Transcript
Page 1: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Bond Construction Bond Construction UpdateUpdate

Citizen’s Oversight Citizen’s Oversight CommitteeCommittee

Bond Construction Bond Construction UpdateUpdate

Citizen’s Oversight Citizen’s Oversight CommitteeCommittee

Long Beach Community College District April 20, 2009

EDUCATE ENGAGE EMPOWER 1

Page 2: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Agenda Completed Construction Projects

LAC Central Plant LAC Learning Resource Center Building Q and R Roof Replacement Building P Faculty Restroom Upgrade

Current & Upcoming Construction Projects LAC South Quad Complex LAC Building A, Student Services Retrofit LAC Math Technology Building LAC Parking Structure LAC Building O Complex LAC Infrastructure Improvements – Phase 3 LAC Q & R ADA/HVAC UpgradesLAC Q & R ADA/HVAC Upgrades PCC Industrial Tech Phase 1 PCC MDAB (Multi-Disciplinary Academic Building) PCC Building CC Retrofit District Wide - Master Landscape Plan District Wide - Marquee Signage Plan District Wide - Energy RetrofitsDistrict Wide - Energy Retrofits Los Coyotes Property Upcoming Projects Planned Phasing of Future Projects

Q & A

2

Page 3: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Construction Complete Adds 10,000 ASF to existing

building Substantial Completion Anticipated

April 2009 Ribbon cutting scheduled April

24th, 2009

LAC/Learning Resource Center – Measure E 2002LAC/Learning Resource Center – Measure E 2002

3

Completed Construction Projects

Page 4: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Completed Construction Projects

Central Plant equipment, Public Safety, & Field House for Athletics

Final FF&E installation underway Plant ready for operation and

awaiting completion of LRC & SQC Construction Complete Anticipated startup 12/05/08

LAC Central Plant – Measure E 2002LAC Central Plant – Measure E 2002

4

Completed Construction Projects

Page 5: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Completed Construction Projects

5

Construction completed Replaced existing roof with

modified bitumen roof system. Existing skylights were removed

and installed new skylights. All broken tiles were replaced on all perimeter edging of both buildings.

Building Q and R Roof ReplacementBuilding Q and R Roof ReplacementMeasure E 2008Measure E 2008

Page 6: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Completed Construction Projects

6

Provides two new ADA compliant restrooms in lieu of the existing staff restrooms.

Installation of new wall and framing, redesign layout, finishes, fixtures and doors.

New fixtures and restroom accessories have been installed throughout. Finishes will match existing building décor.

Building P Faculty Restroom UpgradeBuilding P Faculty Restroom Upgrade Measure E 2008Measure E 2008

Page 7: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

Construction approx. 93% Complete

Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive office suites Multipurpose room State of the art Board Room

Substantial completion anticipated Summer 2009

South Quad Complex – Measure E 2002South Quad Complex – Measure E 2002

7

Page 8: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

Design Development phase completed Adds 4,000 ASF to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc. Estimated start of construction end of Spring 2010

LAC Building A – Student Services RetrofitLAC Building A – Student Services Retrofit

Measure E 2008Measure E 2008

8

Page 9: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

Completed Schematic Design Will house Math and Culinary Arts instructional

program as well as Reprographics Estimated start of construction 2012

LAC Math Technology Building – Measure E 2008LAC Math Technology Building – Measure E 2008

9

Page 10: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

LAC Parking Structure – Measure E 2008LAC Parking Structure – Measure E 2008

10

Planning initiated for approximately 900 Vehicles

To be procured under “Design Build Delivery” method

Final Design Criteria completed To be located Southeast corner

of Lot J adjacent to the Verizon building

Photovoltaic Electrical Generation Array on top level of structure

Anticipated start of construction 2010

Page 11: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

LAC Building O Complex – Measure E 2008LAC Building O Complex – Measure E 2008

11

Property acquired December 2008

Two structures totaling 87,000 square feet

Potential occupants to be ACIT, District Warehouse Facility, ERD, and Foundation Office

Warehouse temporarily located in building 2

Foundation Offices under Design Development

Page 12: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

LAC Infrastructure Improvement ProjectsLAC Infrastructure Improvement Projects

Measure E 2008Measure E 2008

12

Planning underway with engineers 75% of Design Phase completed Completes chilled water lines to

North side of campus Includes other major utility

upgrades; Reclaimed Water, Domestic Water, Data, etc.

