWISE DETRIMENTAL TO HUMANS, LIVESTOCK, WILDLIFE, PLANT LIFE, OR FISH AND AQUATIC LIFE IN THE COMMUNITY WATERS. 6. CONTRACTOR SHALL NOTE THE REQUIREMENTS OF THE BEST MANAGEMENT CONTRACTOR SHALL NOTE THE REQUIREMENTS OF THE BEST MANAGEMENT PLAN (BMP) DETAILS NOTED ON THIS PLAN AND IN THE ALABAMA HANDBOOK HE ALABAMA HANDBOOK FOR EROSION CONTROL, SEDIMENT CONTROL, AND STORMWATER MANAGEMENT MANAGEMENT MANAGEMENT ON CONSTRUCTION SITES AND URBAN AREAS, LATEST EDITION. 7. CONTRACTOR NEEDS TO HAVE A CLEAR DIRECTION AS TO WHAT NEEDS TO BE CONTRACTOR NEEDS TO HAVE A CLEAR DIRECTION AS TO WHAT NEEDS TO BE ACCOMPLISHED BY THE EROSION CONTROL PLAN AND HOW IT SHALL BE MAINTAINED TO FUNCTION AT ALL TIMES FOR THE DURATION OF CONSTRUCTION ACTIVITIES. 8. CONTRACTOR SHALL INSTALL THE PERIMETER SEDIMENT BARRIERS AND CONTRACTOR SHALL INSTALL THE PERIMETER SEDIMENT BARRIERS AND CONSTRUCTION EXIT PADS BEFORE COMMENCING ANY DISTURBANCE ACTIVITIES. 9. THE CONTRACTOR SHALL PREVENT TRACKING OF SEDIMENT ONTO STREETS AND THE CONTRACTOR SHALL PREVENT TRACKING OF SEDIMENT ONTO STREETS AND SURROUNDING PAVEMENTS. CLEAN UP IS REQUIRED DAILY. 10. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING CONSTRUCTION EXIT PADS THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING CONSTRUCTION EXIT PADS (CEP) AT ALL LOCATIONS WHERE TRUCKS AND CONSTRUCTION EQUIPMENT ARE EXPECTED TO ENTER/EXIT THE SITE 11. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE NEEDED AT ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE NEEDED AT VARIOUS STAGES OF CONSTRUCTION. IT IS THE CONTRACTORS RESPONSIBILITY TO LOCATE THEM AND HAVE THEM CONSTRUCTED. 12. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING SITE FREE FROM TRASH AND THE CONTRACTOR IS RESPONSIBLE FOR KEEPING SITE FREE FROM TRASH AND OTHER DEBRIS BY ESTABLISHING TRASH COLLECTION AREAS AND PROPERLY MAINTAINING THEM. 13. THE CONTRACTOR SHALL INCLUDE IN HIS BID TO OWNER ALL EROSION THE CONTRACTOR SHALL INCLUDE IN HIS BID TO OWNER ALL EROSION CONTROL ITEMS NECESSARY TO PROTECT THE SITE DURING CONSTRUCTION AND PERMANENTLY RE-ESTABLISH VEGETATION ON ALL DISTURBED AREAS OF THE SITE. INCLUDING BUT NOT LIMITED TO TEMPORARY MULCHING, SLOPE PROTECTION, DITCH LINING AND REPAIR/MAINTENANCE. 14. WHEN NOTICEABLE OR EXCESSIVE DUST IS PRESENT DURING EARTHWORK WHEN NOTICEABLE OR EXCESSIVE DUST IS PRESENT DURING EARTHWORK ACTIVITIES, THE CONTRACTOR SHALL USE WATER APPLIED BY WATER TRUCKS OR OTHER METHODS, TO LIMIT THE LOSS OF SOIL BY WIND EROSION.