Frequency BandsPlans / ListsMain Regulatory Aspects Processing of New Submissions Compatibility Analyses
![Page 3: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/3.jpg)
Frequency BandsFrequency Bands
Plans and Lists frequency bands are identified in :
Article 5 (Allocation Table & Footnotes) of the Radio Regulations (RR)Footnotes of Articles 9 and 11 of the RRArticle 2 of Appendices 30 and 30A
![Page 4: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/4.jpg)
Frequency BandsFrequency Bands
The BSS Plans and Lists cover the following frequency bands:
Region 1: 11.7 - 12.5 GHz (space-to-Earth)14.5 - 14.8 GHz (Earth-to-space)17.3 - 18.1 GHz (Earth-to-space)
Region 2: 12.2 - 12.7 GHz (space-to-Earth)17.3 - 17.8 GHz (Earth-to-space)
Region 3: 11.7 - 12.2 GHz (space-to-Earth)14.5 - 14.8 GHz (Earth-to-space)17.3 - 18.1 GHz (Earth-to-space)
![Page 5: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/5.jpg)
Procedure of AP30/30AProcedure of AP30/30A
Plan Plan List
MIFR MIFR
Region 2 Region 1 and 3
Art. 4 Art. 4
Art. 5 Art. 5Art. 5 4.1.26 / 4.1.27
![Page 6: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/6.jpg)
BSSBSS and Feederand Feeder--link Planslink Plans
Appendix 30 Downlink Plans (12 GHz)Regions 1 and 3 Plan (223 entries)
• Established in 1977 revised in 1997, 2000
Region 2 Plan (170 entries) • Established in 1983 included in the RR in 1985
Appendix 30A Feeder-link Plans (14 & 17 GHz)Regions 1 and 3 Plans (301 entries)
• Established in 1988 revised in 1997, 2000
Region 2 Plan (168 entries)• Established in 1983 included in the RR in 1985
![Page 7: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/7.jpg)
Elements of Plans (1)Elements of Plans (1)
General Basic technical characteristics- Annex 5 of Appendix 30- Annex 3 of Appendix 30A• Type of modulation (digital for R1&3), Polarization, C/N,
Protection ratio, System noise, Channel, Antenna, Necessary bandwidth, satellite station keeping etc.
• Most of them are characteristics used for establishing Plans → can be different for modifications
• However, when “shall” is used → has to be observed
![Page 8: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/8.jpg)
Elements of Plans (2)Elements of Plans (2)
National assignments are included in:Articles 10 & 11 of AP30 (downlink)Articles 9 & 9A of AP30A (feeder-link)
These Articles describe:orbital position, channels, polarisation, power levels, antenna patterns, emission designation, beam coverage, grouping ...
![Page 9: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/9.jpg)
Region 2Region 2 PlanPlan
Downlink and Feeder-link together (OEPM)32 channels for a clusterCluster conceptThe same status given to assignments in the Plan resulting from the application of Article 4 procedure if brought into useCurrently 170 entries
![Page 10: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/10.jpg)
Regions 1 and 3 PlansRegions 1 and 3 Plans
WRC-2000 developed a new Plan thatincluded:10 channels in Region 1 and 12 channels in Region 3;223 downlink entries and 301 feeder-link;5 extended-coverage national beams for 15 administrations;30 "composite" beams;
![Page 11: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/11.jpg)
Regions 1 and 3Regions 1 and 3 ListsLists
WRC-2000 created a Regions 1 and 3 Lists of Additional Uses:
AP30 Downlink List - 12 GHz (currently 43 entries)AP30A Feeder-link List - 14 GHz / 17 GHz (currently 40 entries)
![Page 12: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/12.jpg)
Elements of Lists (1)Elements of Lists (1)
Separated from the Plans and annexed to the Master Register (MIFR).Lists are evolving and will be updated and published periodically by the BR.Assignments in the Lists must be compatible with the Plans and other services.Digital modulation only
![Page 13: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/13.jpg)
Elements of Lists (2)Elements of Lists (2)
Data elements submitted using Appendix 4Non-monopolisation provisions15 year time limit Provisions for use of assignments on a non-interference basis in case of disagreementsProvision to accommodate assignments for new ITU Member StatesLimitation on application of the grouping concept
![Page 14: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/14.jpg)
PPlan & List Beamslan & List Beams
![Page 15: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/15.jpg)
Establishment of the Plans (Lists)Establishment of the Plans (Lists)
Compatibility among assignments in Plan and List
EPM or OEPMCompatibility between Plan and other services or Plan in other Regions
PFD, ΔT/TRegulatory mechanism (Remarks in Articles 10 and 11 of AP30, Articles 9 and 9A of AP30A, Article 9 and 11 of the RR for a specific feeder-link earth station)
![Page 16: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/16.jpg)
Difference between EPM and OEPMDifference between EPM and OEPM
Regions 1 and 3 Approach(separated links)
