8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
1/20
Anacostia Waterfront Initiative
Martin Luther King, Jr. Memorial Library
Sunday, August 24, 2014
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
2/20
2
Anacostia Waterfront
FINAL REPORT JUNE 2005
30-Year, $10 Billion Series Projects
Created by March 2000 Memorandum ofUnderstanding Between the District and
19 Other Federal and Regional Agencies
5 Key Themes:
o
Restore:A clean and active river.o Connect:Eliminating barriers and
gaining access.
o Play:A great riverfront park system.
o
Celebrate:Cultural destinations ofdistinct character.
o Live:Building strong waterfront
neighborhoods.
Creating a World-Class Waterfront
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
3/20
3
AWI Transportation Master Plan
2014 Update
Continuous Pedestrian and Bicycle Access AlongWaterfront
Modal Shift to Public Transit
Great Urban Boulevards with Mixed Uses,
Landscaping and Great Civic Spaces
Redesign Bridges in the Tradition of Great Civic
Architecture
Reduce Highway and Freeway Barriers Between
Neighborhoods and Waterfront Parks
Reconnect the City Street Grid to Waterfront
Parks
Support and Foster Economic Development
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
4/20
4
AWI Program Transportation Projects
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
5/20
5
Anacostia Riverwalk Trail
Backbone of Anacostia
Waterfront
15 of 28 Planned Miles of
Trail Open
From Tidal Basin with
Northeast and Southeast
Borders with Maryland
Seamless Pedestrian and
Bicycle Travel Between
Popular Destinations and
16 Neighborhoods $33 Million of Anticipated
$50 Million Invested to
Date
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
6/20
6
Anacostia Riverwalk Trail
Kenilworth Aquatic Gardens Segment
Better Connect 16Communities, the River
and Recreational Sites
Increase Transit Station
Accessibility
Make Bicycle Commuting
More Attractive
Provide Link Between
Benning Road andBladensburg Waterfront
Park in Larger 70-mile
Regional Trail Network
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
7/207
11th Street Bridge Project
Increase Mobility Via Separate
Freeway and Local TrafficConnections
Provide a Shared-Use Path forPedestrians and Bicyclists
Replace Functionally Deficient,
Structurally Obsolete Bridges
Provide Additional Alternate
Evacuation Route
Include New Trail Connections,
Improved Drainage and OtherEnvironmental Investments
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
8/208
Frederick Douglass Memorial Bridge 63-years-old, End of Useful
Life
Replacement Due to:
oAge and Condition,
o Functional Limitations, and
o
Importance to theDistricts Transportation
Network and Plans
Deterioration Requires
Repairs with Increasing
Frequency, Cost and Traffic
Impacts
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
9/209
South Capitol Street Corridor Project
Creating a GrandUrban Boulevard
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
10/2010
Traffic Oval West of Bridge
West
Oval
Potomac
Avenue, SE
New Frederick
Douglass Memorial
Bridge
Half Street,
SW
Q Street, SW
R Street, SW Potomac
Avenue, SW
South Capitol
Street
Nationals
Ballpark
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
11/2011
New Frederick Douglass
Memorial Bridge
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
12/2012
East Oval and I-295 Interchange
East Oval
Suitland
Parkway
South Capitol
Street
New Frederick
Douglass MemorialBridge
Anacostia
Drive
I-295
Howard
Road
Joint Base
Anacostia Bolling
DC Water
Pump House
Poplar
Point
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
13/2013
South Capitol Street Trail Provide Bicycle/Pedestrian
Access on South Capitol
Street/Overlook AvenueCorridor
Increase Multi-modal
Connectivity for
Communities, Military Basesand Recreational Destinations
Provide Link south fromDistricts Anacostia
Riverwalk Trail toMarylands Oxon Run Trail and
Woodrow Wilson Bridge
Connection with Virginia
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
14/2014
Parkside Pedestrian Bridge
Better Connect
Neighborhoods on Each
Side of DC 295
Provide new access to
Minnesota Avenue Metro
Station.
Make bridge safe, well-lit
and disabilities-accessible
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
15/2015
M Street SE/SW Transportation Study
Completed in 2013
Special Events Study completed in
2014
EA now underway by DDOT
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
16/2016
Malcolm X/Interstate 295 Interchange
New Access to Southbound
I-295 from St. Elizabeths
Campus
Design to Start in 2013
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
17/20
17
Barney Circle Southeast Boulevard
Transportation Study
Transform Southeast Freewayinto a Boulevard Integrated with
Neighborhoods Between 11th
Street Bridge and Barney Circle
Reconstruct Barney Circle to
Accommodate Vehicle TurningMovements and Multi-modal
Access
Improve Pedestrian and Bicyclist
Connections to Anacostia River
Evaluate Design Options that
Consider Multi-modal
Transportation Uses
John Philip
Sousa Bridge
Pennsylvania Avenue
L Street SE
Southeast Boulevard
17
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
18/20
18
Pennsylvania-Potomac Avenue SE
Pedestrian Safety Study
Enhance Safety and Multi-modal Connections
Direct Pedestrian Paths
across Pennsylvania
Avenue SE
Reduce Pedestrian
Crossings to Potomac
Avenue Metro Station
Improve Intersection
Connection to AnacostiaWaterfront areas
Improve Public Space
Aesthetics
Pennsylvania
Avenue SE
PotomacAvenue SE
14th Street SE
Potomac Avenue
Metro Station
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
19/20
19
More Information
For more information, visit
www.anacostiawaterfront.org
To receive project updates,
ask questions or comment:
o
Sign up for the projectemail list
o Email: [email protected]
o
Call: 202-741-8528
-
8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014
20/20
20
QUESTIONS