![Page 1: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/1.jpg)
Building a low carbon economy
Chinese media delegation briefing
![Page 2: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/2.jpg)
Sean Lockie, director of
sustainability, Faithful+Gould
11 October 2013
![Page 3: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/3.jpg)
A framework for sustainability
Energy
Carbon
Waste
Water
Ecology
Comfort
![Page 4: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/4.jpg)
Drivers
Cost Compliance
CSR Customer
Sustainability
![Page 5: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/5.jpg)
Drivers - Cost
● Energy costs 25 per cent of total business cost
● Energy costs increasing
● Internal Rate of Return (IRR) of circa 40 per cent on some projects
● Changing business case (valuations, rentals, voids)
● Costs of techs coming down.
Cost Compliance
CSR Customer
Sustainability
![Page 6: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/6.jpg)
Drivers - Compliance
● Energy Act 80 per cent by 2050
● Carbon budgets
● Carbon Reduction Commitment
● Mandatory reporting
● 2016 / 2019
● Faithful+Gould rated buildings 2018.
Cost Compliance
CSR Customer
Sustainability
![Page 7: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/7.jpg)
Risks - unsustainable traits
![Page 8: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/8.jpg)
Savings are available
Hospital Office Restaurant
Hotel Shopping Centre School
Source: Siemens Building Technologies 2012
![Page 9: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/9.jpg)
Drivers - CSR
● Productivity
● Health
● Carbon footprint
● CSR strategies required certain investment funds
● Local jobs
● Voluntary reporting – CDP, GRI, GRESB etc.
Cost Compliance
CSR Customer
Sustainability
![Page 10: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/10.jpg)
The business case is there
Source: WGBC 2013
![Page 11: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/11.jpg)
And it’s not just a label
Valuations > rental > demand > voids > brown discount > green premium
![Page 12: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/12.jpg)
Drivers - Customer demand
● Increasing amount of labelling
● Leading players aggressive targets
● Labelling of products.
Cost Compliance
CSR Customer
Sustainability
![Page 13: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/13.jpg)
![Page 14: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/14.jpg)
Atkins' turnkey energy
efficiency solution How it works
![Page 15: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/15.jpg)
Client advantages
● Atkins designs, finances, installs and maintains the systems
● Atkins’ costs are repaid through the energy savings
● Reduce overall client operation cost
● Risks and responsibilities are rested on Atkins
● No upfront costs or investment for the client.
![Page 16: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/16.jpg)
Identification of opportunities
Full investment grade proposal
Detailed design
Agree M&V strategy
Install & PM energy conservation
measures
Implement M&V
Ongoing guarantee of energy savings
Survey
Funding
Design
Maintenance
‘Energy
performance
contract’
Installation
The process
![Page 17: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/17.jpg)
How can we be certain
technologies will pay back?
![Page 18: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/18.jpg)
saved per year
34,000tCO2
Salix finance
£750m
9000
143 funds established
saved over project lifetimes
projects in 662 organisations
“A government fund
for the public sector ”
![Page 19: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/19.jpg)
Technology Typical payback
LED lighting – lamp retrofit 4 to 5 years
LED lighting – complete luminaire upgrade 6 to 7 years
Building fabric insulation 3 to 10 years
Building management system upgrades 3 to 4 years
Combined heat & power (cogeneration) 5 years
Boiler replacements 4 to 5 years
Heating zoning and controls 3 years
Free cooling 4 years
Motor variable speed drives 3 years
Technologies and paybacks / Salix
![Page 20: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/20.jpg)
UK case study - Frimley Park hospital
3.5 £3m
£900k loan for 17 EE projects
years payback
lifetime savings
![Page 21: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/21.jpg)
UK case study – Marks & Spencer
Faithful+Gould is undertaking an in-depth Post Occupancy Evaluation (POE) of
Marks & Spencer’s (M&S) second largest store at Cheshire Oaks near Chester.
This prestigious new study is part of an extensive £8 million programme funded by the
Technology Strategy Board (TSB) designed to deliver more efficient, better performing buildings.
![Page 22: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/22.jpg)
Post occupancy evaluation
Source: Marks and Spencer
![Page 23: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/23.jpg)
Post occupancy evaluation
Source: Marks and Spencer
![Page 24: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/24.jpg)
Post occupancy evaluation
Source: Marks and Spencer
![Page 25: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/25.jpg)
China case study Confidential technology company
![Page 26: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/26.jpg)
Production facility in Suzhou
2,500m² production area
24 hour operation
Injection machines
High-speed stamping.
![Page 27: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/27.jpg)
• Poor HVAC design for production
area with insufficient cooling
capacity and distribution
• High energy consuming metal
halide lighting
• No use of free heating energy
from production waste heat for
heating offices in winter
• No energy monitoring system
• No effective maintenance
programme.
Problems
![Page 28: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/28.jpg)
• New chillers and free cooling
• Re-design of HVAC System in
production & office areas
• Implementation of power meter
monitoring system (PMMS) to
improve equipment reliability and
energy consumption efficiency
• New lighting
• China and UK skills and products
used.
What we did
![Page 29: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/29.jpg)
15% 36
£300k savings in 3 years
energy saving
The results
month ROI
![Page 30: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/30.jpg)
Concluding themes
● Business case is changing
● Regulation and targets are getting tougher
● Importance of good data (evidence)
● New technologies.
![Page 32: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou](https://reader033.vdocuments.us/reader033/viewer/2022050509/5f9a264443a9f048bc5ff6d0/html5/thumbnails/32.jpg)
Celebrating 75 years of
design, engineering and
project management
excellence.
www.atkinsglobal.com