BFB furnace bottom modification in Idbäcken CHP
Demo in NextGenBioWaste WP1.2Christer Forsberg
Vattenfall Heat Nordic
![Page 2: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/2.jpg)
© Vattenfall AB 2
Idbäcken CHP in Nyköping
1994, Bubbling Fluidised Bed: 70 MWheat 35 MWel
Steam data: 140 bar/540°CNGBW targets:
Double the lifetime of heat exchanger components at existing steam temperatures
Increase the electrical efficiency for biomass combustion plants from 33 to 35%, while making the systems more cost-effective by the use of more low-grade fuels
Lower the fuel cost at least 1 mill. €/year for a 100 MWth biomass combustion plant while mainting the two former subtargets (2 and 3)
![Page 3: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/3.jpg)
© Vattenfall AB 3
Demolition waste wood
![Page 4: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/4.jpg)
© Vattenfall AB 4
Forest residues
![Page 5: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/5.jpg)
© Vattenfall AB 5
Fuel mixture
0
100000
200000
300000
400000
500000
600000
2000
2001
2002
2003
2004
2005
2006
2007
2008
Waste wood MWhVirgin wood MWhOil MWhCoal MWhPower sold MWhHeat sold MWh
![Page 6: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/6.jpg)
© Vattenfall AB 6
Need for new bed bottom
• 50% waste wood => stop every month for bed cleaning
• Target: 100% waste wood!
![Page 7: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/7.jpg)
© Vattenfall AB 7
Tested nozzlesAnkfotsdysa Hög dysaOriginaldysa
Trappstegsinsats
![Page 8: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/8.jpg)
© Vattenfall AB 8
Pilot scale test – nail transport
![Page 9: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/9.jpg)
© Vattenfall AB 9
Original nozzles
![Page 10: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/10.jpg)
© Vattenfall AB 10
Step grid
![Page 11: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/11.jpg)
© Vattenfall AB 11
New bed bottom design
![Page 12: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/12.jpg)
© Vattenfall AB 12
Installation summer 2007
![Page 13: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/13.jpg)
© Vattenfall AB 13
The problem to drain sand from all shutes…
![Page 14: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/14.jpg)
© Vattenfall AB 14
4:1 scale sand drain tests
Original design- empty hopper ‘Kinesiska hatten’ ver. 4 in hopper
Unfortunately, the sand don´t behave the same in the full scale hopper…
![Page 15: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/15.jpg)
© Vattenfall AB 15
Steam production BFB 2007-08IDBACKEN.P3.CQI4039
(Eff ånga e ÖH)
0
10
20
30
40
50
60
70
80
90
100
09-04-0700:00:00
09-24-0700:00:00
10-14-0700:00:00
11-03-0700:00:00
11-23-0700:00:00
12-13-0700:00:00
01-02-0800:00:00
01-22-0800:00:00
02-11-0800:00:00
03-02-0800:00:00
S S SN NN
N= nozzle cleaningS= sintering
![Page 16: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/16.jpg)
© Vattenfall AB 16
Main bed bottom problems 2007-08
Primary reasons for unavailability:• (Partial) defluidisation of bed (3 stops)• Pluggning of nozzles (3 stops)
Other problems/malfunctions:• Bed sand drained only from 25% of the bottom ash chutes • Extensive wear and high temperature in bottom ash chain conveyor
![Page 17: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/17.jpg)
© Vattenfall AB 17
Status March 2008
• Bed bottom not yet taken over by Vattenfall.• Development and adjustments still made by the supplier.• Neither test run period nor performance test has been
possible to initiate.• The boiler availability still lower than expected (~92%)• Capacity still limited to 80 MWth
![Page 18: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/18.jpg)
© Vattenfall AB 18
Modifications summer 2008
• New bottom ash hopper design installed in all 8 hoppers• All nozzles replaced by new design with 9 mm holes• All furnaces walls replaced (due to corrosion)• Two water washing robots installed in furnace
![Page 19: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/19.jpg)
© Vattenfall AB 19
0
10
20
30
40
50
60
70
80
90
100
09-01-08 00:00:00 10-21-08 00:00:00 12-10-08 00:00:00 01-29-09 00:00:00 03-20-09 00:00:00 05-09-09 00:00:00 06-28-09 00:00:00
BFB steam production Sept 08 – June 09Planned shut-down Bed sintering
![Page 20: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/20.jpg)
© Vattenfall AB 20
3
4
5
6
7
8
09-01-0800:00:00
10-21-0800:00:00
12-10-0800:00:00
01-29-0900:00:00
03-20-0900:00:00
05-09-0900:00:00
06-28-0900:00:00
BFB operation 2008-09 – nozzle pressure drop
Nozzle cleaning
![Page 21: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/21.jpg)
© Vattenfall AB 21
Inspection at summer overhaul 2009About 2x2 m totally plugged area outside all fuel feeding chutes
![Page 22: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/22.jpg)
© Vattenfall AB 22
Inspection at summer overhaul 2009About 2x2 m totally plugged area outside all fuel feeding chutesEdge of plugged area – nozzles outlet still above layer
![Page 23: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/23.jpg)
© Vattenfall AB 23
Inspection at summer overhaulAbout 2x2 m totally plugged area outside all fuel feeding chutesEdge of plugged area – nozzles outlet still above layerPartially plugged nozzle holes
![Page 24: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/24.jpg)
© Vattenfall AB 24
Summary operation season 2008-09
• Modifications performed summer 2008 made significant improvements to the bed bottom operation.
• Only one unscheduled shut-down (16-20 Jan).• Two nozzle cleanings needed. • Nozzle pressure drop increase ~ 1 kPa/month (compare to ~6
kPa/month 2007-08)• Performance tests and test run approved, delivery taken over by
Vattenfall.• Operation at 90 MWth proven possible.• Washing robots in furnace important additional measure.• Corrosion on furnace walls worse than expected, next
challenge..
![Page 25: BFB furnace bottom modification in Idbäcken CHP · 0 100000 200000 300000 400000 500000 600000. 2 00 0 2 0 01 200 2 2 0 03 200 4 2 0 05 2006 2 0 07 2008. Waste wood MWh Virgin wood](https://reader031.vdocuments.us/reader031/viewer/2022011912/5f9e0a6e88abe4082e29fbb3/html5/thumbnails/25.jpg)
© Vattenfall AB
Thank you!