Download - Buckley_Portfolio_issuu_5-30-15
Just Touch.
Selected workSamantha Buckley BArch.
Just touch.
Selected w
ork / Sam
antha Buckley
Samantha Buckley, BArch. / Portfolio
page / 2
Just Touch.
Selected work Samantha Buckley / BArch.
Samantha Buckley, BArch. / Portfolio
Just Touch.
Table of Contents
01 Long Bridge veteran housing comprehensive design
02 I Look Up mixed-use high rise core and shell
03 Passing Time visitor center sanctuary and building performance
04 Occupied Void film theater and tennis club assembly buildings and context
00 Introduction
05 Park Roulade parkour academy and culinary institute body, phenomena, space
06 Personal Works hand work
07 Professional Work
08 Acknowledgments
Samantha Buckley, BArch. / Portfolio
page / 8
Long Bridge.Project 01
Pedestrian scale housing creating a connection between city and water through material and light.
01 Project long bridge veteran housing and master plan
03 Site pier 70 san francisco ca
04 Instructors peter benoit michael tauber
02 Course housing and comprehensive design
05 Team samantha buckley giovanni ribo
Samantha Buckley, BArch. / Portfolio
page / 10
1849 WATER’S EDGE
PIER 70
IRISH HILL
PETRERO HILL
20
60
100
160
100
200
260
320
01
Project 01Long Bridge
Pier 70Veteran Housing
01 Historic Site Analysis topography lines and railroad network with future sea level rise
03 Site Photo view looking north east toward existing ship repair facilities
04 Site Photo view looking south east toward energy plant
02 Site Photo view looking east toward bay
03
04
02
Samantha Buckley, BArch. / Portfolio
page / 12
CHOW HALL
VENUE
COMMUNITYCENTER
COMMUNITYCENTER
MIXED-USERESIDENTIAL
MIXED-USERESIDENTIAL
SINGLE FAMILYRESIDENTIAL
ARTIST STUDIOS
LIVE-WORK
IRISH HILL PARK
GROUND LEVELRETAIL/RESTAURANT
SCALE: 1” = 32’
0’8’ 24’ 56’
LARGE OFFICE
ARTISANS/ SUPPORT
SERVICES (DENTIST)PARKING
PARKING
SINGLE FAMILY
RESIDENTIAL
SITE PLANSCALE 1” = 16’
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIO
ARAGO COURTYARD
DURANGO COURTYARD
EMERALDCOURTYARD
POTRERO POINT PARK
OUTDOOR DAYCARE
OUTDOOR DAYCARE
CATHWOOD DAYCARE
3 BDRM
3 BDRM
1 BDRM
1 BDRM
1 BDRM1 BDRM1 BDRM
1 BDRM
1 BDRM 1 BDRM
1 BDRM
3 BDRM
3 BDRM
1 BDRM
2 BDRM
2 BDRM2 BDRM
2 BDRM 2 BDRM
2 BDRM2 BDRM
2 BDRM
2 BDRM
SOCIALSERVICES
SOCIALSERVICES
21ST SREET
22ND STREET LEVEL 2
ARIZONA STREET
COLO
RADO STREET
LONG BRIDGE
5 20
A1
A2A3
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIO
21ST SREET
MIXED-USE RESIDENTIAL
SINGLE-FAMILY RESIDENTIAL
POTRERO POINT PARK
POTRERO POINT EARTHWORK
SOLAR WATER HEATERS
NATURAL COASTAL LANDSCAPING
MIXED-USE RESIDENTIAL
22ND STREET ROOF PLAN
ARIZONA STREET
COLO
RADO STREET
LONG BRIDGE
A1
A2A3
5 20
02 Site Plan aerial view with cast shadows
03 Floor Plan level 2 showing long bridge connection and relationships
01 Master Plan high density historic long bridge proposal with adjacent zoning
01
02 03
04 Next Page rendering from long bridge approach
Project 01Long Bridge
Pier 70Veteran Housing
CHOW HALL
VENUE
COMMUNITYCENTER
COMMUNITYCENTER
MIXED-USERESIDENTIAL
MIXED-USERESIDENTIAL
SINGLE FAMILYRESIDENTIAL
ARTIST STUDIOS
LIVE-WORK
IRISH HILL PARK
GROUND LEVELRETAIL/RESTAURANT
SCALE: 1” = 32’
0’8’ 24’ 56’
LARGE OFFICE
ARTISANS/ SUPPORT
SERVICES (DENTIST)PARKING
PARKING
SINGLE FAMILY
RESIDENTIAL
SITE PLANSCALE 1” = 16’
Samantha Buckley, BArch. / Portfolio
page / 14
04
Samantha Buckley, BArch. / Portfolio
page / 16
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIO
APPROACHING BESSA-DURANGO ON LONG BRIDGE
01
Project 01Long Bridge
Pier 70Veteran Housing
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIO
GROUND LEVEL
SECOND LEVELSECOND-HALF LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”
