Regular Item #1:Buey Unit Well #1HOil & Gas Drilling Permit
October 20, 2014
![Page 2: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/2.jpg)
Background
• Texas Railroad Commission • Primary Regulator of Oil and Gas Industry• Drilling Permit• Protecting Ground Water
• College Station Oil and Gas Regulations Chapter 4, Section 13• Additional Regulations• Location / Buffering• Truck Routes / Surety• Road Access
![Page 3: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/3.jpg)
Location Rules
• No Drill Site may be located or operated:• Within 50 ft of Street, ROW, Alley, or PUE• Within 600 ft of Cemetery, Park, or
Residential Unit (Unless Waived by the Owner and Tenant)
• Within 1000 ft of a School or Hospital
![Page 4: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/4.jpg)
![Page 5: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/5.jpg)
Classification
• Well Area Classified as High Impact• Uses within 1000 ft of the Well Site• High Impact Well Classification Uses
• Residential *• Administrative• Professional• Commercial Neighborhood
• High Impact Well Additional Requirements• Screened with a fence with 30 days of Completion• Landscaping Required• Retain a Consultant
![Page 6: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/6.jpg)
Consultant
• Required as a High Impact Well• 3rd Party • Consultant is to be retained by City • At Applicant Cost• To Evaluate and Prepare an Environmental
Impact Analysis Report (EIA)• City Retained CME Testing and Engineering• M. Frederick (Rick) Conlin, P.E.
![Page 7: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/7.jpg)
PRC
• Project Review Committee - Required by Ordinance to make a Recommendation to City Council• Committee Members
• P&Z Chair• PDS Director• Fire Marshall• City Engineer
• Met and Recommended Approval Sept 19th with the Conditions:
• All Waivers being secured• 10 ft wide earthen fire access around pad• All EIA recommendations from Consultant
![Page 8: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/8.jpg)
Updated Well Site Location
• Applicant was not able to secure All Required Waivers
• Applicant relocated Well Site to the NW such that no Residences, Cemeteries, or Parks are within 600 ft • Therefore, per the Ordinance, no Waivers are
required• All other Application Items remained identical
![Page 9: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/9.jpg)
Site Layout
![Page 10: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/10.jpg)
Draft Permit Requirements
• Truck Route Map• Wellborn Road• Rock Prairie Road• Holleman Drive
• Applicant must Repair any Damage to Roads, etc
• $250,000 Bond (for each well)• Insurance
![Page 11: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/11.jpg)
Truck Route Map
![Page 12: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/12.jpg)
Draft Permit Requirements
• Site Fire Fighting - Boots and Coots• Halcon Emergency Preparedness and
Response Plan• Halcon Spill Prevention Control and
Countermeasure Plan• 8 ft Wooden Fence• Landscaping – Wax Myrtles and Pampas
Grass• Sound Walls – Noise Mitigation
![Page 13: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/13.jpg)
Screening / Fencing Plan
![Page 14: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/14.jpg)
Sound Walls
![Page 15: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/15.jpg)
Site Layout
![Page 16: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/16.jpg)
Questions
![Page 17: Buey Oil Well Permit](https://reader035.vdocuments.us/reader035/viewer/2022062513/5562ac7cd8b42a2e6e8b4c71/html5/thumbnails/17.jpg)
Offset Distances