Region 2 Approach(overall link analyses)
EPMDown OEPM
EPMUp
Interference Interference
Interference Interference
Chann
el 4
Chann
el 4Channel 4
Channel 4
Regions 1 and 3 Approach(separated links)
Region 2 Approach(overall link analyses)
EPMDown OEPM
EPMUp
Interference Interference
Interference Interference
Chann
el 4
Chann
el 4Channel 4
Channel 4
![Page 17: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/17.jpg)
Compatibility Criteria forCompatibility Criteria forRegion 2 Plan AssignmentsRegion 2 Plan Assignments
Overall Equivalent Protection Margin (OEPM) is used as compatibility criteria for the Region 2 Plan as follows:
Mi = protection margin = (dB)
i = interference type (1=co-channel, 2&3=upper & lower first adjacent channels, 4&5= upper & lower second adjacent channels);
PRi = protection ratio for a given interference type i.
⎟⎠
⎞⎜⎝
⎛−= ∑
=
−5
1
)10/(10log10i
M iOEPM
ii
PRIC
aggr
−
![Page 18: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/18.jpg)
Compatibility Criteria forCompatibility Criteria forRegions 1 & 3 Plan AssignmentsRegions 1 & 3 Plan Assignments
Equivalent Protection Margin (EPM) is used as compatibility criteria for the Regions 1 & 3 Plans as follows:
Mi = protection margin = (dB)
i = interference type (1=co-channel, 2 & 3 = upper & lower first adjacent channels);
PRi = protection ratio for a given interference type i.
⎟⎠
⎞⎜⎝
⎛−= ∑
=
−3
1
)10/(10log10i
M iEPM
ii
PRIC
aggr
−
![Page 19: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/19.jpg)
MainMain Regulatory Regulatory Aspects (1)Aspects (1)
BSS Downlink/ Feeder-link- Modification/Addition (Article 4) - Notification/Implementation (Article 5)- Due diligence information (Resolution 49)
Feeder-link earth station- Modification/Addition (Article 9 of RR) - Notification/Implementation (Article 11 of RR)
![Page 20: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/20.jpg)
MainMain Regulatory Regulatory Aspects (2)Aspects (2)
Space Operation/TT&C in the Guardbands- Coordination (Article 2A)- Notification (Article 11 of RR)
Terrestrial- Coordination w.r.t Plan/List (Article 6)FSS- Coordination w.r.t.Plan/List (Article 7)
![Page 21: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/21.jpg)
Notification (Article 5)Notification (Article 5)
Final characteristics for Plan and List assignmentsConfirmation of date of bringing into useRecorded in MIFR (not taken into account in subsequent technical examination)Appendix 4 data should be submitted not earlier than 3 years but not later than 3 months before planned date of bringing assignments into use Published in Part I-S → Part II-S or Part III-SAll assignment data in MIFR can be found in the BR IFIC and the ITU website at:
http://www.itu.int/ITU-R/space/plans/MIFR/
![Page 22: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/22.jpg)
Article 5Article 5 Examination Examination
conformity with the Convention, Table of Allocations, other provisions conformity with the Plan and List including coordination requirement in the Remarks columnAllowed characteristics different from those in the Plan and List in provision 5.2.1 d) Methodology to check the conformity with the Plan and List is in the ROP
![Page 23: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/23.jpg)
Modification / Addition (Article 4)Modification / Addition (Article 4)
Change of characteristics of assignments in the Plan (Region 2)Addition of assignments in the List (R1&3) and in the Plan (Region 2)8 years Regulatory period
to complete Article 4 procedure to be included in the Plan and the Listto bring assignments into use (confirmation though notification procedure)to submit due diligence information (Res.49)
![Page 24: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/24.jpg)
Processing of Article 4 Processing of Article 4 Submissions Submissions (1)(1)
Submission of validated Appendix 4 data (8 years before planned date of bringing into use)
Administration
Acknowledgement by telefax
Publication of the submitted information as received (BRIFIC & http://www.itu.int/ITU-R/space/brific/asreceived/ap30_30a/res55_ap30_30a.html & SNL Part C)
BR
![Page 25: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/25.jpg)
Processing of Article 4 Processing of Article 4 Submissions Submissions (2)(2)
Completeness examination and telefax
Administration
Reply must be sent within 30 days (receivability ROP)
Regulatory/technical examination
BR
Publication of Part A Special Section (BR IFIC) that contain the filed satellite network characteristics and potentially affected administrations. Results of the Bureau’s MSPACEg calculations are also placed on the BR IFIC
![Page 26: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/26.jpg)
Processing of Article 4 Processing of Article 4 Submissions Submissions (3)(3)
Administrations should examine each BR IFIC to see if their assignments are affected and respond within 4 months.
