HOSPITAL COMPLEX FOR PAKISTAN KIDNEY & LIVER INSTITUTE AND RESEAR
Volume - II a
for
Bill of Quantities (ADDENDUM #1)
Electrical Works
FINAL DESIGN AND TENDER DOCUMENTS
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
2/147
arcop Page 1 of 1
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Content
Lahore, Pakistan.
S. NO. DESCRIPTION PAGE NO.
1 GRAND SUMMARY Page 1 of 1
2 BILL OF QUANTITIES - DIVISION 14 - CONVEYING EQUIPMENTS Page 1 of 2
3 BILL OF QUANTITIES - DIVISION 25 - INTEGRATED AUTOMATION (BMS) Page 1 of 14
4 BILL OF QUANTITIES - DIVISION 26 - ELECTRICAL Page 1 of 67
5 BILL OF QUANTITIES - DIVISION 27 - COMM UNICATION Page 1 of 18
6 BILL OF QUANTITIES - DIVISION 28 - ELECTRONIC SAFETY & SECURITY Page 1 of 8
7 BILL OF QUANTITIES - DIVISION - MISCELLANEOUS ITEMS Page 1 of 15
8 LISTOF APPROVED MANUFACTURER Page 1 of 13
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
3/147
arcop Page 1 of 1
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore, Pakistan.
AMOUNT
Rs.
AMOUNT
Rs.
AMOUNT
Rs.
(1) (2) (3) (1+2+3)
DIVISION 14 CONVEYING EQUIPMENTS
DIVISION 25 INTEGRATED AUTOMATION (BMS)
DIVISION 26 ELECTRICAL
DIVISION 27 COMMUNICATIONS
DIVISION 28 ELECTRONIC SAFETY & SECURITY
MISC. ITEMS MISCELLANEOUS ITEMS
TOTAL OF DIVISION 14 TO MISC.
Note:
● Contractor is advised to confirm the cable running lengths and termination as per site conditions before procurement of cables / commencement of work.
● The electrical contractor is to ensure the length limit for IT copper cables which should not exceed from 90 meter. If the length exceeds the limit then the electrical contractor should inform the architect and electrical consultant to
rectify the issue.
● Owner can supply any material of Contractor scope at any stage and its cost will be completely deleted from Contractor scope without any kind of adjustment.
● Contractor should mark the selected brands and vendors in approved manufacturers list with submission of Tender Documents. Cost must be as per latest model and advanced technology.
● Owner / Consultant have all the r ights to select any brand / vendor from provided approved manufacturer list, Contractor shall not finalize any brand / vendor without written approval from consultant / owner.
● Cost of Shifting of material from warehouse or from any where at site must be included in quoted price and no other charges will be claimed.
● Preparation of shop drawings is compulsory before execution of work as per requirement of consultant's design and site during project execution with coordination of all other services.
● Submission of As-built drawings (2 sets) after work completion of each floor and 3 sets & soft copy of complete electrical works after final commissioning of project. Approval of final bills are subject to approval of As-built drawings.
● Cable penetrations through walls should be effectively sealed with FM approved fire-rated sealants of equipment fire-rating as the walls. Cable trenches which cross under the base of such walls should also be similarly sealed.
● Insulation Resistance Test , Earthing Resistance Test and Fluke testing reports are mandatory and final bill will not be processed by client / consultant until or unless reports received.
● Phase balancing is in the scope of contractor. Proper load balancing, charts to be provided for each Distribution board.
● Contractors are reequired to include all applicable Taxes, levies etc. as per prevailing Government rules and requlations, in the given quotation.
● All the taxes / levies which are included in the given quotation shall be mentioned clearly.
● After Bid opening / Bid disclosure no deviation in the provided data from the contractor shall be accepted.
PARKING BUILDING
(P2, P1 & Ground to
First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor
& Ground to 10th Floor)
ELECTRICAL WORKSGRAND SUMMARY (ADDENDUM # 1)
(Block 10)ENERGY CENTER
(U.G.Tank, MEP Corridor /
Sub-Station, Lower Ground,
Ground & First Floor)
AMOUNT
Rs.DIVISION # DIVISIONS
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
4/147
DIVISION – 14CONVEYING EQUIPMENT
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
5/147arcop Page 1 of 2
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 14 : Conveying Equipment
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
14 00 00 CONVEYING EQUIPMENTS
Supply, installation, testing and commissioning of Electric Passenger /
Hospital Bed / Service Elevators to carry the specified load serving landing
complete with gearless electric motor, VVVF drive controller, car and
landing doors assemblies, automatic push button control system, landing
controls alarm, telephone and all additional features, interior design
complete, including complete connectionsand control panel ventilation
installation, elevator car guides, buffers, suspension system , counterweight
and safetyspeed governorsystem,c omplete and fitted in to elevator shaft
all as described in the spec ification as per cod e EN-81.
14 00 00.13
VL-01 to VL-03
13-Persons (1000 Kg), Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed
No. - - - 3 - - -
14 00 00.16
SL-01-01 to SL-01-02
18-Persons (1350 Kg). Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed
No. - - - 2 - - -
14 00 00.19
SL-02-01 to SL-02-02 Fire Rated
21-Persons (1600 Kg), Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed
No. - - - 2 - - -
14 00 00.23
BL-01 to BL-02
1750 Kg, Gearless Motor with VVVF control
Capsule Elevator, 1.0 m/sec speed
No. - - - 2 - - -
14 00 00.26
SRV-01
2000 Kg, Gearless Motor with VVVF control
Capsule Elevator, 1.0 m/sec speed
No. - - - 1 - - -
14 00 00.29
SL-03-02 to SL-03-04
21-Persons (1600 Kg). Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed
No. - - - 3 - - -
14 00 00.33
CL-01 to CL-04
1600 Kg, Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed
No. - - - 4 - - -
Note:
- All the e levators are based on latest versions of EN-81 standard and EN-81-
58 for SL-02-01 and SL-02-02.