17’ 0”
2 BDRM
2 BDRM
2 BDRM
SRO SRO
2 BDRM 2 BDRM 2 BDRM
2 CATHWOOD PLAZA SECTION-ELEVATION | 1/16” = 1’ 0”
GROUND LEVEL
SECOND LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”
3 ARIZONA ST SECTION-ELEVATION | 1/16” = 1’ 0”
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIO
GROUND LEVEL
SECOND LEVELSECOND-HALF LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”
17’ 0”
2 BDRM
2 BDRM
2 BDRM
SRO SRO
2 BDRM 2 BDRM 2 BDRM
2 CATHWOOD PLAZA SECTION-ELEVATION | 1/16” = 1’ 0”
GROUND LEVEL
SECOND LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”
3 ARIZONA ST SECTION-ELEVATION | 1/16” = 1’ 0”
01 Rendering approach into housing project on long bridge
03 Section-Elevation through cathwood plaza
02 Section-Elevation north-south section through arizona st
02
03
Samantha Buckley, BArch. / Portfolio
page / 18
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIO
GROUND LEVEL
SECOND LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”
2 BDRM 2 BDRM
2 BDRM
2 BDRM
2 BDRM
DAYCARE
LOBBY MULTIPURPOSE
1 BDRM 1 BDRM
1 BDRM
2 BDRM
ABCDEFQPHIKLMNO
1 NORTH SECTION-ELEVATION | 1/16” = 1’ 0”
L K
2 BDRM
2 BDRM
1 BDRM
1 BDRMGROUND LEVEL
SECOND LEVEL
GROUND LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”M
1.1 NORTH SECTION-ELEVATION | 1/8” = 1’ 0”
THIRD LEVEL
27’ 0’
15’ 0”
0’ 0”
SECOND LEVEL
GROUND LEVEL
LEVEL 3
LANDSCAPEDECK & CONCRETESTEELCEILING
LEVEL 2
DECK & CONCRETESTEELPAVEMENT
8’ 6
”30
”12
’ 6”
40”
23
b
b
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIO
GROUND LEVEL
SECOND LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”
2 BDRM 2 BDRM
2 BDRM
2 BDRM
2 BDRM
DAYCARE
LOBBY MULTIPURPOSE
1 BDRM 1 BDRM
1 BDRM
2 BDRM
ABCDEFQPHIKLMNO
1 NORTH SECTION-ELEVATION | 1/16” = 1’ 0”
L K
2 BDRM
2 BDRM
1 BDRM
1 BDRMGROUND LEVEL
SECOND LEVEL
GROUND LEVEL
THIRD LEVEL
FOURTH LEVEL
15’ 0”
0’ 0”
25’ 0”
35’ 0”
45’ 0”M
1.1 NORTH SECTION-ELEVATION | 1/8” = 1’ 0”
THIRD LEVEL
27’ 0’
15’ 0”
0’ 0”
SECOND LEVEL
GROUND LEVEL
LEVEL 3
LANDSCAPEDECK & CONCRETESTEELCEILING
LEVEL 2
DECK & CONCRETESTEELPAVEMENT
8’ 6
”30
”12
’ 6”
40”
23
b
b
02
01
Project 01Long Bridge
Pier 70Veteran Housing
LO
NG
B
RID
GE
VETERAN HOUSINGGIOVANNI RIBO
+ SAMANTHA BUCKLEY
ARH 450: COMPREHENSIVE DESIGN STUDIOCATHWOOD PLAZA FROM BENEATH LONG BRIDGE
03 Render view from under long bridge into cathwood plaza
02 Detail zoomed in view of units spanning arizona street
01 Section-Elevation section cut parallel to long bridge
03
Samantha Buckley, BArch. / Portfolio
page / 20
02 Wall Section Detail interior construction with radiant slab and wood framing
03 Exploded Axon diagram helping explain construction assembly
01 Wall Section Detail exterior skin system with rain screen and window sill
01
02
Project 01Long Bridge
Pier 70Veteran Housing
03
Samantha Buckley, BArch. / Portfolio
page / 22
I Look Up.Project 02
Introducing open spaces physically, visually, and programmatically to inform program relationships
01 Project i look up splunk hq, and mixed-use tower
03 Site aronson building 700 mission street san francisco ca
04 Course karen seong benjamin damron
02 Program tectonics and structure, core and shell
Samantha Buckley, BArch. / Portfolio
page / 24
02
Project 02I Look Up
Yerba BuenaMixed-Use Tower
01 Formal Studies line drawings cataloging the macquettes
02 Formal Studies cast plaster models reflecting site conditions and material properties
02
Samantha Buckley, BArch. / Portfolio
page / 26
02
Project 02I Look Up
Yerba BuenaMixed-Use Tower
01 Site Model large scale cast plaster and wood model in context
02 Diagram process showing where voids were created in original macquette
02
Samantha Buckley, BArch. / Portfolio