Existing building HVAC systems to be upgraded in synch with infrastructure improvements

Coordinated with modernization, quick start projects, and Master Landscape Project

Page 13: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

13

Whole building ADA upgrade: includes restrooms, stairlift (Bldg. R)

All new infrastructure: new piping, etc. (Bldg. R) Minor renovations to offices (Bldg. R) Total renovations of locker/training room (Bldg. R) HVAC upgrade: includes new air handlers, ductwork, etc.

(Bldg. Q & R) Update fire alarm system (Bldg. Q & R) Construction will be done in phases so as to minimize

disruption of classes Final construction documents to be submitted to DSA May

2009 Estimated start of construction Spring 2010

LAC Q & R ADA/HVAC - Measure E 2008LAC Q & R ADA/HVAC - Measure E 2008

Page 14: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

Modern facility houses Welding Department and other trade programs

Construction is 60% complete Replaces existing antiquated

structures New Northern face of the

campus Completion anticipated late

summer 2009

PCC Industrial Technology Center Phase 1PCC Industrial Technology Center Phase 1

Measure E 2002Measure E 2002

14

Page 15: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

90% construction documents submitted Swing space planning completed 9/2008, construction of swing space starts

Summer 2009 Anticipated start of MDAB construction Fall 2009 To be completed in two phases

PCC MDAB PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2002(Multi-Disciplinary Academic Building) Measure E 2002

15

Page 16: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

PCC Building CC Retrofit - Measure E 2008PCC Building CC Retrofit - Measure E 2008

16

To be designed by Hill Partnership Architects Houses the Fitness Center, Gymnasium, Weight Room, and

Faculty and Staff Offices Swing space to be located on PCC Campus (Bldg. FF) To be completed concurrently with MDAB project Anticipated start of construction Spring 2010

Page 17: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

District Wide – Master Landscape PlanDistrict Wide – Master Landscape Plan Measure E 2008Measure E 2008

17

Planning completed December 2008 Plan to be implemented concurrently as each Bond construction

project finalizes Designed for long term sustainability of campus and neighborhood

Page 18: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

District Wide – Marquee Signage PlanDistrict Wide – Marquee Signage Plan Measure E 2008Measure E 2008

18

District Wide Signage Plan complete Currently in construction document phase Final site location determined Securing city permits at this time Planned completion late Fall 2009

Page 19: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

19

Phase 1 – Construction of Central Plants The chillers at the Central Plants were selected to achieve maximum

efficiencies both at part load and full load conditions. The plant not only reduces the peak electrical demand at the campus but also offers lower emissions thus reducing the impact on the environment. Received rebates from Southern California Edison

LAC Central Plant Designed to have (2) 600 ton centrifugal chillers and (1) 300 ton

chiller with space for a future 600 ton chiller. The Central Plant is designed to serve most of the existing buildings and all the new buildings at the campus.  

PCC Central Plant Designed to have (2) 300 ton centrifugal chillers and (1) 300 ton

multi-stack chiller. The Central Plant is designed to serve most of the existing buildings and approximately three new buildings at the campus.

District Wide Energy Retrofits - Measure E 2008District Wide Energy Retrofits - Measure E 2008

Page 20: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

20

Phase 2A (99% Complete)

Lighting upgrades HVAC upgrades Controls upgrades Pool upgrades Water systems upgrades Hot water system upgrades Re-roofing

Phase 2B (Design Phase)

HVAC upgrades (Air Handlers, Zone upgrades, tie to Central plant, etc.)