- All the civil work related with elevators must be carried out by civil
contractor.
- Refer specification sheet of individual elevators attached in
specifica tions.The Bidder shall provide the comp lete Technica l Literature.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
6/147
arcop Page 2 of 2
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 14 : Conveying Equipment
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
Supply, installation, testing and commissioning of electric moving escalator
specified size complete with electric motor, VVVF drive controller, pallets,
balustrades, skirt plate, hand rail guide, PVC hand rail, comb, floor plate,
exterior Hairline finish cladding for entire pallets drive and control panel,
safeties as mentioned in schedule, powerand control wiring and cables
ready to operate. Complete accessories as per selection mentioned in
specifications a s per EN-115.
14 00 00.36
Indoor Type Escalator, 0.5 m/sec speed (9000 Kg) with VVVF c ontrol
Horizontal Distance 40', 18' Rise, 30 deg Inclina tion.
Balustrade Height 3'-4" , W-1000 (Compact Type)
No. - - - 2 - - -
Note:
- All the escalato rs are ba sed on latest versions of EN-115 standard.- All the civil work related with escalators must be carried out by civil
contractor.
- Refer specification sheet of individual escala tors attac hed in
specifications.
Total 14 00 00
( CARRIED FORWARD TO SUMMARY)
TOTAL OF DIVISION - 14
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
7/147
DIVISION – 25INTEGRATED AUTOMATION (BMS)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
8/147
arcop Page 1 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
25 08 00 COMMISSIONING OF INTEGRATED AUTOMATION
Supply, installation, testing and commissioning of Integrated Automation
(BMS), comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing #BMS-02)
25 08 00.13
All Integrated Automation control systemwith automation server, enterprise
server, networko perator workstation,DDC controllers,network architecture
and smart structure shall perform all monitoring and controlsas specified in
the Technical Specifica tions.
J ob - - - 1 1
25 08 00.16All required interfacing and interconnection work with high performance
Ethernet network based on TCP/IP protoc ol. J ob - - - 1 1
25 08 00.19
Programming, testing and commissioning of the complete system as per
client's requirements permissible for the FACP with training sessions of
maintenance personnel's.
J ob - - - 1 1
25 08 00.23
Allow for any other item required forcompletionof system not covered in
BOQ or specifications/ drawingsin accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.
J ob - - - 1 1
Total 25 08 00
( CARRIED FORWARD TO SUMMARY)
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
9/147
arcop Page 2 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 32 00INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT
(VERTICAL TRANSPORTSYSTEM)
Supply, installation, testing and commissioning of Integrated Vertical
Transportation System, comprising of following equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer'sinstructions,
devices and equipmentas perspecificationsand drawingsto completethe
system.
(For Detail Refer Drawing #BMS-08)
25 32 00.13 Ethernet Dual-speed HUBwith multiport I/O as per the drawing. No. - - - 12 - - -
25 32 00.16 24-port Network Switch for device communica tion with main server system. No. - - - 3 - - -
Control Panel/G ateway for communication of vertical transport system.
25 32 00.19 Elevators No. - - - 17 - - -
25 32 00.23 Escalators No. - - - 2 - - -
25 32 00.26
Supply and wiring for Vertical Transport System with 4 Pair Shielded
Communication wire in 25mm dia pvc conduit and other accessories.
Complete in all respect, as per drawings.
Rm. - - - 250 - - -
25 32 00.29
Supply and wiringforinterconnectingVertical TransportSystem from itsmain
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and o ther acc essories. Co mplete in all respect, as per drawings.
Rm. - - - 1,050 - - -
Note:
* Control Panel/Gateway is only applicable if the provided Vertical
Transport Panel not workable.
* BMS Contracto r is advise to verify the cable running leng th and
termination as per site conditions before commence of work.
* BMS Contractor is also advise to verify control pane l before bidd ing.
* BMS Contractor shall provide technical data for all the equipment used.
Total 25 32 00
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
10/147
arcop Page 3 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 32 13INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT
(PARKING MANAGEMENTSYSTEM)
Supply, installation, testing and commissioning of Integrated Parking
Management System, comprising of following equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer'sinstructions,
devicesand equipmentas perspecificationsand drawingsto completethe
system.
(For Detail Refer Drawing #BMS-07)
25 32 13.1316-Port Local Area Network Switch for interconnecting main PC in Parking
management room to BMS Server at First Floor. J ob. 1 - - - - - -
25 32 13.16 System Manager Module to directly co mmunicate to Public Address System. No. 1 - - - - - -
25 32 13.19
Supply and wiring for interconnecting ParkingManagementSystem from its
main controller to BMS Server with control cable in 25mm dia pvc conduit
and o ther acc essories. Co mplete in all respect, as per drawings.
Rm. 625 - - - - - -
Note:
* BMS Contractor shall provide technical data for all the equipment used.
Total 25 32 13
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
11/147
arcop Page 4 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 36 13INTEGRATED AUTOMATION FOR POWER METERS
(ENERGY MANAGEMENTSYSTEM)
Supply, installation, testing and commissioning of Integrated Energy
Management System, comprising of following equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer'sinstructions,
devicesand equipmentas perspecificationsand drawingsto completethe
system.
(For Detail Refer Drawing #BMS-03)
25 36 13.13
Energy Analyser in Distribution Panels for measuring the required electrical
parameters including its required rating Current Transducer.