page / 28
01 Process Mold mold before the pour showing sun angles and contributing forces
02 Program Model inversion of negative and positive to explore program relationships
0201
OPEN-AIR VOID
RESIDENTIAL
SKY GARDEN
SPLUNK OFFICES
CAFETERIA
CORE
REC
RESIDENTSTECH-IN-RESIDENCE
SCULPTURE GARDEN
COMMUNICATION STAIRS
MEETING AREAS
OFFICES
CUBICLES
MEETING ROOMS
COLLABORATIVE WORK SPACES
LOUNGE AREAS
SPELUNKING COURSEVIDEO ARCADE/BAR
ELEVATORSEGRESS
RESTAURANTSOPEN KITCHENCOFFEE SHOP
GENERAL STORE
ASSEMBLYLECTURE HALL
LOBBYPROJECTION ROOM
STORAGE
03 Program Diagram coupling pairs relationship between programs
Samantha Buckley, BArch. / Portfolio
page / 30
01
Project 02I Look Up
Yerba BuenaMixed-Use Tower
GROUND LEVEL
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 16
LEVEL 18
LEVEL 17
LEVEL 19
LEVEL 20
LEVEL 21
LEVEL 22
LEVEL 23
LEVEL 24
LEVEL 25
LEVEL 26
LEVEL 27
ROOF LEVEL
20'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 28’-0”"
226'-0"
28'-0"
1 3 4 5 6 7 8 92
0 4 16FTEAST-WEST SECTION
AUDITORIUM
SKY GARDEN
SCULPTUREGARDEN
CASUAL COLLABORATION
SPACE
HACK-A-THON
01 Sky Garden Render view toward south of market emphasizing the transparency
02 Select Plans ground floor, public dining level, auditorium, and residential level
03 Longitudinal Section showing the structural grid, program location, and context
INCUBATORSTUDIOS
RESIDENTIAL
SKY GARDEN
GATHERINGHUB
JESSIE SQUARE PLAZA
WESTIN PLAZA
INCUBATORSTUDIOS
RESIDENTIAL
SKY GARDEN
GATHERINGHUB
JESSIE SQUARE PLAZA
WESTIN PLAZA
02
03
Samantha Buckley, BArch. / Portfolio
page / 32
WESTIN PLAZATHIRD STREETMISSION STREETJESSIE SQUARENORTH-WEST ELEVATIONNORTH-EAST ELEVATIONSOUTH-EAST ELEVATIONSOUTH-WEST ELEVATION
WALL SECTION DETAIL: VOID MEETS GRID
01
Project 02I Look Up
Yerba BuenaMixed-Use Tower
GROUND LEVEL
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 16
LEVEL 18
LEVEL 17
LEVEL 19
LEVEL 20
LEVEL 21
LEVEL 22
LEVEL 23
LEVEL 24
LEVEL 25
LEVEL 26
LEVEL 27
ROOF LEVEL
20'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 28’-0”"
226'-0"
28'-0"
1 3 4 5 6 7 8 92
0 4 16FTEAST-WEST SECTION
AUDITORIUM
SKY GARDEN
SCULPTURE GARDEN
CASUAL COLLABORATION
SPACE
HACK-A-THON
02 Render ground level approach from yerba buena gardens
01 Skin Study wall section showing intersection of the two skin systems
02
Samantha Buckley, BArch. / Portfolio
page / 34
LOAD PATH AROUND VOID
STEEL DIAGRID
COLUMNS ON GRID
FLOOR SLAB
COLUMNS REDIRECTEDBY DIAGRID
STRUCTURAL COMPONENTS
01 Model cast plaster model with the wood block as the aronson building
02 Building Components shell, floor slabs, and structural grids
03 Axon Diagram diagram showing how each structure element interacts
02
01
Project 02I Look Up
Yerba BuenaMixed-Use Tower
BUILDING ENVELOPE FLOOR SLABS + CORE CORE, COLUMNS, ARCHES, + DIAGRID
LOWMIDHIGH
SOUTH VIEW WEST VIEW NORTH VIEW
PROJECT NORTH
0 10 40FT
0 10 40FT
EAST VIEW
0 10 40FT
03
Samantha Buckley, BArch. / Portfolio
page / 36
01
Project 02I Look Up
Yerba BuenaMixed-Use Tower
01 Lobby Section section to show lobby, office space, and void
02 Render view as you enter lobby through primary void
02
Samantha Buckley, BArch. / Portfolio
page / 38
Passing Time.Project 03
Inspiration taken from the site drive initial response and land art to develop a formal language and visitor center displays.
01 Project passing time point reyes visitor center
03 Site upper pierce ranch point reyes ca
04 Instructors mark donahue paul haydu
02 Course sancutary, building performance, and wood structure
Samantha Buckley, BArch. / Portfolio
page / 40
Samantha Buckley, BArch. / Portfolio
page / 42
01
02
03
04 03 Land Art anchors showing wind blown form
