Remove Deteriorated and Distresses Pavement (to a specified depth)
Improve Cross-Slope Achieve Specified Grades Provide a Uniform Surface Texture to
Facilitate Compaction of HMA Provide Best Opportunity for Achieving the
Ride Quality Requirement
![Page 3: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/3.jpg)
Excavation Maintain Overhead Clearance Correct Ponding and Drainage Maintain Curb and Gutter Staged Construction
![Page 4: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/4.jpg)
Need enough of cores to determine the consistency of the existing pavement
Establish the “most” reasonable milling depth
Provide thickness of the layers Determine depth of “Top Down” cracks
![Page 5: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/5.jpg)
Need to remove the entire layer to avoid scabbing
Need to remove reasonable amount of the deteriorated pavement
![Page 6: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/6.jpg)
Need to remove the entire layer to avoid scabbing
Need to remove reasonable amount of the deteriorated pavement
![Page 7: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/7.jpg)
![Page 8: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/8.jpg)
For every operation (or opportunity) the IRI was expected to be improved by 30%◦ Milling = 30 % improvement of IRI◦ Each subsequent operation (each paving lift)
expected 30% improvement of of IRI
![Page 9: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/9.jpg)
Determination of the Target IRI is more complicated
30 % improvement is no longer used in determination of Target IRI
Many other factors involved that affect the target IRI
THE POINT IS THAT EVERY OPPORTUNITY FOR SMOOTHNESS (MILLING) IS IMPORTANT
![Page 10: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/10.jpg)
![Page 11: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/11.jpg)
Equipment◦ Self-propelled with variable operating speeds
capable of removing pavement without using heat◦ Automatic grade controls◦ Stringline or ski type reference system
Ski must be minimum of 20’ length◦ Teeth should be replaced if dislodged, broken or
unevenly worn
![Page 12: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/12.jpg)
Construction◦ No ride quality requirement◦ Texture requirements, but they are not typically
checked Striations must be within ±1” in 200’ of line parallel
with the center of the traveled way Striations not to exceed 3/8” depth Milling depth within a tolerance of ± ¼” If opened to traffic, no drop-offs to exceed 2”
![Page 13: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/13.jpg)
Equipment◦ Self-propelled with variable operating speeds and
equipped with cutting drum specifically designed for milling pavement to close tolerances
◦ Drum must have 2 wraps of flighting with bolt-in blocks that accept 3 or 4 teeth on the wear side of the flight Second wrap of flighting must trail the first by 180
degrees Teeth spacing of 5/16” (±1/32”)
◦ Cutting radius of the drum within ± 1/32”
![Page 14: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/14.jpg)
Construction◦ No ride quality requirement◦ Texture requirement, but typically not measured
Striations must be within 5/16” center to center Striations not to exceed 1/16”
![Page 15: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/15.jpg)
![Page 16: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/16.jpg)
Indiana DOT◦ Macrotexture
Requirement measured by Sand Patch Test using glass beads (ASTM 965)
◦ Not complicated◦ Data shows
improvement in HMA densities due to improved working platform
![Page 17: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/17.jpg)
Georgia DOT◦ Ride quality
requirement for milled pavements if traffic is allowed prior to overlay IRI < 75 in./mi. for
Interstates IRI < 85 in./mi. for all
others
![Page 18: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/18.jpg)
Industry has requested to allow traffic on milled surfaces
If NJDOT allows traffic, we will require “End Result” specifications◦ IRI◦ Macrotextureor◦ Combination of IRI and macrotexture
Micro-milling specification will have “End Result” requirements
![Page 19: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/19.jpg)
![Page 20: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/20.jpg)
![Page 21: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/21.jpg)
![Page 22: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/22.jpg)
![Page 23: By Robert J. Blight Project Engineer Bureau of Materials](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a25b6550346545e8b4642/html5/thumbnails/23.jpg)
Contact Info.:Robert J. BlightProject EngineerNJDOTBureau of MaterialsPhone (609) [email protected]