Class 0.2 (current ac co rding to IEC 61557-12)
Class 0.2 (voltage acc ording to IEC 61557-12)Class 0.5 (power fac tor ac co rding to IEC 61557-12)
Class 0.5S (reac tive energy acc ording to IEC 62053-24)
Class 0.2 (ac tive power acco rding to IEC 61557-12)
Class 0.2 (ac tive energy ac co rding to ANSI C12.20)
Class 0.2S (ac tive energy a cc ording to IEC 62053-22)
Power quality monitoring IEC 62586
Programmablity (logic and math functions)
Voltage sag and swell detection
Waveform capture
Harmonic distortion
Up to the 63rd harmonic
Power quality measurement IEC 61000-4-30 : class S
Compliance report EN 50160
Safety Construction C SA C22.2 No 61010-1 : CAT III, 347...600 V ed. 3
UL 61010-1 : CAT III, 347...600 V ed. 3
EN 61010-1 : CATIII, 400...690 V ed. 3
IEC 61010-1 : CA TIII, 400...690 V ed . 3
IP30 (body) co nforming to IEC 60529IP54 (front) confo rming to IEC 60529
No. 6 75 15
25 36 13.16
Electronic Relay in Distribution Panels for measuring the required electrical
parameters and controlling the circuit breaker.
Zelio Timer Relays to master your time in all simplic ity !
A c omplete range o f Timers combining simplicity, reliability and flexibility
Zelio Timers Relays isa complete and high performance electronic timers
offer. It’s designed for hard-wired logic automated system to complement
industrial programmable lo gic controllers(PLC).
Industry, infrastructure, building, e tc.
Standard motor protection
Line protection
Motor overload, stalling, loss of phase protection
No. 1 22 2
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
12/147
arcop Page 5 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 36 13.19
Gateway in Distribution Panels for communication and data exchange
between devices and BMS server.
MO DBUS RTU OVER TCP/ IP
Ethernet Mod busTCP/ IP to RS485 or RS232 gateway
RS485 or RS232 Modbus serial master to Ethernet Mod busTCP/ IP
10/100Base-Tx Ethernet port
RS485 / RS232 serial port, op tica lly isolated
2-wire and 4-wire compatibility
Support for serial master to ModbusTCP/ IP routing
P30, DIN rail mounted enclo sure
Web Interface for configuration, diagnostic and maintenance
Advanced securitythrough ModbusTCP/IP filtering with configurable access
levels (read-only or full acc ess)
Secure user interface includ ing user's name & password log-in.
User interface in English, French, G erman, and SpanishControl power through PoE (Power over Ethernet) or 24 Vdc power source
Rated for use in industrial environments (-25 to 70oC)
No. 1 22 1
25 36 13.23
24-Port Local Area Network Switch for gateway communication with BMS
server.
10BASE-T: ca vo a 2 copp ie UTP/STP CA T3, CAT4 o
CA T5 EIA/TIA 568 100 (100 M)
100BASE-TX: ca vo a 2 coppie UTP/STP CAT5 EIA/TIA 568 100.
No. 1 1 1
25 36 13.26
Supply andwiringforRS-485 orBelden Cable in25mm dia PVC conduitand
other accessories from individual device to gateway. Comp le te in a ll
respect, as per draw ings.
Rm. 300 3,750 500
25 36 13.29
Supply and wiring for CAT-6 Cable in 25mm dia pvc conduit and other
acc essories from individual gateway to network switch. Complete in all
respect, as per draw ings.
Rm. 150 1,900 350
25 36 13.33
Supply and wiring forinterconnecting Energy Management Systemfrom its
main controller/PC to BMS Server with contro l cable in 25mm dia pvc
conduit and other accessories. Complete in all respect, as per drawings.
J ob. - - - 1 - - -
25 36 13.36
Software: Struxuwrae Power Monitoring System 7.2 or latest version SPM
Complete software with 75device for Energy analyzer, Server, Engineering
and we b c lient license.
J ob. - - - 1 - - -
25 36 13.39Programmable Logic ControllerPLC (40I/Os) witha cc essories for Substation-
1.No. - - - 1 - - -
25 36 13.43 Control Panel No. - - - 1 - - -
Note:
* BMS Contracto r is advise to verify the cable running leng th and
termination as per site conditions before commence of work.
* BMS Contractor shall provide technical data for all the equipment used.
Total 25 36 13
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
13/147
arcop Page 6 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 36 26INTEGRATED AUTOMATION FOR LIGHTING RELAYS
(LIGHTING CONTROL SYSTEM)
Supply, installation, testing and commissioning of Integrated LightingControl
System, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing #BMS-06)
25 36 26.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main
Lighting C ontrol PC/ Touch Screen to BMS Server. J ob. 1 1 1
25 36 26.16Network Bridge for seperating individual sub-stations/network cloud or
where applicable.No. 1 1 1
25 36 26.19
Supply and wiring for CAT-5e Cable in 25mm dia pvc conduit and other
acc essoriesfrom relaytorelayand from touch screentorelay. Complete in
all respect, as per drawings.
Rm. 550 2,500 175
25 36 26.23
Supply and wiring for interconnecting Lighting Control System from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and o ther acc essories. Co mplete in all respect, as per drawings.
Rm. 440 750 100
Note:
* BMS Contractor is advise to verify the cable running length and
termination as per site conditions before commence of work.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total 25 36 26
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
14/147
arcop Page 7 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 36 29INTEGRATED AUTOMATION FORUPSMONITORS(UNINTERRUPTIBLE POWER
SUPPLY)
Supply, installation, testing and commissioning of Integrated UPS System,
comprising of following equipmentsincluding all acc essoriesrequired forthe
completion of the system in all respects with manufacturer's instructions,
devicesand equipmentas perspecificationsand drawingsto completethe
system.
(For Detail Refer Drawing #BMS-05)
25 36 29.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main
UPS to BMS Server. J ob. - - - 1 1
25 36 29.16 System Manager Module to directly communicate to UPS. No. - - - 1 1
25 36 29.19
Supply and wiringforinterconnecting UPSSystem to BMSServerwith control
cable in 25mm dia pvc conduit and other accessories. Complete in all
respect, as per draw ings.