02 Site Plan aerial view showing anchors for land art installation
01 Photo inspiration from wind blown seagrass at upper pierce ranch
04 Render visitor center approach
Project 03Passing Time
Point ReyesVisitor Center
Samantha Buckley, BArch. / Portfolio
page / 44
02 Plan Diagram progression of displays in visitor center, all relating to time
01 Plan Diagram visitor center display progression
01
04 Program Diagram axon view of program adjacencies and circulation
03 Longitudinal Section through viewing tower adjacencies and first series of displays
ENTRY
INFO
OBSERVATION TOWER
BACK OF HOUSE
DISPLAY
DISPLAY
LONGITUDINAL SECTION
FOUCAULT’SPENDULUM
SUN PATH
SEASONS
WATER LEVELS
WAVES
FOG
WIND
FAULTS
EROSIONROCKS
POINT REYES
FLORA
FAUNA
UP
CONFERENCE ROOM/LECTURE HALL
BATHROOMS
ENTRY
CISTERNBACK OF HOUSE
BOOKSTORE
STORAGE
INFODESK
OFFICE
DISPLAY
DISPLAYUP
DN
DN
UP
DN
UP DN
DISPLAY
BACK OF HOUSE
VIEWING DECK
OFFICES
WATER TREATMENTFACILITY DISPLAY
VIEWING DECK
OBSERVATIONTOWEROBSERVATION
TOWER
ENTRY
INFO
OBSERVATION TOWER
BACK OF HOUSE
DISPLAY
DISPLAY
DISPLAYBOOK-STORE ENTRY
OBSER-VATION TOWER
WTFDISPLAYOFFICES
RESTROOM
WINTER SOLSTICENOON SUN
SUMMER SOLSTICENOON SUN
PASSIVE SOLAR DESIGNSTRATEGIES
FRESH AIR CIRCULATION
REST-ROOMS
OFFICES
CONFERENCEROOM
OBSER-VATION TOWER
TRASH ROOM
GENERAL STORAGE
BOOK-STORE
UTILITY YARD
DISPLAY AREA
RANGERSTATION
INFODESK
ELECTRICALROOM
ENTRYHALL MECHANICAL
ROOM DISPLAY AREA
WATER DRIES MORE QUICKLY AT TOP CREATING HARD SHELL
WHERE COLLECTS AT THE LOWER PORTION OF THE ROCK
TAFONE DEVELOPES AS A MICRO CLIMATE WHERE THE ROCK ERODES FASTER
TAFONI DEVELOPMENT
0302
04
Project 03Passing Time
Point ReyesVisitor Center
Samantha Buckley, BArch. / Portfolio
page / 46
POINT REYES VISITOR CENTER
SITE CONDITIONS AND BUILDING PERFORMANCE
ARH 350: STUDIO 6
INSTRUCTORS: MARK DONAHUE AND PAUL HAYDU
CONCRETE STEM WALL
DRAIN ROCK
4” PERFORATED DRAIN PIPE
CURVED GLULAM POST
CURVED 16” GLULAMBEAMS @ 4’-6’ O.C.
STRUCTURAL SLAB
RIGID INSULATION
RIGID INSULATIONSHAPED TO SPECIFIC PROFILE
2 LAYERS 1/4” PLYWOOD
SHAPED PLYWOOD FIN
FREEFORM LATH AND PLASTER FINISH
WATERPROOFINGMEMBRANE
TAR PAPER
ANCHOR BOLTAND PLATE
STEEL POST BRACE
WOOD SHINGLE SKIN
1/2” PLYWOODSUBFLOOR
WOOD FLOORING
CONCRETE TOPPING SLABWITH RADIANT HEATING TUBE
PRESSURE TREATED SILL PLATE
WALL SECTION DETAIL
FOUCAULT’SPENDULUM
SUN PATH
SEASONS
WATER LEVELS
WAVES
FOG
WIND
FAULTS
EROSIONROCKS
POINT REYES
FLORA
FAUNA
UP
CONFERENCE ROOM/LECTURE HALL
BATHROOMS
ENTRY
CISTERNBACK OF HOUSE
BOOKSTORE
STORAGE
INFODESK
OFFICE
DISPLAY
DISPLAYUP
DN
DN
UP
DN
UP DN
DISPLAY
BACK OF HOUSE
VIEWING DECK
OFFICES
WATER TREATMENTFACILITY DISPLAY
VIEWING DECK
OBSERVATIONTOWEROBSERVATION
TOWER
ENTRY
INFO
OBSERVATION TOWER
BACK OF HOUSE
DISPLAY
DISPLAY
FOUCAULT’SPENDULUM
SUN PATH
SEASONS
WATER LEVELS
WAVES
FOG
WIND
FAULTS
EROSIONROCKS
POINT REYES
FLORA
FAUNA
UP
CONFERENCE ROOM/LECTURE HALL
BATHROOMS
ENTRY
CISTERNBACK OF HOUSE
BOOKSTORE
STORAGE
INFODESK
OFFICE
DISPLAY
DISPLAYUP
DN
DN
UP
DN
UP DN
DISPLAY
BACK OF HOUSE
VIEWING DECK
OFFICES
WATER TREATMENTFACILITY DISPLAY
VIEWING DECK
OBSERVATIONTOWEROBSERVATION
TOWER
ENTRY
INFO
OBSERVATION TOWER
BACK OF HOUSE
DISPLAY
DISPLAY
0302
01
TRANSVERSE SECTION
1/8” = 1’-0”
03 Wall Section Detail cut showing wood structure connecting to the foundation
01 Plan Level 2 second half of displays
02 Program Diagram entry sequence and first half of displays
04 Section Diagram a series of form making sections, site and building
04
Project 03Passing Time
Point ReyesVisitor Center
Samantha Buckley, BArch. / Portfolio
page / 48
A public assembly space is derived through a cyclical process of analysis, drawing and model making, at an urban edge condition.
