BIM - The Challenges and Opportunities for Rail
Simon Wray, Infrastructure Lead, The BIMstitute, UK
![Page 2: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/2.jpg)
![Page 3: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/3.jpg)
PAS 1192-2: 2013 - How (Capex)
PAS 1192-3: 2014 - How (Opex)
PAS 1192-4:2014 – Data Exchange
CIC BIM Protocol - Legal
Soft Landings - Handover
Digital Plan of Works - When
Classification - Naming
PAS 1192-5:2015 – Data Security
8 pillars of BIM
![Page 4: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/4.jpg)
Today’s WorldFundamentally BIM is centred around three core elements:
• Graphical Representation - An accurate digital 3-
Dimensional representation of an asset
• Information (data and documents) - to support design,
fabrication, construction, operations and maintenance
• Standardisation - Processes, standards and behaviours to
work consistently and collaboratively
![Page 5: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/5.jpg)
![Page 6: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/6.jpg)
Today’s World
![Page 7: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/7.jpg)
![Page 8: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/8.jpg)
4D
![Page 9: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/9.jpg)
4D
![Page 10: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/10.jpg)
PAS 1192-2: 2013 - How (Capex)
PAS 1192-3: 2014 - How (Opex)
PAS 1192-4:2014 – Data Exchange
CIC BIM Protocol - Legal
Soft Landings - Handover
Digital Plan of Works - When
Classification - Naming
PAS 1192-5:2015 – Data Security
8 pillars of BIM
Key Challenges
• B in BIM stands for Building
• Classifications are all written for buildings
– not infrastructure
• Lack of informed and impartial support
• Fragmented asset information
requirements
• Lot’s of “noise” – hundreds of vendors,
who to choose,?
• Rail Design tools not BIM compliant….
![Page 11: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/11.jpg)
Scheme Plans OLE Layouts
![Page 12: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/12.jpg)
![Page 13: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/13.jpg)
Track
S&T
CivilsOLE
M&E
![Page 14: BIM - The Challenges and Opportunities for Rail](https://reader031.vdocuments.us/reader031/viewer/2022020620/61e595cba8561d743d620796/html5/thumbnails/14.jpg)
Efficient build
Safer worksitesReduced whole life cost
Engineering
Project Management
CommercialStakeholders
Construction