Rm. - - - 225 100
Note:
* BMS Contractoris advise to verify need of System Manager Module and
the brand of UPS.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total 25 36 29
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
15/147
arcop Page 8 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 36 33 INTEGRATED AUTOMATION FOR DIESEL GENERATOR SETS(6 No. 2000kVA)
Supply, installation, testing and commissioning of Integrated Diesel
Generator Sets, comprising o f fo llowing equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer'sinstructions,
devicesand equipmentas perspecificationsand drawingsto completethe
system.
25 36 33.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main
Access Control System PC/ Controller to BMS Server at First Floor. J ob. - - - - - - 1
25 36 33.16
System Manager Module to directly communicate to Access Control
System. No. - - - - - - 1
25 36 33.19Fuel Tank Sensors to directly communicate with Diesel underground and
day tank pumps including all its controls etc.. J ob. - - - - - - 1
25 36 33.23
Supply and wiring for all Control cables required to complete the system
from its main controller / PC to BMSServer in 25mm dia pvc conduit and
other accessories. Co mplete in all respect, as per drawings.
J ob. - - - - - - 1
Note:
* BMS Contractoris advise to verify need of System Manager Module and
the brand of Access Control System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total 25 36 33
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
16/147
arcop Page 9 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 38 00INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(FIRE ALARM SYSTEM)
Supply, installation, testing and commissioning of Integrated Fire Alarm
System, comprising of following equipments based on communication
protocol ModbusRTU including all accessories required forthe completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing #BMS-04)
25 38 00.1316-Port Local Area Network Switch for interconnecting main Fire Alarm
PC/ Panel to BMS Server. J ob. - - - 1 1
25 38 00.16 System Manager Module to directly co mmunicate to Public Address System. No. - - - 1 1
25 38 00.19
Supply and wiring for interconnecting Fire Alarm System from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and o ther acc essories. Co mplete in all respect, as per drawings.
Rm. - - - 225 100
Note:
* BMS Contractoris advise to verify need of System Manager Module and
the brand of Fire Alarm System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total 25 38 00
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
17/147
arcop Page 10 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 38 13INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(PUBLIC ADDRESSSYSTEM)
Supply, installation, testing and commissioning of Integrated Public Address
System, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing #BMS-05)
25 38 13.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main
Public A ddress PC/ Amplifierl to BMS Server at First Floor. J ob. - - - 1 - - -
25 38 13.16 System Manager Module to directly c ommunica te to Fire Alarm System. No. - - - 1 - - -
25 38 13.19
Supply and wiring forinterconnecting Public AddressSystem from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and o ther acc essories. Co mplete in all respect, as per drawings.
Rm. - - - 225 - - -
Note:
* BMS Contractoris advise to verify need of System Manager Module and
the brand of Public Add ress System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total 25 38 13
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
18/147
arcop Page 11 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 38 16INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(VIDEO SURVEILLANCE)
Supply, installation, testing and commissioning of Integrated Video
Survellance, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing #BMS-05)
25 38 16.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main
Video Survellanc e PC /NVR to BMS Server. J ob. - - - 1 1
25 38 16.16 System Manager Module to directly communicate to Video Survellance. No. - - - 1 1
25 38 16.19
Supply and wiring for interconnecting Video Survellance from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and o ther acc essories. Co mplete in all respect, as per drawings.
Rm. - - - 1,125 225
Note:
* BMS Contractoris advise to verify need of System Manager Module and
the brand of Video Survellance.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total 25 38 16
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
19/147
arcop Page 12 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
25 38 19INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(AC CESSCONTROL SYSTEM)
Supply, installation, testing and commissioning of Integrated AccessControl
System, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing #BMS-05)
25 38 19.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main
Access Control System PC /C ontroller to BMS Server. J ob. - - - 1 1
25 38 19.16System Manager Module to directly communicate to Access Control
System.No. - - - 1 1
25 38 19.19
Supply and wiring forinterconnecting Access Control Systemfrom its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and o ther acc essories. Co mplete in all respect, as per drawings.
Rm. - - - 225 225
Note:
* BMS Contractoris advise to verify need of System Manager Module and
the brand of Acc ess Control System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total 25 38 19
( CARRIED FORWARD TO SUMMARY)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
20/147
arcop Page 13 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
LOCAL SUPPLIESAND SERVICESTO C OMPLETE JOB OF INTEGRATED
AUTOMATION FOR ALL SYSTEMS
1
Engineering, Programming, commissioning and Handing over of all above
systems comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respec ts with manufacturer's instructions.
J ob. - - - 1 1
2
BMSComputer
HP Prodesk 400 G2
Mic ro towe r Business PC
Intel core i5-4590S proc essor atleast 3.7 GHz
Max turbo frequency (3.0 GHz base frequency) 6 MB cache, 4 cores, 4
threads intel HDG raphics4600 supportsDDR3 memory upto 1600MT/sdata
rate.
Memory 2 GB PC3-10600 Memory (1x2GB)
Hard Disk 500 GB 7200 RPM SATA-6G
HP Optic al d rives: HP Supermulti DVD-RW
Display HP 18.5" LCD Displa y
Ope rating system windows 7 professional w ith genuine liscense
No. - - - 1 - - -
3
HP ProLiant DL 160 Generation 8
Processor: (1) Intel Xeon E5-2603 (1.8 GHz / 4 core / 10 MB/ 6.4GT-sQPI /
80W)Memory: 4 GB Hard disk:HP 500 GB 6G SATA 7.2Krpm LFF (3.5inch)SC
midline NIC:HP 361iintegrated dual portgigabit. Server adaptorHP Optical
drives: HP 9.5mm SATA DVD ROM Optical drive storage controllerHP Power
supplies: 500W Platinum FIO Power Supply with backplane form factor: 1U
Rack.
No. - - - 1 - - -
Note:
* BMS Contractoris advise to verify need of System Manager Module and
the brand of Public Add ress System.* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.