Occupied Void.Project 04
01 Project occupied void embarcadero film theater and tennis club
03 Site 370 drumm street san francisco ca
04 Instructor carol buhrmann
02 Course assembly buildings and context
Samantha Buckley, BArch. / Portfolio
page / 50
Las Meninas Vaillancourt Fountain
“AND OF ALL THE PARTS OF THE FACE CONTRIBUTING TO THIS EFFECT OF DYNAMIC
ECONOMY, THE EYE IS THE MOST SUBTLE AND POWERFUL, THROUGH ITS MOBILITY AND
THROUGH THE IMPORTANCE OF THE GAZE ITSELF, WHICH, IN PAINTING FOR EXAMPLE,
INTERPRETS AND STRUCTUES SPACE ITSELF.” -LOSING FACE, ANTHONY VIDLER
“THE VANISHING POINT AS THE PLACE WHERE THE SUBJECT DRAWS ITSELF OUT OF THE PICTURE, LITERALLY AND FIGURATIVELY” -LIBESKIND’S PRACTICE OF LAUGHTER: AN INTRODUCTION BY STANLEY ALLEN
LITERAL INTERPRETATION OF ANALYSIS DRAWING USING STRUCTURE TO SHOW VISUAL CORRESPON-DENCE, CONNECT THROUGH THE VOID
CONCEPTUAL INTERPRETATION OF PERSPECITIVE AND DIRECTIONALITY
ACTION REACTION PAIR OF MIDGET KICKING DOG
VELAZQUEZ AS A KEY COMPONENT OF MULTIPLE FIGURES AS AUTHOR
01
03 Analysis Drawing based on las maninas, part two
01 Analysis Diagram of las maninas’s implied lines
02 Analysis Drawing based on las maninas, part one
02 03
Project 04Occupied Void
EmbarcaderoFilm Theater
Samantha Buckley, BArch. / Portfolio
page / 52
0101 Analytical Model of las maninas’s implied lines
02 Analysis Drawing based on analytical model
02
Samantha Buckley, BArch. / Portfolio
page / 54
N
DIVIDE DESIGNATED FIGURE BY NUMBER OF BLOCKS REMOVED FROM SITE
MAKE RECTILINEAR FORMS BASED ON THE FIGURES MOST EXTREME DIMENSIONS
MAJOR GEOMETRIES WILL BE SEPERATED
TO EMPHASIZE DIRECTIONALITY BASED ON IMPLIED LINES,CUT OFF A CORNER OR EDGE OF THE VOLUME
BASED ON RELATIONSHIPS WITH THEIR SURROUNDINGS, DIVIDE THE FIGURE WITH A PLANE
DEFINE AN AXIS OF ROTATION OPPOSITE MAJOR DIRECTIONALITY
NOW FIGURES CAN CONNECT STRUCTURALLY THROUGH THE IMPLIED LINES, USING THE NEWLYCREATED VOIDS
SITE: 370 DRUMM STREETSAN FRANCISCO, CA 94111
KEY FIGURES WITHINSITE VACINITY
EACH BLOCK FROM SITE REPRESENTSDIVISABLE FOR PERSEPCTIVE
COIT TOWER
PIER SEVEN
GATEWAY APARTMENTS
VISTA TOWER
TRANSAMERICA BUILDING
FERRY BUILDING
VAILLANCOURT FOUNTAIN
EMBARCADERO CENTER
1
1
2
2
3
45
6
78
4
5
6
7
8
3
9 10 13 1412 15 1611
9
10 13
14
12
15
16
11
01
STREET LEVEL
OUTDOOR FITNESSINDOOR FITNESS
BACK OF HOUSE
OUTDOOR
CINEMA
VOIDS
01 Analytical Mapping of context showing significant figures
02 Analytical Site Plan derived from mapping
02
03
03 Concept Sketches scanned from sketch book
Project 04Occupied Void
EmbarcaderoFilm Theater
Samantha Buckley, BArch. / Portfolio
page / 56
LITERA L INTERPRE TATION OF ANALYSIS DR AWING USING STR UCTURE TO SHOW VIS UAL CORRESPON -DENCE, CONNEC T THRO UGH THE VOID
CONCEPTUA L INTERPRE TATION OF PERSPECITIVE AND DIRECTIONALIT Y
ACTION RE ACTION P AIR OF MIDGE T KICKING DOG
VELAZQUEZ AS A KEY COMPONEN T OF MU LTIPLE FIGURES AS AUTHOR
divide designated figure by number of blocks removed from site
make rectilinear forms based on the figures most extreme dimensions
major geometires will be seperated
to emphasize diretionality based on implied lines, cut off a corner or edge of the volume
based on relationships with their surroundings, divide the figure with a plane
define an axis of rotation opposite major directionality
now figures can connect structurally through the implied lines, using the newly created voids
01 Process Diagram of how to decompose significant figures
02 Analytical Site Model plan view
01
03 Analytical Site Model elevation
02
03
Project 04Occupied Void
EmbarcaderoFilm Theater
Samantha Buckley, BArch. / Portfolio
page / 58
WASHINGTON ST.
DR
UM
M ST.
JACKSON ST.
PACIFIC AVE.
EMBARCADERO
DN
UP
UP
UP
UP
UPUP
UP
UP
UP
UP
UP
UP
LAP POOL
KITCHEN
RESTAURANT
AUDITORIUM
LOBBY
RESTROOM
LOBBY
CONCESSIONS
01
DN
DN
DN
DN
DN
DN
DN
DN
LOBBY
AMPHITHEATER
AUDITORIUM
RESTAURANT PATIO
PIT
DN
DN
DN
DN
DN
DN
DN
DN
LOBBY
AMPHITHEATER
AUDITORIUM
RESTAURANT PATIO
PIT
01 Floor Plan with model overlay
02 Section through auditorium and outdoor amphitheater
03
03 Plan Detail of auditorium
02
Project 04Occupied Void
EmbarcaderoFilm Theater
Samantha Buckley, BArch. / Portfolio
page / 60
Park Roulade.Project 05
01 Project park roulade parkour academy and culinary institute
03 Site eastshore park oakland ca
04 Instructor monica tiulescu
02 Course body, phenomena and space
Phenomenal implications of both occupying and generating space from the perspective of the user.