Administration
Affected administrations that do not comment within the 4 month period are deemed to have agreed
After the 4 month period has expired, the BR prepares a list of agreements required and publishes it in a Part D Special Section.
BR
![Page 27: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/27.jpg)
Processing of Article 4 Processing of Article 4 Submissions Submissions (4)(4)
Submission of validated Appendix 4 data (final characteristics) with agreement (request for Part B publication)
Administration
Acknowledgement by telefax
Completeness examination
BR
Reply must be sent within 30 days (receivability ROP)
![Page 28: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/28.jpg)
Processing of Article 4 Processing of Article 4 Submissions Submissions (5)(5)
Regulatory/technical examination
Administration
Submission of notification (confirmation of brining into use), Res.49 due diligence information
Publication of Part B Special Section (BR IFIC) that contain the final characteristics
BR
Request for extension of period of operation for assignments in the List (15 years), if required
![Page 29: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/29.jpg)
Compatibility between Plan and Compatibility between Plan and List AssignmentsList Assignments
Region 2 Plan based on OEPMRegions 1 & 3 Plan and List based on
9 degree Coordination ArcEPM and PFD (downlink)EPM, PFD at any point in the GSO and Off-axis e.i.r.p (uplink)
![Page 30: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/30.jpg)
Compatibility Criteria forCompatibility Criteria forRegions 1 & 3 List AssignmentsRegions 1 & 3 List Assignments
Based on both EPM and (hard & trigger) PFD criteria.
EPM criteria as per the Regions 1 & 3 PlanPFD criteria also used to identify affected assignments as per Annex 1 of AP30
![Page 31: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/31.jpg)
AARTICLERTICLE 44 EXAMINATIONEXAMINATION(Appendix (Appendix 30,30, RegionRegion 22))
Protection of the Region 2 Plan- SPS/MSPACE: OEPM calculations
Protection of Regions 1 & 3 Plan and List- GIBC(PFD space)/GIMS: PFD
Protection of Terrestrial Services- GIBC(PFD terrestrial)/GIMS: PFD
Protection of Regions 1 & 3 FSS - GIBC(PFD space)/GIMS: PFD
![Page 32: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/32.jpg)
AARTICLERTICLE 4 EXAMINATION4 EXAMINATION(Appendix (Appendix 3030A, Region 2)A, Region 2)
Protection of Region 2 Plan- SPS/MSPACE: OEPM calculationProtection of Regions 1 & 3 Plan and List- GIBC(Appendix 8): delta T/T
![Page 33: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/33.jpg)
AARTICLERTICLE 44 EXAMINATIONEXAMINATION(Appendix (Appendix 30,30, RegionsRegions 1 1 && 3)3)
Protection of the Regions 1 & 3 Plan and List- SPS/MSPACE: EPM & PFD calculations
Protection of Region 2 Plan - GIBC(PFD space)/GIMS: PFD
Protection of Terrestrial Services- GIBC(PFD terrestrial)/GIMS: PFD
Protection of Region 2 and Region 3 FSS - GIBC(PFD space)/GIMS: PFD
![Page 34: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/34.jpg)
AARTICLERTICLE 4 EXAMINATION4 EXAMINATION(Appendix (Appendix 3030A, Regions 1&3)A, Regions 1&3)
Protection of Regions 1&3 Plan and Lists- SPS/MSPACE: EPM calculation
Protection of Region 2 Plan - GIBC(Appendix 8): delta T/T
Protection of Region 2 FSS receiving feeder-link space station (17.8-18.1GHz)- GIBC(Appendix 8): delta T/T
![Page 35: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/35.jpg)
Publication of Results of Examination Publication of Results of Examination
Article 4 procedureSpecial Section AP30-30A/E, AP30/E and AP30A/E
• Part A: Publication of proposed characteristics and administrations considered affected
• Part D: Establishment of requirements for agreement
• Part B: Final characteristics entered into the Plan/List
• Part C: CancellationSPS_ALL_IFICnnnn, MSPACEg_results_IFICnnnn
![Page 36: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/36.jpg)
Publication of Results of Publication of Results of ExaminationExamination
Article 5 procedurePart I-S, II-S and III-S of BR IFICSPS_ALL_IFICnnnn
Article 2A procedureSpecial Section AP30-30A/F/CSpecial Section AP30-30A/F/DSPS_ALL_IFICnnnn
Article 7 procedureSpecial Section CR/CSNS on Line or SRS_ALL
![Page 37: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/37.jpg)
Plan and List dataPlan and List data
All Plan and List assignment data can be found on the BR IFIC & the ITU website at:
http://www.itu.int/ITU-R/space/plans/Contained in the SPS database (SNS format).Contains the technical characteristics and reference situation for all Plan, List and pending Article 4 assignments.The SPS database is evolving and is updated regularly.