Total
( CARRIED FORWARD TO SUMMARY)
TOTAL OF DIVISION - 25
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
21/147
arcop Page 14 of 14
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Summary of Cost
Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)
AMOUNTRs.
AMOUNTRs.
AMOUNTRs.
25 08 00 CO MMISSIONING OF INTEGRATED AUTOMATION
25 32 00INTEGRATED AUTOMATION FOR CO NVEYING EQUIPMENT
(VERTICAL TRANSPORTSYSTEM)
25 32 13INTEGRATED AUTOMATION FOR CO NVEYING EQUIPMENT
(PARKING MANAG EMENTSYSTEM)
25 36 13INTEGRATED AUTOM ATION FOR POWER METERS
(ENERGY MANAGEMENTSYSTEM)
25 36 26INTEGRATED AUTOMATION FO R LIGHTING RELAYS
(LIGHTING C ONTROL SYSTEM)
25 36 29 INTEGRATED AUTOM ATION FOR UPS MO NITORS (UPS SYSTEM)
25 36 33INTEGRATED AUTOM ATION FOR DIESEL GENERATOR SETS
(6 NO. 2000kVA)
25 38 00INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(FIRE ALARM SYSTEM)
25 38 13INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(PUBLIC ADDRESS SYSTEM)
25 38 16INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(VIDEO SURVEILLANC E)
25 38 19INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM
(AC CESS CONTROL SYSTEM)
LOC AL SUPPLIES AND SERVICES TO CO MPLETE J OB OF INTEGRATEDAUTOMATION FOR ALL SYSTEMS
TOTAL OF DIVISION - 25
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)ITEM DESCRIPTION
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
22/147
DIVISION – 26ELECTRICAL
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
23/147
arcop Page 1 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
26 05 13 MEDIUM VOLTAGE CABLES
Supply, installation, testing, commissioning and termination of following8.7/15kV,Cu/XLPE/SWA/PVC (MVCables) inalready installed Cable trench /Cable ladder / Cable tray / Duct Bank. Complete in all respects.
26 05 13.13From Energy Center-1 To Sub Station-1
3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - 410 - - -
26 05 13.16From Sub Station-1 To Energy Center-1
3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - 410 - - -
26 05 13.19From Grid Station Feeder-1 To Energy Center
3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - - - - 725
26 05 13.23From Grid Station Feeder-7 (Backup Feeder) To Energy Center
3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - - - - 750
26 05 13.26 3C, 120 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC Rm. - - - - - - 10
26 05 13.29From Step up Transformer to MV Switch. (5 No.)
3C, 150 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - - - - 125
26 05 13.33From MV Switch to Step down Transformer (4 No.)
3C, 240 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - 60 - - 60
15KV CABLE TERMINATION KITS
Supply, installation, testing and commissioning of 15KV,XLPE-CU,MV Cable
Termination Kit at both ends with 3M, Raychem or equivalent approvedbrand termination kit etc.
26 05 13.363C, 300 Sq.mm 15KV, Cable Termination kits including all terminationaccessories like HTtape etc.
J ob. - - - 6 43
Note: Contractor is advised to confirm the cable running lengths andtermination as per site conditions before commencement of work.
Total Rs. Section- 26 05 13
(CARRIED FORWARD TO SUMMARY)
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
24/147
arcop Page 2 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19 LOWVOLTAGE ELECTRICAL POWER CONDUCTORSAND CABLES
Supply, installation, testing & commissioning of following items including allmaterial, tools, labor& accessories required for completion of worka s perdescription & drawings. Complete in all respects.
26 05 19.13
Circuit wiring from DB to switch board including any wiring from switchboard to switch board with 2x2.5 Sq.mm +ECC 1x2.5 Sqmm, 1-core PVCwires in 25mm dia of pvc conduit exposed / concealed as shown ondrawings. Comple te in all respec ts.
No. 24 483 36
26 05 19.16
Wiring forlightpoint from switch board/ Dimmerboard to first lightpointwith
1.5 Sq.mmcommon neutralof 2.5Sq.mm and common ECC of 2.5 Sq.mm+wires in 25mm dia of exposed / concealed PVC conduit as shown ondrawings.
No. 116 2,368 187
26 05 19.19 Same as above item but wiring from light point to point. No. 58 2,216 136
26 05 19.23Wiring forGroup Control Light fixtures From DB to first light point with 2x2.5Sq.mm +ECC 1x2.5Sq.mm in 25mmdia PVC conduit exposed / concealedas shown on drawings. Complete in all respects.
No. 132 152 26
26 05 19.26 Same as above item but from light point to point. No. 1,120 2,373 311
26 05 19.29
Emergency Circuitwiring from DBto switch board including any wiring fromswitch board to switch board with 2x2.5 Sq.mm +ECC 1x2.5 Sqmm, 1-corePVC wires in 25mmdia of pvc conduit exposed / concealed asshownondrawings. Comple te in all respec ts.
No. - - - 278 - - -
26 05 19.33
Emergency Wiring forlightpoint from switch board/ Dimmer board to firstlightpointwith1.5Sq.mm common neutralof 2.5 Sq.mm and common ECCof 2.5 Sq.mm +wiresin 25mm dia of exposed / concealed PVC conduitasshown on draw ings.
No. - - - 525 - - -
26 05 19.36 Same as above item b ut wiring from light point to point. No. - - - 606 - - -
26 05 19.39Wiring forGroupControl Emergency & Exit Lightfixturesfrom DBto first lightpoint with 2x2.5 Sq.mm +ECC 1x2.5 Sq.mm in 25mm dia PVC Conduit asexposed / concealed shown on drawings. Complete in all respects.
No. 48 79 9
26 05 19.43 Same as above item but wiring from light point to point. No. 528 507 71
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
25/147
arcop Page 3 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
Wiring of 13A/15A Switch Socket unit (for Normal Power) from DB to firstoutlet with following size of wires in 25mm dia PVC conduit of exposed /concealed as shown on drawings. Complete in all respects.