Samantha Buckley, BArch. / Portfolio
page / 62
03 Vector Diagram mapping the process of baking through vectors
01 Photo Montage mapping the process of baking
02 Aggregate Model 3d mapping of the baking process
01
02
03
Samantha Buckley, BArch. / Portfolio
page / 64
01 Plan showing program relationships and site
02 Model Photo of parkour facilities
01
02
Samantha Buckley, BArch. / Portfolio
page / 66
01
01 Model Photograph view looking into cafe
03 North-South Section cutting through cafe and parkour facilities
02 West-South Section cutting through culinary facilites
Project 05Park Roulade
OaklandParkour Academy and Culinary Institute
02
03
Samantha Buckley, BArch. / Portfolio
page / 68
Personal Works.Project 06
01 Project assorted
A collection of personal enrichment work created through making and hand drafting.
Samantha Buckley, BArch. / Portfolio
page / 70
02
01
01 Table created with new, used, and found materials
03 Flagstaff Mapping 24” x 36”
02 Table grain detail
03 04
04 Cities on a Chair 11” x 14”
Project 06Personal Work
Samantha Buckley, BArch. / Portfolio
page / 72
01
02
01 Cube Study development and deconstruction of a cube
02 Cube Study physical models of cube study
Project 06Personal Work
Samantha Buckley, BArch. / Portfolio
page / 74
01
02
01 Carved Plaster view one
02 Carved Plaster view two
03
03 Carved Plaster view three
Project 06Personal Work
Samantha Buckley, BArch. / Portfolio
page / 76
Professional Works.Project 07
01 Professional Work michael heacock architects, inc.
03 Site assorted
02 Program private residential
Work samples showing construction details, design, and built work from office experience.
Samantha Buckley, BArch. / Portfolio
page / 78
SOUTHWEST ELEVATIONSOUTHEAST ELEVATION
625 Lovell Ave. MILL VALLEY, CA 94941
APN
Revision Description Date
Job Number 10-001
PROGRESS PLANS 07/29/13
Scale:1/8" = 1'-0"
43 Loring AvenueMill Valley CA 94941
T 415.845.5326F 415.873.1301E [email protected]
203 E. Blithedale Ave.Mill Valley CA 94941
T 415.845.5326F 415.873.1301E [email protected]
MICHAEL HEACOCK ARCHITECTS, INC.MICHAEL HEACOCK ARCHITECTS, INC.MICHAEL HEACOCK ARCHITECTS, INC.Ecological Architecture + Green InteriorsEcological Architecture + Green Interiors
Sheet
NOT FOR CONSTRUCTION
1'-6
"
6'-1
1 3/
8"
1 1/2" SCRIBE
8'-2
1/8
"
(E) SHELVES
(N) PANTRY CAB.
(N) BUILT-IN BENCH(CUSHIONS BY OWNER)
8'-8
3/4
"
2'-4
1/2
"
(N) BUILT-IN BENCH(CUSHIONS BY OWNER)
(E) PAINTED GYP. BD. TO REMAIN
(E) BOTTOM CABS.
(E) WOLF 5' RANGE
4" TOEKICK
3'-0
"
1 1/2" SCRIBE
2'-5
3/8
"
(E) ALARM(E) CAB.(E) CAB.
(E) (E) (E) (E)
(E) DOORSTO REMAIN
(N) HINGE TOPW/ GAS SPRINGS
4" KICK
(E) 6" WOOD PANELLING
(E) 6" WOOD PANELLING
(E) WOODCOUNTERS
(N) PANTRY CAB.
4" KICK
(E) PAINTED GYP. BD. TO REMAIN
7'-0"
3'-0
"
COPPERCOUNTER
DW
4" KICK, 4" BACKFLUSH KICK @ SIDE AND BACK FLUSH KICK @ SIDE AND BACK
2"3/4" REVEAL@ BRACKET
3/4" REVEAL@ BRACKET
1'-0"
6"
2"1-1/2" SCRIBE
1'-2"
1 1/2"
5'-10"
KITCHEN ELEVATIONS 3/8" = 1'0"
NORTHWEST ELEVATION NORTHEAST ELEVATION
KITCHEN ISLAND ELEVATIONS 1" = 1'0"
SOUTHWEST SOUTHEAST NORTHEASTNORTHWEST
GUEST BATH ELEVATIONS 3/8" = 1'0"
MASTER BATH ELEVATIONS 3/8" = 1'0"
(N) CABS.
TILE
3'-0
"
CUSTOMCONC. SPLASH
8'-1
1 3/
4"
V.I.F.2'-10 1/2"3'-10"
3'-0
"
(E) 4"X6" POST
10" CUSTOM
CONC. SPLASH
2'-6"FIN.MIN. CLEAR
FRAMELESSGLASS ENCLOSE
7'-7" V.I.F.8'-0" V.I.F.7'-7" V.I.F. 8'-0" V.I.F.
SOUTHWEST ELEVATIONSOUTHEAST ELEVATIONNORTHEAST ELEVATION NORTHWEST ELEVATION
TILE
4" CURB
TILE
REUSE (E)DOOR
MATCH (E)DOORS
2'-7 3/4"
6'-0
"
4'-3 1/4"3'-8 3/4"
3'-0
"
7'-1
0 5/
8"
8'-1
1 3/
4"
7'-8
"
VERIFY HEADERSIZE
7'-2
1/2
"
7'-9
1/2
"
8'-0" V.I.F.
