Bureau of Land Management
Installed 10 grid-tied sites from New Mexico to Oregon
100kW site, Anasazi Heritage Center, Dolores, Colorado
![Page 2: BLM project for Johnson Controls](https://reader036.vdocuments.us/reader036/viewer/2022062514/558cf49ad8b42a8f0f8b4690/html5/thumbnails/2.jpg)
Bureau of Land Management
40kW, single inverter, Dolores, Colorado
112 vertical stanchions, 150 modules
![Page 3: BLM project for Johnson Controls](https://reader036.vdocuments.us/reader036/viewer/2022062514/558cf49ad8b42a8f0f8b4690/html5/thumbnails/3.jpg)
Bureau of Land Management
25kW, single inverter, Cody, Wyoming
All sites have video and internet monitoring systems
![Page 4: BLM project for Johnson Controls](https://reader036.vdocuments.us/reader036/viewer/2022062514/558cf49ad8b42a8f0f8b4690/html5/thumbnails/4.jpg)
Bureau of Land Management
25kW, redundant inverters, Rock Springs, Wyoming
All wiring by in-house electricians
![Page 5: BLM project for Johnson Controls](https://reader036.vdocuments.us/reader036/viewer/2022062514/558cf49ad8b42a8f0f8b4690/html5/thumbnails/5.jpg)
Bureau of Land Management
25kW, single inverter, Rock Springs, Wyoming
Provided project scheduling, net metering coordination
![Page 6: BLM project for Johnson Controls](https://reader036.vdocuments.us/reader036/viewer/2022062514/558cf49ad8b42a8f0f8b4690/html5/thumbnails/6.jpg)
Bureau of Land Management
40kW, single inverter, Montrose, Colorado
![Page 7: BLM project for Johnson Controls](https://reader036.vdocuments.us/reader036/viewer/2022062514/558cf49ad8b42a8f0f8b4690/html5/thumbnails/7.jpg)
Bureau of Land Management
25kW, single inverter, Grants, New Mexico
Ready for fencing
![Page 8: BLM project for Johnson Controls](https://reader036.vdocuments.us/reader036/viewer/2022062514/558cf49ad8b42a8f0f8b4690/html5/thumbnails/8.jpg)
Bureau of Land Management
100kW, single inverter, Salem, Oregon
Applying cellular site construction and networking to photovoltaics