26 05 19.46 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm Cu/PVC No. 42 1,268 29
26 05 19.49 Same as item above but wiring from outlet to outlet. No. 168 5,603 102
Wiringof 13A FlatPin Switch Socketunit(for UPSPower)from DBto first outletw ith fo llowing size o f w ires in 25mm dia PVC conduit o f exposed /concea led as shown on drawings. Complete in all respects.
26 05 19.53 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm Cu/PVC No. - - - 711 10
26 05 19.56 Same as item above but wiring from outlet to outlet. No. - - - 1,264 30
Wiring of 20A Switch Socketunit(forHand Dryer) from DBto first outlet withfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.
26 05 19.59 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm Cu/PVC No. 1 34 1
Wiring of 20A DPIsolator Switch from DBto first outlet with following size of wires in 25mmdia size PVC conduit ofexposed / concealed asshownondrawings. Comple te in all respec ts.
26 05 19.63 2C, 4 Sq.mm Cu/PVC /PVC +ECC 1x4 Sq.mm Cu/PVC No. 36 210 12
Wiring of 20A 4PIsolator from DBto first outlet with following size of wires in25mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.
26 05 19.66 4C, 4 Sq.mm Cu/PVC /PVC +ECC 1x4 Sq.mm Cu/PVC No. 16 26 17
Wiring of 32A 4PIsolator from DBto first outlet with following size of wires in38mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.
26 05 19.69 4C, 6 Sq.mm Cu/PVC /PVC +ECC 1x6 Sq.mm Cu/PVC No. - - - 8 8
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
26/147
arcop Page 4 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
Wiring of 40A 4PIsolator from DBto first outlet with following size of wires in38mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.
26 05 19.73 4C, 10 Sq.mm Cu/PVC/PVC +ECC 1x10 Sq.mm Cu/PVC No. - - - 8 4
Wiring of 63A 4PIsolator from DBto first outlet with following size of wires in38mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects..
26 05 19.76 4C, 16 Sq.mm Cu/PVC/PVC +ECC 1x16 Sq.mm Cu/PVC No. - - - 14 9
Wiring of 125A 4PIsolator from DBto first outlet with following size of wiresin
50mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.
26 05 19.79 4C, 50 Sq.mm Cu/ XLPE/PVC +ECC 1x25 Sq.mm Cu/ PVC No. - - - 4 2
Wiring of 16A, 3-pin Industrial Socketunitfor UPS from DBto firstoutletwithfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.
26 05 19.83 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm CU/PVC No. - - - 4 4
Wiring of 32A, 3-pin Industrial SocketunitforUPS/ IDF Racks from DBto firstoutletwith following size of wiresin 25mm dia size PVC conduit of exposed /concealed as shown on drawings. Complete in all respects.
Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.
26 05 19.86 2C, 10 Sq.mm Cu/PVC/PVC +ECC 1x10 Sq.mm Cu/PVC No. - - - 29 2
Wiring of 16A, 5-pinIndustrial Socketunit forIDF Racksfrom DBto firstoutletwith following size of wires in 25mm dia size PVC conduit of exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.
26 05 19.89 2C, 4 Sq.mm Cu/PVC /PVC +ECC 1x4 Sq.mm Cu/PVC No. - - - 1 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
27/147
arcop Page 5 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
Wiring of 32A, 5-pin Industrial Socket unit forUPS from DBto first outlet withfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.
26 05 19.93 4C, 6 Sq.mm Cu/PVC /PVC +ECC 1x6 Sq.mm Cu/PVC No. - - - 4 2
Wiring of 63A, 5-pin Industrial Socket unit forUPS from DBto first outlet withfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.
26 05 19.96 4C, 16 Sq.mm Cu/PVC/PVC +ECC 1x16 Sq.mm Cu/PVC No. - - - 2 - - -
Supply, installation, testing, commissioning and termination of following sizeof CU/PVC/PVC & CU/XLPE/PVC Cables for Distribution Board in alreadyinstalled PVC conduit / Cable tray,including allac cessories, Complete inallrespect as shown on drawing.
26 05 19.99From UMDB to UPS & UPS to UMDB2 No. 4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 30 - - -
26 05 19.103From TAP OFF UNITto SMDB-LGA2 No. 4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 10 - - -
26 05 19.106From TAP OFF UNITto SMDB-LGB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.109From TAP OFF UNITto SMDB-GA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC Rm. - - - 10 - - -
26 05 19.113From TAP OFF UNITto SMDB-FA4C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.116From TAP OFF UNITto SMDB-SA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.119From TAP OFF UNITto SMDB-SB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.123From TAP OFF UNITto SMDB-TA4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
28/147
arcop Page 6 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.126From TAP OFF UNITto SMDB-TB2 No. 4C, 150 Sq.mm Cu/XLPE/PVC +ECC 1C, 70 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.129From TAP OFF UNITto SMDB-44C, 95 Sq.mm Cu/XLPE/PVC +ECC 1C, 50 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.133From TAP OFF UNITto SMDB-54C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.136From TAP OFF UNITto SMDB-64C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.139From TAP OFF UNITto SMDB-74C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.143From TAP OFF UNITto SMDB-84C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.146From TAP OFF UNITto SMDB-94C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.149From TAP OFF UNITto SMDB-ROOF-A4C, 95 Sq.mm Cu/XLPE/PVC +ECC 1C, 50 Sq.mm Cu/ PVC
Rm. - - - 20 - - -
26 05 19.153From TAP OFF UNITto SMDB-ROOF-B4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 20 - - -
26 05 19.156From TAP OFF UNITto USMDB-LGA4C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.159From TAP OFF UNITto USMDB-LG-B4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.163From TAP OFF UNITto USMDB-GA4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.166From TAP OFF UNITto USMDB-GB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.169From TAP OFF UNITto USMDB-FA4C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.173From TAP OFF UNITto USMDB-FB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.176From TAP OFF UNITto USMDB-SA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
29/147
arcop Page 7 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.179From TAP OFF UNITto USMDB-SB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.183From TAP OFF UNITto USMDB-TA4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.186From TAP OFF UNITto USMDB-TB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.189From TAP OFF UNITto USMDB-44C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.193From TAP OFF UNITto USMDB-54C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.196From TAP OFF UNITto USMDB-64C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.199From TAP OFF UNITto USMDB-74C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.203From TAP OFF UNITto USMDB-84C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.206From TAP OFF UNITto USMDB-94C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.209From TAP OFF UNITto USMDB-OT2 No. 4C, 185 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 15 - - -
26 05 19.213From TAP OFF UNITto USMDB-OT-14C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.216From TAP OFF UNITto USMDB-OT-24C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 15 - - -
26 05 19.219From TAP O FF UNITto SMDB-HVAC-LGA4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 15 - - -
26 05 19.223From TAP O FF UNITto SMDB-HVAC-LGB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.226From TAP OFF UNITto SMDB-HVAC-G A4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.229From TAP O FF UNITto SMDB-HVAC-GB4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