TILE SPLASH
7'-7" V.I.F.8'-0" V.I.F.7'-7" V.I.F.
2'-6"
(E) 4"X6" POST
FRAMELESSGLASS ENCLOSE
SOUTHWEST ELEVATION SOUTHEAST ELEVATIONNORTHEAST ELEVATIONNORTHWEST ELEVATION
NEW HOOD OPTIONS:OPTION A: CUSTOM DOWNDRAFT TO EXTERIOR WALLOPTION B: ROOF MOUNTED REMOTE BLOWER W/ CUSTOM SHROUDOPTION C: OFF THE SHELF HOOD THRU ROOFOPTION D: REPLACE (E) FAN W/ CEILING MOUNTED BLOWER (GAGGENAU AC402 OR SIMILAR)
8 1/
2"2'
-0"
7'-0"
DW
4'-0
"
(N) COPPER SINK BY OWNERWELDED INTO (N) COUNTER
1'-2
"
1'-2" 5'-10"
1'-10 5/8" BRACKET1'-10 5/8" BRACKET1'-10 5/8" BRACKET 1 1/8"CL CL CL CL
1'-3
1/8
" B
RA
CK
ET1'
-3 1
/8"
BR
AC
KET
OPEN SHELVES BELOW
FLUSH COUNTER W/ 1-1/2" SCRIBE @ DW
1-1/2" OVERHANG @ F.O. COUNTER1
1/2"
7" 3'-1 1/2" 2'-0" 1 1/2"
INSTANT HOTSOAP DISPENSER
DECK MOUNTED DISPOSAL SWITCH FRAMED WALL BELOW
1-1/2" SCRIBE
JET CUT STEEL TRUSS WITH CUSTOM PATINA
1'-2"
1 1/2"
OPEN
OPEN
KITCHEN ISLAND PLAN 1" = 1'0"
GENERAL NOTES:1. ALL DRAWINGS BY MICHAEL HEACOCK ARCHITECTS ARE BASED ON ORIGINAL PLANS PROVIDED BY OWNER. FIELD DIMENSIONS MAY VARY.
2. CONTRACTOR SHALL NOTIFY ARCHITECT OF ALL DISCREPANCIES BETWEEN DRAWINGS AND FIELD DIMENSIONS PRIOR TO COMMENSING WITH WORK.
3. ALL WORK SHALL COMPLY WITH THE CURRENT EDITION OF THE CALIFORNIA BUILDING CODE.
INTERIOR ELEVATIONSMASTER BATHGUEST BATHKITCHEN / ISLAND
01
01 Interior Elevations of kitchen, and island details
02 As-Built Plans floor plans of existing home
625 Lovell AvenueMill Valley CA 94941
APN
Revision Description Date
Job Number 13-003
--
-
Scale:
43 Loring AvenueMill Valley CA 94941
T 415.845.5326F 415.873.1301E [email protected]
203 East Blithedale Ave. Suite EMill Valley CA 94941
T 415.845.5326F 415.873.1301E [email protected]
MICHAEL HEACOCK ARCHITECTSMICHAEL HEACOCK ARCHITECTSMICHAEL HEACOCK ARCHITECTSEcological Architecture + green InteriorsEcological Architecture + Green Interiors
Sheet
AS BUILT 07/01/13
HWT
4'-0
"6'
-0"
8'-0
"4'
-0"
6'-0
"8'
-0"
4'-0
"6'
-0"
8'-0
"4'
-0"
6'-0
"8'
-0"
BEDROOM #2
BEDROOM #3KITCHEN
BEDROOM #1
CLOSET
BATH
CLOSET
BATH
CLOSET
BATH
LIVING ROOM
DINING ROOMPANTRY
BALCONYBALCONY BALCONY
A
B
C
D
E
F
G
A
B
C
D
E
F
G
CLAWFOOTTUB
220V
GA
S
GA
S
WASHERDRYER
GA
S
EEELEC.METER EE
EE
W.P.
4
4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
BUILT-IN CABINET
BUILT-IN CABINETDESK
NOT FOR CONSTRUCTION
FLOOR PLAN - EXISTING1/4" = 1'0"
GENERAL NOTES:1. THIS DRAWING IS BASED ON EXISTING FLOOR PLAN PROVIDED BY OWNER AND MAY NOT ACCURATELY REFLECT EXISTING CONDITIONS IN FIELD.2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY ARCHITECT OF ALL DISCREPANCIES OVER 1/4" PRIOR TO EXECUTION OF THE WORK.
Project 07Professional Work
Michael Heacock Architects
02
Samantha Buckley, BArch. / Portfolio
page / 80
02
01 Construction Photo of exterior garage and workout room
02 Construction Photo of exterior at entry
01
03 Construction Photo of kitchen and dining room from living room
04 Construction Photo of inglenook built-ins
05 Construction Photo of master bedroom custom built-ins, niches, and lighting
Project 07Professional Work
Michael Heacock Architects
03
04
05
Samantha Buckley, BArch. / Portfolio
page / 82
4"
1'-0
"
KINGSWOODLIVING ROOM BUILT-IN
8/25/14
LIVING ROOM / INGLENOOK - NORTH
HALL 2 BEYOND
MIN. 1-1/2" SCRIBE, TYP.
