Problem
• Brackish Stream running backyard
• Desire to “go green” and make use of stream
• Possum Engineering chosen to explore the option and choose the most viable option
Possum Engineering 2
Field Work
• GPS Mapping of Dr. Chandler’s Property
• Water Quality Analysis
• Water Capacity Analysis
Possum Engineering 3
Field Work - GPS Mapping
Possum Engineering 4
Results - GPS Mapping
Possum Engineering 5
Field Work - Water Quality Analysis
Possum Engineering 6
Field Work - Water Quality Analysis
Possum Engineering 7
• On-site analysis with water quality sondes– Dissolved oxygen, specific conductivity,
temperature, pH, chlorophyll• Samples taken for further testing at BYU– Total solids, total suspended & volatile solids– Chemical oxygen demand– Metal concentrations
Results – On-site Analysis
LocationTemp
[°F]
pH
[Units]
SpCond
[µS/cm]
Sal
[ppt]
TDS
[g/l]
LDO%
[Sat]
LDO
[mg/l]
Chlorophyll
[µg/l]
Mouth 60.09 8.86 4057 2.21 2.6 105.7 8.61 0.36
Throat 58.6 8.90 4060 2.21 2.6 106.0 8.79 0.35
SD 61.1 8.84 4053 2.21 2.6 106.8 8.61 0.36
Possum Engineering 8
Results – Solids and COD
LocationTotal Solids
[mg/L]Total Suspended Solids [mg/L]
Total Volatile Solids
[mg/L]
COD
[mg/L]
Mouth 3904.1 2.64 1.025 4.3
Throat 3870.4 2.65 0.395 4.6
SD 4645.6 3.25 0.44 3.6
Possum Engineering 9
Results - ICP
IonMouth
[ppm]
Throat
[ppm]SD [ppm]
Ca 653.80 746.90 672.30
K 86.55 75.36 65.67
Mg 180.80 181.80 158.90
Na 132.70 139.00 114.60
S 470.90 523.80 449.20
Possum Engineering 10
Possum Engineering 11
Results – Water Chemistry
Mineral log IAP Sat. indexAragonite -6.479 1.803Artinite 8.082 -2.21Brucite 14.879 -2.877
CaCO3xH2O(s) -6.479 0.61Calcite -6.479 1.954CaS(s) -9.61 -20.79
Dolomite (disordered) -13.276 2.997Dolomite (ordered) -13.276 3.587
Epsomite -5.046 -2.853Gypsum -4.728 -0.112
Halite -4.142 -5.671Huntite -26.87 2.478
Hydromagnesite -12.309 -4.8KCl(s) -4.558 -5.458Lime 15.197 -18.618
Mineral log IAP Sat. indexMagnesite -6.797 0.778
Mg(OH)2 (active) 14.879 -3.915Mg2(OH)3Cl:4H2O(s) 19.207 -6.793
MgCO3:5H2O(s) -6.797 -2.257MgS(s) -9.928 -27.608
Mirabilite -7.107 -5.536Natron -8.858 -7.168
Nesquehonite -6.797 -2.266Periclase 14.879 -7.575
Portlandite 15.197 -8.247Sulfur -11.135 -9.084
Thenardite -7.107 -7.481Thermonatrite -8.858 -9.555
Vaterite -6.479 1.361
Possum Engineering 12
Slingshot Option
• 264.2 gallons of water/day
Cost - $100,000
Possum Engineering 13
Heat Exchange Option
Cost - $20,000ROI - $1,200/year(Cutting Power Bill by 42-50%)
• 15,000 linear feet of pipe lay coiled 10 feet underground in horizontal slinky loop
• Paxman Heating installed Dr. Astle’s system
Possum Engineering 14
Water Purification Option
Total Cost ≈ $15,500ROI ≈ $420/year
(If 50% of monthly water use provided by RO System)
COST ≈ $500
COST ≈ $14,250
COST ≈ $250
Possum Engineering 15
Legal Constraints• After receiving all
Water Users' Claims, the State Engineer then prepares a proposed determination of water rights of all water users in the drainage or sub-drainage that is served on water users and filed in court
Possum Engineering 16
Final Recommendation • Ground Heat Exchange System
Benefits:• Cut Power Bill in half
Investment Cost:• $20,000
Return on Investment:• $1,200 per year• Pay for itself in 16 years
Possum Engineering 17
Acknowledgements• Dr. Mike Chandler• Dr. Gus Williams• Dr. Jim Nelson• Dr. Wood Miller• Dr. Craig Astle• Craig Hammer• Paxman Heating• Jay Sandberg, P.E.• Phil Stewart• Zola Adjei