30/147
arcop Page 8 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.233From TAP OFF UNITto SMDB-HVAC-FA4C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.236From TAP OFF UNITto SMDB-HVAC-FB4C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.239From TAP OFF UNITto SMDB-HVAC -SB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.243From TAP OFF UNITto SMDB-HVAC-TA4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.246From TAP OFF UNITto SMDB-HVAC -TB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.249From TAP O FF UNITto SMDB-HVAC-44C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.253From TAP O FF UNITto SMDB-HVAC-54C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.256From TAP O FF UNITto SMDB-HVAC-64C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.259From TAP O FF UNITto SMDB-HVAC-74C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.263From TAP O FF UNITto SMDB-HVAC-84C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.266From TAP O FF UNITto SMDB-HVAC-94C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.269From TAP OFF UNITto DB-LGA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.273From TAP OFF UNITto DB-LA4C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.276From TAP OFF UNITto DB-MB4C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.279From TAP O FF UNITto DB-CAFE4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.283From TAP OFF UNITto DB-MKL4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 15 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
31/147
arcop Page 9 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.286From TAP OFF UNITto DB-HS4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.289From TAP OFF UNITto DB-LGB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.293From TAP OFF UNITto DB-SS4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.296From SMDB LGB to DB-ISOLATORS-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 70 - - -
26 05 19.299From SMDB LGB to DB-ISOLATORS-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 70 - - -
26 05 19.303From SMDB-LG-B to DB-DK 4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 20 - - -
26 05 19.306From TAP OFF UNITto DB-LG-RT4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 20 - - -
26 05 19.309From TAP OFF UNITto UDB-LGA4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.313From TAP OFF UNITto UDB-LA4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.316From TAP OFF UNITto UDB-MB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.319From TAP OFF UNITto UDB-CA FE4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.323From TAP OFF UNITto UDB-MKL4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.326From TAP OFF UNITto UDB-LGB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.329From TAP OFF UNITto UDB-SS4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.333From USMDB-LG-B to UDB-DK 4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.336From TAP OFF UNITto UDB-RT4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
32/147
arcop Page 10 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.339From TAP OFF UNITto UDB-CLB4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.343From TAP OFF UNITto UDB-HS4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.346From SMDB-GA to DB-GA-14C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.349From TAP O FF UNITto DB-GA-24C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.353From TAP O FF UNITto DB-GA-34C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.356From TAP OFF UNITto DB-EXT-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.359From TAP OFF UNITto DB-EXT-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.363From TAP OFF UNITto DB-EXT-34C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.366From TAP O FF UNITto DB-MMD4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 20 - - -
26 05 19.369From TAP OFF UNITto DB-SCC4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 20 - - -
26 05 19.373From TAP OFF UNITto DB-XR4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 25 - - -
26 05 19.376From TAP OFF UNITto DB-GB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.379From TAP OFF UNITto DB-GB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.383From TAP OFF UNITto DB-DIA4C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.386From TAP OFF UNITto DB-TR14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.389From TAP OFF UNITto DB-TR24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
33/147
arcop Page 11 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.393From TAP OFF UNITto DB-PET-CT4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 10 - - -
26 05 19.396From TAP O FF UNITto DB-CT(4 Nos.)4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 40 - - -
26 05 19.399From TAP OFF UNITto DB-XR1 (5 Nos.)4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 75 - - -
26 05 19.403From TAP OFF UNITto DB-SPECT(2 Nos.)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 25 - - -
26 05 19.406From TAP OFF UNITto DB-MRI (2 Nos.)4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC
Rm. - - - 20 - - -
26 05 19.409From TAP OFF UNITto UDB-GA14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.413From TAP OFF UNITto UDB-GA24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.416From TAP OFF UNITto UDB-GA34C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.419From TAP OFF UNITto UDB-DIA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.423From TAP OFF UNITto UDB-SSC4C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.426From TAP OFF UNITto UDB-MMD4C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.429From TAP OFF UNITto DB-FA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.433From TAP OFF UNITto DB-FA-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.436From TAP OFF UNITto DB-FA-34C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.439From TAP OFF UNITto DB-END (16 Nos.)4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 80 - - -
26 05 19.443From TAP OFF UNITto DB-ERCP (4 Nos.)4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
34/147
arcop Page 12 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.446From TAP O FF UNITto DB-OT(1 to 6)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 90 - - -
26 05 19.449From TAP OFF UNITto UDB-FA-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.453From TAP OFF UNITto UDB-FA-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.456From TAP OFF UNITto UDB-FA-34C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.459From TAP OFF UNITto DB-SA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.463From TAP OFF UNITto DB-SA-24C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 5 - - -
26 05 19.466From TAP OFF UNITto MDB-24C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 15 - - -
26 05 19.469From TAP OFF UNITto LIT-14C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 10 - - -
26 05 19.473From TAP OFF UNITto DB-RAD (3 Nos.)4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 45 - - -
26 05 19.476From TAP OFF UNITto DB-SB-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.479From TAP OFF UNITto DB-SB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.483From TAP OFF UNITto DB-SICU (58 Nos.)4C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 290 - - -
26 05 19.486From TAP OFF UNITto UDB-SA-14C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.489From TAP OFF UNITto UDB-SA-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.493From TAP OFF UNITto UDB-SA-34C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.496From TAP OFF UNITto UDB-SB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