STAINED 2X4 FSC #1 FRAMING @ 16" O.C. PER PLAN
FUR DOWN CEILING @ HALLWAY BEYOND, FINAL DESIGN TBD BY ARCH. IN FIELD
C
PER LABC: PROVIDE 1/2" GYP. BD. AT WALL & CLG. FRAMING ABOVE VALENCE, TYP.
RECESSED L.E.D. UPLIGHTS @ VALENCE
HALLWAYBEYOND
LIVING ROOM - WEST / OPTION C
WRAP FIN. PLY INTO HALLWAY AS SHOWN
VALENCE FRAMING
L.E.D. LIGHTING INSIDE VALENCE
3FORM PANELS1
1 1/
2",T
YP.
E.Q
.E.
Q.
E.Q
.E.
Q.
E.Q
.E.
Q.
E.Q. E.Q. E.Q. E.Q. E.Q.
1-1/2" SCRIBBE
4" FLUSHKICK
LOCATE
LIGHT S
WITC
H
ALIGN
2'-6
"
SK185 ANGLED CABINETSCALE: 3/4" = 1'-0"
02
01 Digital Model of custom cabinet
02 Construction Photo of custom cabinet
01
03 Plan Detail of custom cabinet
04 Elevation Detail of custom cabinet
4"
1'-0
"
KINGSWOODLIVING ROOM BUILT-IN
8/25/14
LIVING ROOM / INGLENOOK - NORTH
HALL 2 BEYOND
MIN. 1-1/2" SCRIBE, TYP.
STAINED 2X4 FSC #1 FRAMING @ 16" O.C. PER PLAN
FUR DOWN CEILING @ HALLWAY BEYOND, FINAL DESIGN TBD BY ARCH. IN FIELD
C
PER LABC: PROVIDE 1/2" GYP. BD. AT WALL & CLG. FRAMING ABOVE VALENCE, TYP.
RECESSED L.E.D. UPLIGHTS @ VALENCE
HALLWAYBEYOND
LIVING ROOM - WEST / OPTION C
WRAP FIN. PLY INTO HALLWAY AS SHOWN
VALENCE FRAMING
L.E.D. LIGHTING INSIDE VALENCE
3FORM PANELS1
1 1/
2",T
YP.
E.Q
.E.
Q.
E.Q
.E.
Q.
E.Q
.E.
Q.
E.Q. E.Q. E.Q. E.Q. E.Q.
1-1/2" SCRIBBE
4" FLUSHKICK
LOCATE
LIGHT S
WITC
H
ALIGN
2'-6
"
SK185 ANGLED CABINETSCALE: 3/4" = 1'-0"
4"
1'-0
"
KINGSWOODLIVING ROOM BUILT-IN
8/25/14
LIVING ROOM / INGLENOOK - NORTH
HALL 2 BEYOND
MIN. 1-1/2" SCRIBE, TYP.
STAINED 2X4 FSC #1 FRAMING @ 16" O.C. PER PLAN
FUR DOWN CEILING @ HALLWAY BEYOND, FINAL DESIGN TBD BY ARCH. IN FIELD
C
PER LABC: PROVIDE 1/2" GYP. BD. AT WALL & CLG. FRAMING ABOVE VALENCE, TYP.
RECESSED L.E.D. UPLIGHTS @ VALENCE
HALLWAYBEYOND
LIVING ROOM - WEST / OPTION C
WRAP FIN. PLY INTO HALLWAY AS SHOWN
VALENCE FRAMING
L.E.D. LIGHTING INSIDE VALENCE
3FORM PANELS1
1 1/
2",T
YP.
E.Q
.E.
Q.
E.Q
.E.
Q.
E.Q
.E.
Q.
E.Q. E.Q. E.Q. E.Q. E.Q.
1-1/2" SCRIBBE
4" FLUSHKICK
LOCATE
LIGHT S
WITC
H
ALIGN
2'-6
"
SK185 ANGLED CABINETSCALE: 3/4" = 1'-0"
Project 07Professional Work
Michael Heacock Architects
03
04
Samantha Buckley, BArch. / Portfolio
page / 84
Acknowledgments
There are not enough words to express my gratitude for the support I’ve received from family, friends, faculty, and the profession. Thank you.
Mom, Dad, and Anastasia, thank you for never doubting me, and being my biggest fans.
01 Jennifer Asselstine, Karen Seong, Mark Donahue, Doron Serban, and Carol Buhrmann, thank you for always pushing me to that next level.
02
The American Institute of Architecture Students for honing my skills and giving me so many opportunities.
04
Michael Heacock, for giving me a chance, and giving me my first internship.
03
Samantha Buckley, BArch. / Portfolio
page / 86
01 School academy of art university, school of architecture
02 Course senior portfolio mary scott
03 Student samantha v buckley 562.237.f6996 630 leavenworth street san francisco ca samantha.v.b at gmail.com svbuckley.com
04 Book Binder blurb
05 Photographer samantha v buckley 06 Cover Stock imagewrap matte finish
07 Text Stock mohawk superfine eggshell ultrawhite 100 lb, 148 gsm
08 Fonts gothic725 bd bt gothic725 blk bt 09 Software adobe creative cloud
10 Copyright c. 2015 all rights reserved no part of this publication can be reproduced without express permission from samantha v buckley
Colophon
Just Touch.
Selected workSamantha Buckley BArch.
Just touch.
Selected w
ork / Sam
antha Buckley