![Page 38: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/38.jpg)
Useful Website addresses for Useful Website addresses for more informationmore information
http://www.itu.int/ITU-R/space/plans/(General information relating to space plan services)http://www.itu.int/ITU-R/space/plans/FAQ/SpaceCap5.html(Guidelines for capturing Appendix 4 data)
http://www.itu.int/ITU-R/space/snl/(SNL on-Line; list of published network, networks in the backlog)
http://www.itu.int/sns/plans.html(SNS online; online query on SPS_ALL)
![Page 39: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/39.jpg)
Changes at WRCChanges at WRC--0707
Update of Remarks Columns of Article 11 of AP30 & Article 9A of AP30A (Rev. Res.547)Improvement of regulatory texts (more clarity)
Article 2A (regulatory deadline for notification)4.1.3/4.2.6 (timing for Article 4 submissions to lapse)4.2.10 (Alignment of texts with 4.1.7)5.3.1 (regulatory deadline for confirmation of bringing into use)
Protection of submissions after Part A from Part B modifications for Regions 1 & 3 (4.1.11)Update of some regulatory texts in Articles 4 & 5 Correction of some typographical errors
![Page 40: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/40.jpg)
Questions?
![Page 41: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/41.jpg)
Region 1 Region 2 Region 3 11.7-12.5 FIXED BROADCASTING BROADCASTING-SATELLITE MOBILE except aeronautical
mobile
11.7-12.1 FIXED 5.486 FIXED-SATELLITE
(space-to-Earth) Mobile except aeronautical mobile
11.7-12.2 FIXED MOBILE except aeronautical
mobile BROADCASTING BROADCASTING-SATELLITE
12.1-12.2 FIXED-SATELLITE
(space-to-Earth)
12.2-12.7 FIXED MOBILE except aeronautical
mobile BROADCASTING BROADCASTING-SATELLITE
12.2-12.5 FIXED FIXED-SATELLITE
(space-to-Earth) MOBILE except aeronautical
mobile BROADCASTING
12.5-12.75 12.5-12.75 FIXED-SATELLITE
(space-to-Earth) (Earth-to-space)
12.7-12.75 FIXED FIXED-SATELLITE
(Earth-to-space) MOBILE except aeronautical
mobile
FIXED FIXED-SATELLITE
(space-to-Earth) MOBILE except aeronautical
mobile BROADCASTING-
SATELLITE
Article 5 Table of Frequency Allocations
Return
![Page 42: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/42.jpg)
5.487 In the band 11.7-12.5 GHz in Regions 1 and 3, the fixed, fixed-satellite, mobile, except aeronautical mobile, and broadcasting services, in accordance with their respective allocations, shall not cause harmful interference to, or claim protection from, broadcasting-satellite stations operating in accordance with the Regions 1 and 3 Plan in Appendix 30. (WRC-03)
5.490 In Region 2, in the band 12.2-12.7 GHz, existing and future terrestrial radiocommunication services shall not cause harmful interference to the space services operating in conformity with the broadcasting-satellite Plan for Region 2 contained in Appendix 30.
