Booster Beam Notching Installation UpdatePIP Talk
Salah ChaurizeFebruary 20, 2013
![Page 2: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/2.jpg)
Notching Pre-Shutdown– A 3 bucket gap is created using two kickers located at Long 5
and Long 12• Notcher – A High Voltage(55kV) Kicker at Long 5• Noker - Lower Voltage Kicker (20-40 kV) at Long 12– Used to clean out remnant Notched Beam in bucketsAt 700 MeV
– Beam is kicked vertically into collimator region at Long 6 and Long 13 with upstream gradient magnets seeing some deposited notched beam loss.
– The notch timing and synchronization is accomplished by modules in the Booster LLRF Room and local timing modules.
– Beam notch for non-cogged cycles occurs at 400 Mev– Cogged notch occurs close to 700 MeV
![Page 3: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/3.jpg)
Notching Post Shutdown– A 3 bucket gap is created using three 1M Long kickers located
at Long 12• 3 Notchers – High Voltage(46kV) Kicker at Long 12• Notcher converted to NOKA• Noker converted to NOKB• Build/Commission new NOKC.
– Beam is kicked Horizontally into new absorber at Long 13 – The notch timing and synchronization is accomplished by
modules in Booster LLRF Room. (Same as before)– Extra Wide Aperture BPM and Short Corrector Spool needed.– Beam notch for non-cogged cycles occurs at 400 Mev. (Same
as before)– Cogged notch occurs close to 700 MeV. (Same as before)
![Page 4: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/4.jpg)
The Notch3 Bucket Notch Width
non-cogged Cycle Notch @ 400MeV Cogged Cycle
Notch @ ~700MeV
Extraction Loss
![Page 5: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/5.jpg)
L5 Notcher Current LocationNotcher magnet will be moved to L12
Vertical Pinger magnet will be removed from L12 and put here in its place
Notcher Hor. Pinger
![Page 6: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/6.jpg)
L5 NotcherPower supply components such as these
Will need to be moved to support Long 12 region
CX1168 tube Low Level equipment
CX1168 tube cabinet
![Page 7: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/7.jpg)
L12 Pre-shutdown
De-commissioned Horz. Pinger
Ver. PingerNokerMKS04
Beam direction
![Page 8: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/8.jpg)
L12 Post Shutdown
NOKC MKS04NOKBNOKA
![Page 9: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/9.jpg)
Kicker magnets rotated to kick Horizontally
![Page 10: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/10.jpg)
Kicker magnets rotated to kick Horizontally
Kicker MagnetBeam tubes exposed
for alignment
![Page 11: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/11.jpg)
L12 Noker & Extraction Kicker MKS04Power supply components such as these
will need to be installed/relocated to support notch2 & notch3in east Booster Gallery
CX1168 tube cabinet
Beam sync Modules
and other NIM crateSupport modules.
![Page 12: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/12.jpg)
Make Room For 2 more systemsIn East Gallery
![Page 13: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/13.jpg)
Current ConfigurationIn East Gallery
NOKA
NOKB
NOKC goes Here
![Page 14: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/14.jpg)
Current ConfigurationIn East Gallery
Noker PS Charging Resistors and load resistors
![Page 15: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/15.jpg)
Current Configuration In East Gallery
NIM Gate Modules Altera Based
CAMAC Controls and Ramp Cards
LeCroy Delay modules & CAMAC Trigger
![Page 16: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/16.jpg)
Current Configuration In East GalleryAbsorber Motion Controls
![Page 17: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/17.jpg)
Current ConfigurationIn East Gallery
NOKA
NOKB
NOKC
MKS04
![Page 18: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/18.jpg)
Long 13
Beam direction
Before
After
Standing at downstream end of absorber
![Page 19: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/19.jpg)
Long 13 Notched beam absorber
Beam direction
Before
After
![Page 20: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/20.jpg)
Long 13 New absorber
![Page 21: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/21.jpg)
Looking upstream towards L13
30”30”
75” 10 ‘
Before After
![Page 22: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/22.jpg)
Reason to redesign S12 Spool piece
• Need to kick beam horizontally at L12 with beam Nokers to create a notch in the beam.
• Current aperture restriction at S12 is BPM plates and upstream and down stream bellows which are all 4.5in.
![Page 23: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/23.jpg)
Reason to redesign S12 Spool piece
• New Extra Wide aperture BPM will give us 5 in aperture with new spool.
• New spool would use some of original spool design without the standard BPM components inside and larger aperture bellows at magnet spool flanges
![Page 24: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/24.jpg)
![Page 25: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/25.jpg)
![Page 26: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/26.jpg)
Extra Wide Aperture BPM
![Page 27: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/27.jpg)
Extra Wide Aperture BPM
![Page 28: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/28.jpg)
S12 CorrectorOriginal Standard aperture 4.5 Inch
![Page 29: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/29.jpg)
S12 CorrectorNew 5” Aperture Spool
![Page 30: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/30.jpg)
Preliminary Results and Commissioning
– Using 2 Nokers to create gap in beam at 400MeV– S12 New BPM giving data but needs some gain tweaks– Absorber motion controls working well.– Notched beam loss is currently low due to low intensity
running but is as expected.
![Page 31: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/31.jpg)
Preliminary Results and Commissioning
![Page 32: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/32.jpg)
Preliminary Results and Commissioning
![Page 33: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/33.jpg)
Preliminary Results and Commissioning
NOKA(CH1) & NOKB(CH2) Notched Bunches
![Page 34: Booster Beam Notching Installation Update PIP Talk](https://reader030.vdocuments.us/reader030/viewer/2022012903/568166ce550346895ddadcfb/html5/thumbnails/34.jpg)
Thanks to:-L13 Notched Beam Absorber Assembly-
PPD Experiment Fabrication- L13 Absorber Build and AssemblyD.Erickson, J. Judd, W. Blaszynski, W. GatfieldV. Sidorov - L13 Absorber Mechanical Design
APC Energy Deposition Simulations by- N.Mokhov, I. Tropin, S.Drozhdin M. Coburn L13 Absorber Motion Controls
-L12, S12, L13 Upgrade Support-Mechanical Support/ Instrumentation Groups – L13/S12 BPM and Corrector
R. Reily, B. Ogert, J. Kubinski, J. Briney ,D. Wallace, J. FitzgeraldControls Group CAMAC modules
Booster Techs - Power supply and load reconfiguration New timing module build and support electronics R. Mraz, T. Boes, D. Dick
Operations - Database work , O. Marshall, R. JonesAMG-L12, S12,L13 alignment
Radiation Safety – Joel FulghamConsultation – J. Lackey, B. Pellico
Machine Shop, Welding ShopMany More I missed