35/147
arcop Page 13 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.499From TAP OFF UNITto UDB-SB-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.503From TAP OFF UNITto UDB-OT(18 Nos)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 270 - - -
26 05 19.506From TAP OFF UNITto UDB-TO-H4C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.509From TAP OFF UNITto DB-ME-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.513From TAP OFF UNITto DB-ME-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.516From TAP OFF UNITto DB-SD4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.519From TAP OFF UNITto DB-CA-TA4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.523From TAP OFF UNITto DB -WASH4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.526From TAP OFF UNITto ISOLATOR -14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 70 - - -
26 05 19.529From TAP OFF UNITto ISOLATOR -24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 70 - - -
26 05 19.533From TAP OFF UNITto MDB-14C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 15 - - -
26 05 19.536From TAP OFF UNITto MDB-24C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 15 - - -
26 05 19.539From TAP OFF UNITto DB-OFF4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.543From TAP OFF UNITto DB-TB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 15 - - -
26 05 19.546From TAP OFF UNITto UDB-WASH4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.549From TAP OFF UNITto UDB-CA-TA4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
36/147
arcop Page 14 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.553From TAP OFF UNITto UDB-SD4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.556From TAP OFF UNITto UDB-ME-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.559From TAP OFF UNITto UDB-ME-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.563From MDB-1 to UDB-14C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 10 - - -
26 05 19.566From MDB-2 to UDB-14C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC
Rm. - - - 10 - - -
26 05 19.569From TAP OFF UNITto UDB-OFF4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.573From TAP OFF UNITto DB- TB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.576From TAP OFF UNITto DB-4-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.579From TAP OFF UNITto DB-4-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.583From TAP OFF UNITto DB- ISO (2 Nos)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 20 - - -
26 05 19.586From TAP OFF UNITto UDB-4-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.589From TAP OFF UNITto UDB-4-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.593From TAP OFF UNITto UDB- SICU (23 Nos)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 115 - - -
26 05 19.596From TAP OFF UNITto DB-5-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.599From TAP OFF UNITto DB-5-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.603From TAP OFF UNITto DB-ISO (10 Nos.)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 100 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
37/147
arcop Page 15 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.606From TAP OFF UNITto DB-SB (115 Nos.)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 1,725 - - -
26 05 19.609From TAP OFF UNITto DB- 6-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.613From TAP OFF UNITto DB- 6-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.616From TAP OFF UNITto DB-7-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.619From TAP OFF UNITto DB-7-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.623From TAP OFF UNITto DB-8-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.626From TAP OFF UNITto DB-8-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.629From TAP OFF UNITto DB-9-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.633From TAP OFF UNITto DB 9-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.636From TAP OFF UNITto DB-RB-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.639From TAP OFF UNITto DB-RB-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.643From TAP OFF UNITto ISOLATOR fo r Lifts (10 Nos.)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 250 - - -
26 05 19.646From TAP OFF UNITto UDB-5-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.649From TAP OFF UNITto UDB-5-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.653From TAP OFF UNITto UDB-6-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.656From TAP OFF UNITto UDB-6-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
38/147
arcop Page 16 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.659From TAP OFF UNITto UDB-7-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.663From TAP OFF UNITto UDB-7-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.666From TAP OFF UNITto UDB-8-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.669From TAP OFF UNITto UDB-8-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.673From TAP OFF UNITto UDB-9-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.676From TAP OFF UNITto UDB-9-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC
Rm. - - - 10 - - -
26 05 19.679From TAP OFF UNITto DB-MCC-LGA-14C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
26 05 19.683From TAP OFF UNITto DB-MC C-LGB-14C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
26 05 19.686From TAP OFF UNITto DB-MC C-LGB-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.689From TAP OFF UNITto DB-MC C-LGB-34C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
26 05 19.693From TAP OFF UNITto DB-MCC-GA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
26 05 19.696From TAP OFF UNITto DB-MC C-G B-14C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
26 05 19.699From TAP OFF UNITto DB-MC C-G B-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 30 - - -
26 05 19.703From TAP OFF UNITto DB-MC C-FA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
26 05 19.706From TAP OFF UNITto DB-MC C-FA-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
26 05 19.709From TAP O FF UNITto DB-MCC-FB-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 40 - - -
-
8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316
39/147
arcop Page 17 of 67
Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities
Lahore. (ADDENDUM # 1) Division 26 : Electrical
QUANTITY RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.QUANTITY
RATE
Rs.
AMOUNT
Rs.
ITEM DESCRIPTION UNIT
PARKING BUILDING
(P2, P1 & Ground to First Floor)
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
26 05 19.713From TAP O FF UNITto DB-MCC-FB-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.716From TAP O FF UNITto DB-MCC-FB-34C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 45 - - -
26 05 19.719From TAP OFF UNITto DB-MC C-SB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 30 - - -
26 05 19.723From TAP O FF UNITto DB-MCC-TA-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.726From TAP O FF UNITto DB-MCC-TA-24C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.729From TAP OFF UNITto DB-MC C-TB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.733From TAP OFF UNITto DB-MC C-TB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.736From TAP OFF UNITto DB-MC C-4-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC
Rm. - - - 35 - - -
26 05 19.739From TAP OFF UNITto DB-MC C-4-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/