PROJECTED Cost and Plan for Athletics
Renovations to Lee Barnes’ Stadium, Lower LHHS Field, and Thunderbolt
![Page 2: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/2.jpg)
Lee Barnes’ Stadium Needs•Lighting upgrade and relocation•All weather track•Field turf•Seating•Concession and restrooms
![Page 3: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/3.jpg)
Lower Field Needs• Completion of multi-use field
▫Additional baseball, softball, track, discus, and football/soccer practice field
• Lighting for additional field• Concession, training room and restrooms• Field turf for main baseball and softball
field• Softball backstop and perimeter fencing • Paved parking lot• Dug out renovations
![Page 4: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/4.jpg)
Lower Field Example
![Page 5: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/5.jpg)
Why Field Turf•Time of use•Reduction of water usage•Cost effective with maintenance•Safety
![Page 6: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/6.jpg)
FIELD DURABILITY:
•GRASS•60 hrs x 26 weeks x 10 yrs= 15,600 hrs
•FIELD TURF•100 hrs x 48 weeks x 10 yrs= 48,000 hrs
![Page 7: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/7.jpg)
Natural Grass Field TurfBase: $280,000 $280,000Materials: $220,000 (cost of sod) $400,000Maintenance: $52,500 X 10 yrs.(annual cost for herbicides, $5,000 x 10 yrs.pesticides, re-sodding, water, mowing)Total: $1,025,000 $730,000
COST COMPARISON FOR ONE FIELD
![Page 8: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/8.jpg)
Annual Maintenance Cost• GRASS FIELD TURF• Mowing Equipment 7,068 • Labor ($20 per hr) 6,000 1,000• Clipping Removal 2,861 • Fertilization 4,856 • Over seeding 466 • Coring 2,848 • Topdressing 9,565 • Thatch Removal 185 • Monitor Irrigation 846 • Equip. Depreciation & Fuel 3,500 1,500• Water Cost 5,400 • Re-Striping Field Lines GRASS FIELD TURF• Labor 5,800 1,000• Material 3,105 1,500• TOTAL ANNUAL COST: 52,500 5,000
•
![Page 9: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/9.jpg)
COST OF OPTIONSGRASS FIELD TURF• PROJECT ESTIMATE
$1,912,596• (just the multi field
developed)• Annual Maintenance Cost
52,500• Actual water cost with out over
seeding $50,600 • Projected water cost with over
seeding $75,000• 10 year cost: • With out over seeding
$2,938,596• Over seeding $3,182,596
• PROJECT ESTIMATE $2,440,448
• Annual Maintenance Cost 5,000
• Projected water cost minimal • 10 year cost : $2,490,448
![Page 10: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/10.jpg)
• An independent, three-year study of competitive college football showed that when compared to natural grass the FieldTurf system leads to:
• 20% Fewer Muscle Strains / Tears• 12% Fewer Concussions20% Fewer Ligament Tears• 24% less High Ankle Sprains• 20% Fewer Severe Injuries• 23% Fewer Injuries on 4-8+ Year Old Surface
• An independent, five-year safety study of competitive high school football showed that when compared to natural grass the FieldTurf system leads to:
• 44% Fewer Concussion Injuries Combined• 43 % Fewer ACL Injuries Combined • 25% Less Time Lost to Long-Term Injuries (Lasting 22+ Days)• 16% Less Time Lost to Short-Term Injuries (Lasting 1-2 Days)
• A Woman's Collegiate Soccer Study concluded less severe and total injuries occurred on FieldTurf compared to Natural Grass.
• In regards to incidence of injury:• 22% Fewer Total Injuries• 7% Fewer Substantial Injuries• 2% Fewer Severe Injuries• In regards to head and knee trauma:• 12% Fewer Concussions• 18% Lower ACL and Associated Tissue Trauma Combined
![Page 11: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/11.jpg)
Lighting •Budget estimate from Qualite Sports
Lighting for all lighting needed: ▫Lee Barnes’ Stadium $85,00O▫Lower Field $90,000
•Break down of items on bid sheet from Qualite:
•TOTAL $175,000
![Page 12: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/12.jpg)
Track Surface and Installation •Budget estimate from Renner Sports
Surface▫8 Lane estimate $300,000
•TOTAL $300,000
![Page 13: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/13.jpg)
Turf for Lee Barnes’ Stadium•Budget estimate from Field Turf:
▫Site Engineering and Design $230,400▫Turf and Install $380,000
•TOTAL $610,400
![Page 14: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/14.jpg)
Seating for Lee Barnes’ Stadium•Home and Visitor Renovation
▫1500 capacity for each; 3,000 seat capacity ▫10 HC Seating ▫Current codes including railings per side
•Budget estimate from Tomahawk ▫Seating $356,000▫Press box $30,000▫Shipping and install $50,000
•TOTAL $436,800
![Page 15: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/15.jpg)
Concession, Restrooms and Storage for Lee Barnes’ Stadium •Budget Estimate $100,000
![Page 16: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/16.jpg)
Lower Field• Main Baseball Field
• Site Engineering and Design $336,000• Turf $399,000
• Main Softball Field• Site Engineering and Design $116,000
• Turf $137,000
• Multi-Use• Site Engineering and Design $230,000
• Turf $380,000
• TOTAL $1,599,150
![Page 17: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/17.jpg)
Lower Field Bleachers•Main Baseball $24,050•Main Softball $24,050•SEC Baseball $9,099•SEC Softball $9,099• Install $15,000
TOTAL $81,298
![Page 18: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/18.jpg)
Bleacher Example
![Page 19: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/19.jpg)
Fencing / Paving / Misc•Lower field perimeter •Softball and SEC field backstops •Track Discus fencing and ring •Parking lot paving $200,000 (est)•Softball field scoreboard $10,000 (est)•Baseball, Softball, Lee Barnes’ PA Sound
System $60,000 (est)•New Dugouts $100,000 (est)
![Page 20: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/20.jpg)
Lower Field Concession, Training, and Restrooms•Budget Estimate $100,000
![Page 21: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/21.jpg)
Dugout and Discus Ring Example
![Page 22: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/22.jpg)
Thunderbolt Track and Field•Site Engineering and Design $230,400•Turf $380,000•Track $300,000
•TOTAL $910,000
![Page 23: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/23.jpg)
Thunderbolt Example
![Page 24: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/24.jpg)
Long Term Projection •Budget Estimate for Renovation and
Resurface $661352
![Page 25: Athletic Plan Update](https://reader031.vdocuments.us/reader031/viewer/2022030214/588b2dfa1a28abed688b6f19/html5/thumbnails/25.jpg)
PROJECT TOTALS• LIGHTING $175,000• TRACK $300,000• TURF LEE BARNES STADIUM $610,400• LEE BARNES SEATING $436,800• LEE BARNES CONSESSION/RESTROOM/STORAGE
$100,000• LOWER FIELD CONSESSION/RESTROOM/STOARGE
$100,000• LOWER FIELD TURF $1,599,150• LOWER FIELD BLEACHERS $81,298• THUNDERBOLT TRACK AND FIELD $910,000• LF FENCING PARKING LOT PAVING $370,000• UP KEEP YEAR 10-15 $661,352• PROJECT ESTIMATE $5,344,000