Controls upgrades Lighting Upgrades (Interior/Exterior/Lighting controls)

Hot water system upgrades Irrigation Controls Window film addition

District Wide Energy Retrofits - Measure E 2008District Wide Energy Retrofits - Measure E 2008

Page 21: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

21

Re-design current dirt lot to have 80 parking stalls with new lighting and drainage. (Awaiting City feedback)

Re-slurry and re-stripe existing asphalt parking lot. (Done)

Retrofit hand rails and courtyard entry fencing/gates. (Done) Replace elevator controls to bring them up to new current

standards. (In process) Installation of new automated front door. (In process) Building/Monument Signage & Interior Signage upgrade with

Tenant/Suite names. (In process) Refinish exterior aluminum mullions. (In process) Building exterior wood/stucco repairs and painting. (In process) 2nd floor deck repair/resurfacing. (Bids received) Building perimeter landscape upgrade. (In process) Replacement of gutters. (Done)

Los Coyotes Property - Measure E 2008Los Coyotes Property - Measure E 2008

Page 22: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Current and UpcomingConstruction Projects

22

LAC Carson Street Median Fence Replacement (Construction starts April 2009) Pool boiler upgrade (In process)

Replace current heating system with energy efficient boilers. Bldg. F - Conversions of rooms F104 and F106 to new classroom space.

(Awaiting structural calculations) Expansion of Building I (In Design Phase)

Bookstore to be relocated here Relocate Bond Management Team Offices to O Building Complex and

removal of W trailers (December 2009)

Increase parking at Faculty and Lew Davis St. PCC

MM (FPP) Exterior renovation (In Process)

Paint, windows, replacement of all exterior doors Restroom ADA upgrade (In Process)

Upcoming ProjectsUpcoming Projects

Page 23: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Planned Phasing of Future Projects

23

Currently Planned ScheduleCurrently Planned Schedule

2008-09 Parking Structure – Design/Build concept

Anticipate awarding bid Summer 2009 Moving Warehouse from PCC to Building O at LAC – (Done) LAC/PCC Building Needs Assessment Projects

Bathroom Improvement Projects Quick-Start Projects Lighting Projects Classroom Improvement Projects Infrastructure Projects

Submit FPP for M/N Project at LAC and MM Project at PCC and submit IPP for P Building at LAC and MM Project at PCC

Page 24: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Planned Phasing of Future Projects

24

2009-10 Install portables at PCC for Swing Space – Summer 2009 Master Landscaping and Signage plans complete

Marquee signage anticipated to be installed Fall 2009 Moving LAC Building A into Swing Space – Spring 2010 Begin construction of Building A at LAC

Anticipating start at end of Summer 2010 Begin construction of Buildings CC, DD, and EE at PCC

Anticipating Fall 2009 start

Begin Schematic Design for Buildings C and F at LAC

Submit plans to DSA no later than March 2010

Begin Master Landscaping and Signage Initiatives

Continue District Wide Energy Efficiency Improvements Phase IIA (99% complete)

Lighting Upgrades, HVAC Upgrades, Control upgrades, Pool Cover, Roof replacement, etc

Phase IIB (In Design Phase) Upcoming advancements include connecting current buildings to

Central Plant infrastructure

Currently Planned ScheduleCurrently Planned Schedule

Page 25: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Planned Phasing of Future Projects

25

2010-11 Anticipated Construction completion of Building A

at LAC – Fall 2011 Submit plans to DSA for Math/Technology Building

at LAC Move Buildings C and F programs into Swing

Space (M/N Building) and begin construction – late Fall 2011

Construction completion of Buildings CC, DD and EE at PCC

Begin construction of Buildings AA and BB at PCC Anticipating Spring 2011 start

Currently Planned ScheduleCurrently Planned Schedule

Page 26: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

Planned Phasing of Future Projects

26

2011-12 Begin construction of Math/Technology Building at LAC Submit plans to DSA for M/N Building at LAC

2012-13 Anticipated Construction completion of Buildings C and

F at LAC – December 2012

Anticipated Construction completion of Math/Technology Building at LAC – December 2012

Begin construction of Buildings M/N at LAC – January 2013

Anticipated Construction completion of Buildings AA and BB at PCC – June 2013

Currently Planned ScheduleCurrently Planned Schedule

Page 27: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1

QUESTIONS&