Download - boq
PP Item-No Designation of Structure Dept. Type No.
A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01 A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower A 115 TT 1 l*w*h = 8x8x20,5 m A 115 TT 1 1 Filter installed, no wall cladding
A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146 A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01 A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m A 155 Coal Storage 2 x 12500t
A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.
Total
140
10
1000
150
35
130
120
19
125
100
140
140
30
120
6001020
40
Structural Steel
[to]
Manufacturing Unit Price
Erection Unit Price
Total Price
16
72
126
6001020
20
55
30
540
10
8
80
65
190
12
110
10
30
21 540
6
100
25
26
5.651
PP Item-No Designation of Structure Dept. Type No.
A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01
A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower A 115 TT 1 l*w*h = 8x8x20,5 m A 115 TT 1 1 Filter installed, no wall cladding A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146
A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01 A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m A 155 Coal Storage 2 x 12500t A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.
Total
Roof & Wall Cladding
850 1200 2050
5400 3600 9000
200 200
200 160 360
160 160
300 530 830
110 200 310
160 160
570 470 1040
160 160
850 1200 2050
150 150
300 530 830
8700 3500 12200
Roof
[ m² ]
Wall
[ m² ]
Total cladding [
m² ]
Normal Cladding Quantity
Translucent Cladding Quantity
Supply Unit Price
Of NC Material
Supply Unit Price
Of TC Material
Execusion Unit Price
Of Cladding
Works
135 370 505
75 75
110 110 220
130 130
700 550 1250
8700 3500 12200
135 370 505
85 85
340 490 830
175 230 405
7700 3700 11400
30 30
30 30
460 710 1170
100 100
1100 1600 2700
30 30
500 740 1240
85 125 210
150 150
150 230 380 7700 1900 9600
40 70 110
480 800 1280
35 35
100 165 265
47.385 27.050 74.435
Total Price
PP Item-No Designation of Structure Dept. Type No.
A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01 A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower A 115 TT 1 l*w*h = 8x8x20,5 m
A 115 TT 1 1 Filter installed, no wall cladding A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, 20m A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146 A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01 A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m
A 155 Coal Storage 2 x 12500t A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.
Total
Concrete
Iskele Kalıp
1600 1100 2700200 200
90 90
170 170350 350
185 185
25 25
150 150
25 25
25 25
150 150
45 45
150 150
1600 1100 2700200 200200 200
200 200
25 25
2700 2700650 650150 50 200
70 70
Brick Walls [ m² ]
Building [ m³ ]
Foundation [ m³ ]
Total [ m³ ]
Demir donatı
25 25
110 110
50 50
2700 2700650 650150 50 200
90 90
15 15
10 10
5700 5700
25 25
25 25
50 50
90 90
150 150
25 25
50 50
closed bridge for 1 conveyor between feed hopper buildings, no support columns, 20m
400 400
10 10
5300 5300
60 60
30 30
10 10
650 650 16.400 11.235 27.635 0
PP Item-No Designation of Structure Dept. Type No.
A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01 A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower
A 115 TT 1 l*w*h = 8x8x20,5 m A 115 TT 1 1 Filter installed, no wall cladding A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146 A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01
A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m A 155 Coal Storage 2 x 12500t A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.
Total
Roof & Wall Cladding Concrete
140 850 1200 2050 271600 1100 2700
200 200
10 90 90
170 1701000 5400 3600 9000 117 350 350
150 200 200 3 185 185
35 200 160 360 4.7 25 25
130 160 160 2 150 150
120 300 530 830 10.8 25 25
19 110 200 310 4 25 25
125 160 160 2 150 150
100 570 470 1040 13.5 45 45
140 160 160 2 150 150
140 850 1200 2050 271600 1100 2700
200 20030 150 150 2 200 200
200 200
120 300 530 830 10.8 25 25
600 8700 3500 12200 159 2700 270010 650 65020 135 370 505 7 150 50 200
Structural Steel
[to] Roof
[ m² ]
Wall
Total cladding [
m² ]
Weight roof/wall
[to] Building [ m³ ]
Foundation [ m³ ]
Total [ m³ ]
40 75 75 1 70 70
16 110 110 220 2.9 25 25
72 130 130 2 110 110
126 700 550 1250 16.3 50 50
600 8700 3500 12200 159 2700 270010 650 65020 135 370 505 7 150 50 200
20 85 85 1 90 90
55 340 490 830 10.8 15 15
30 175 230 405 5.3 10 10
540 7700 3700 11400 148 5700 5700
10 30 30 0.4 25 25
8 30 30 0.4 25 25
80 460 710 1170 15.2 50 50
65 100 100 1.3 90 90
190 1100 1600 2700 35.1 150 150
12 30 30 0.4 25 25
110 500 740 1240 16.1 50 50
10 85 125 210 2.7
30 150 150 2.0 400 400
21 150 230 380 4.9 10 10540 7700 1900 9600 124.8 5300 5300
6 40 70 110 1.4
100 480 800 1280 16.6 60 60
25 35 35 0.5 30 30
26 100 165 265 3.4 10 10
650 6505.651 47.385 27.050 74.435 967,7 16.400 11.235 27.635
Brick Walls [ m² ]
0