Return
![Page 43: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/43.jpg)
ARTICLE 2 of AP30 (WRC-03)Frequency bands
2.1The provisions of this Appendix apply to the broadcasting-satellite service in the frequency bands between 11.7 GHz and 12.2 GHz in Region 3, between 11.7 GHz and 12.5 GHz in Region 1 and between 12.2 GHz and 12.7 GHz in Region 2 and to the other services to which these bands are allocated in Regions 1, 2 and 3, insofar as their relationship to the broadcasting-satellite service in these bands is concerned.
ARTICLE 2 of AP30A (WRC-03)Frequency bands
2.1The provisions of this Appendix apply to the feeder-links in the fixed-satellite service (Earth-to-space) in the frequency bands 14.5-14.8 GHz and 17.3-18.1 GHz for the broadcasting-satellite service in Regions 1 and 3, and 17.3-17.8 GHz for the broadcasting-satellite service in Region 2 and to other services to which these bands are allocated in Regions 1, 2 and 3 so far as their relationship to the fixed-satellite service (Earth-to-space) in these bands is concerned.
Return
![Page 44: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/44.jpg)
Original Plan (e.g. Region 2)Original Plan (e.g. Region 2)
Return
![Page 45: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/45.jpg)
Cluster ConceptCluster Concept
Return
![Page 46: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/46.jpg)
An example of extended-coverage national beams
Return
0.00
-3.00
![Page 47: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/47.jpg)
An example of composite beams
Return
![Page 48: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/48.jpg)
Grouping ConceptGrouping Concept
The worst interference signal is selectedNo interference calculation between themAll assignments in the group are protected
Return
![Page 49: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/49.jpg)
Remarks column in Article 10Remarks column in Article 10
Return
![Page 50: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/50.jpg)
Bangladesh Plan Beam
![Page 51: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/51.jpg)
Bangladesh Plan Assignments (AP30)
TABLE 6A
Basic characteristics of the Regions 1 and 3 Plan (sorted by administration)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Boresight Space station antennacharacteristics
Space stationantenna gain
Earth stationantenna Polarization
Admin. symbol
Beam identification
Orbital Position
Long. Lat. Ma-jor axis
Minor axis
Orien-tation
Space stationantenna code
Shaped beam
Co-polar Cross- polar Code Gain Type Angle
e.i.r.p. Designation of emission
Identity of the space station
Groupcode Status Remarks
BGD BGD22000 74.00 90.30 23.60 1.46 0.84 135.00 R13TSS 43.56 MODRES 35.50 CR 58.7 27M0G7W P
TABLE 6B
Minimum equivalent protection margin of assignments in the Regions 1 and 3 Plan (sorted by orbital position)
1 2 3 4 5
Channel number
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Orbital Position
Admin. symbol
Beam Identifica- tion
Polar- ization type
Minimum EPM 74.00 BGD BGD22000 CR 12.1 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 4.1 4.1
Return
![Page 52: Broadcasting-Satellite Service Plans and Lists (AP30/30A)€¦ · Mark Griffin ITU-BR Space Regulatory Workshop, July 2008. Outline zFrequency Bands zPlans / Lists zMain Regulatory](https://reader034.vdocuments.us/reader034/viewer/2022052023/6039055090ba9e2b7a23bea6/html5/thumbnails/52.jpg)
Bangladesh Plan Assignments (AP30A)
TABLE 3A2
Basic characteristics of the Regions 1 and 3 feeder-link Plan in the frequency band 17.3-18.1 GHz (sorted by administration) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Boresight Space station
antenna characteristics
Space station antenna gain
Earth station antenna Polarization
Admin. symbol
Beam identification
Orbital position
Long. Lat. Major axis
Minor axis
Orien-tation
Space station antenna code
Shaped beam
Co-polar Cross-polar Code Gain Type Angle
e.i.r.p. Power control
Designation of emission
Identity of the space station
Group code Status Remarks
BGD BGD22000 74.00 90.30 23.60 1.46 0.84 135.00 MODRSS 43.56 MODTES 57.00 CR 84.0 27M0G7W P
TABLE 3B2
Minimum equivalent protection margin in the Regions 1 and 3 feeder-link Plan in the frequency band 17.3-18.1 GHz (sorted by orbital position)
1 2 3 4 5
Channel number
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Orbital Position
Admin. symbol
Beam Identification
Polarization type
Minimum equivalent protection margin
74.00 BGD BGD22000 CR 4.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 0.9 0.9