Download - Automatic Heliostat Cleaning Robot
![Page 1: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/1.jpg)
Modular and Scalable Concentrating Solar Thermal Power (CSP)
Clyde Mallinson
![Page 2: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/2.jpg)
eSolar Corporate Overview
Founded in 2007, 135 employees currently
$170 Million in capital raised to date
Offices in Pasadena and Palmdale, California
3.5 GW of announced commercial partnerships and nearly 10 GW project pipeline around the world
5 MW Sierra SunTower commercial facility is producing clean, renewable energy to the grid – the only operating solar power tower plant in the United States
2
![Page 3: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/3.jpg)
3
![Page 4: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/4.jpg)
Main Concentrating Solar Power Technologies
Linear Fresnel Reflectors
Tubes fixed in place
Use synthetic oil or direct
steam
Low concentration
Low maximum temp.
No large scale
demonstration to date
Source: eSolar analysis; Concentrating Solar Power Reports
Note: Tower photograph of current eSolar commercial demonstration plant
Trough
Most mature technology (over 350 MW installed)
Single-axis tracking
Synthetic oil
Costly heat exchangers
Low concentration
Low maximum temp.
Tower
Dual-axis tracking
High concentration
High maximum temp.
Demonstrated in Solar
One, PS-10, and PS-20
Current commercial
facilities globally: Abengoa
and eSolar
4
![Page 5: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/5.jpg)
Solar Thermal Power Tower technology has the potential to achieve the lowest cost solar solution
5
![Page 6: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/6.jpg)
The eSolar Approach: Innovative Modular and Scalable CSP
North field of tracking mirrors
South field of tracking mirrors
Receiver Tower
Receiver (directsteam generation)
2010 World Economic Forum Technology Pioneer Award
2009 Power Gen Renewable Energy Project of the Year Award
6
![Page 7: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/7.jpg)
Trough mirror assembly on site with large steel support structures
Other power tower heliostats requires a 3’ diameter steel post set 20 feet into the ground
The actuator is large and heavily engineered
Curved trough mirrors and large heliostats need heavy support structures and manual labor for expensive on-site installation
7
![Page 8: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/8.jpg)
Using less steel with individual small motor and chipset to control each mirror automatically
Small and flat mirrors –the size of a 46” (1.2m) TV – sit less than 2.5ft (75cm) above ground
eSolar’s actuator is the size of a shoe box
The small pre-fabricated eSolar heliostats are low to the ground, and secured to cement pedestals with no ground penetration
8
![Page 9: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/9.jpg)
eSolar’s core innovations: small mirrors with a proprietary calibration and tracking system that enable rapid deployment
Pre-fabricated mirrors and frames arrive in standard shipping containers on site
Simple, linear design and field layout reduce high ground preparation costs
Mirror field is installed with basic hand tools and operated via fully automated system
Standard 150ft (50m) wind towers are repurposed to host receivers, expediting permitting process
9
![Page 10: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/10.jpg)
Cost Reduction and Local Manufacturing Opportunities
Small, flat heliostats require less steel, and can be manufactured locally
Low profile installation reduces construction equipment and labor cost
Pre-fabricated components requiring less skilled labor for assembly on site
Small, flat mirrors ~ 1 sq. meters ensurelower material and labor costs
Mirror field is installed using hand tools
Lowest capital cost of any CSP plant
Low O&M costs
10
![Page 11: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/11.jpg)
Close-up view of the mirror field
11
![Page 12: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/12.jpg)
eSolar Automatic Heliostat Cleaning Robot
12
![Page 13: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/13.jpg)
The eSolar Calibration and Tracking System
• System of cameras
• Completely automated
• Highly parallelized
• Full calibration in <20 days
• The only fully automated calibration and tracking system
13
![Page 14: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/14.jpg)
Heliostats Before and After Calibration
14
![Page 15: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/15.jpg)
The Result: Pointing Accuracy
![Page 16: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/16.jpg)
Performance
• Flux distribution measured with scanner, agrees with simulation
• Beam characterization system used to assess pointing error: 1.4 mrad
• Steam temperature, pressure, and flow rate perform to expectations
16
![Page 17: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/17.jpg)
Reliability
• > 50 million heliostat operating hours
• Availability > 99.9%
17
![Page 18: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/18.jpg)
eSolar is operating a 5 MW commercial facility in California; executing on a 3.5 GW of contracted projects; and developing 9 GW of proposals globally
Full-scale 5 MW solar thermal power plant with 2 towers
operating at the same steam conditions as a 46 MW plant
18
Small mirrors, pre-fabricated equipment, 16 towers in 46 MW
Modular, rectangular fields, standard 46 MW and scalable to any size
Fully automated calibration and tracking system
![Page 19: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/19.jpg)
eSolar partners with leading companies around the world to enable complete project capabilities
19
![Page 20: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/20.jpg)
eSolar is seeking partners to build solar thermal power plants worldwide • EPC partners
• IPPs or project developers
• Government partners
Customer licenses the eSolar technology, and receives:• Fluor preliminary 46MW power plant design
• Site specific solar field design support
• Heliostat field equipment (via eSolar & contract manufacturers)
• Software license and technical know-how
• Field installation quality control supervision
• Heliostat field commissioning services
• Software deployment and power plant commissioning services
Working with eSolar to deploy Solar Thermal Projects
20
![Page 21: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/21.jpg)
eSolar Pipeline of Projects Worldwide
2 GW solar integrated with biomass signed in China• Construction of first 92 MW to start in 2010
1 GW signed in India• Construction of first plant began in 2009
• Breaking ground of additional 46 MW in 2010
500 MW signed in the US• Construction of first 92 MW in 2010
Projects in discussion across Europe, MENA, and APAC
21
![Page 22: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/22.jpg)
eSolar’s unique value proposition provides a competitive advantage to developers
Unique modular and scalable design
Can be economical at < 50 MW
Easy to deploy with < 18 months of construction
Can be sited closer to load centers, reducing impact on grid
Requires small land sites of 200 acres for 46 MW
Commercially proven technology with operating power plant
Boosts regional economies by scaling up solar generation through local manufacturing and labour resources
22
![Page 23: Automatic Heliostat Cleaning Robot](https://reader034.vdocuments.us/reader034/viewer/2022052313/58a2f6b51a28ab5c588c5d43/html5/thumbnails/23.jpg)
Thank you 23