Stapleton Redevelopment
• Stapleton Airport closed in 1995• Largest Brownfield Urban Project• 4000 Acres
2900 acres Developable1100 acres Open Space
• Redevelopment began in 1998• Three programs:
EnvironmentalDemolitionAirfield Pavement Removal
![Page 3: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/3.jpg)
Development
• Land Transfer Environmental Standards– Stapleton Numeric Criteria-SNC
• City, EPA and State of Colorado
– Certification from Property Owner– NFA/NAD for Environmental Sites
• Approximately 120 NFA’s received
• Master Developer Chosen
![Page 4: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/4.jpg)
Asbestos
Under Regulation 8
• 125 Building abated prior to demolition
• 50% of the Fuel Distribution System
• Utilities:
Water
Electric
Communication/ Telephone
![Page 5: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/5.jpg)
Asbestos in Soil
• Lowery and Buckley
• Regulation Change - May 2006
• Land Transfer Requirements
• Industry Changes– Environmental Site Assessments– Sophistication of Asbestos Abatement
Contractors– Close out reports / NFA Requests
![Page 6: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/6.jpg)
Highline Canal Phase 1 Filing 16
History
• City Purchased the land for airport expansion mid 1950’s
• Lateral of the Highline canal
• Canal backfilled with mixed waste
• Overall site was backfilled for runway expansion-mid 1960’s
![Page 7: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/7.jpg)
Filing 16 Timeline
• Environmental Assessments- 6/04 and 1/05• Site Characterization- Summer 2005• Work Plan Approved by CDPHE - Fall 2005• Insurance Acceptance of Claim Fall 2005• Project Bid - November 2005• Contractor Selected - January 2006• NTP – March 2006• Abatement – April 2006- Current
![Page 8: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/8.jpg)
Filing 16 2006
![Page 9: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/9.jpg)
Filing 16 - 2008
![Page 10: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/10.jpg)
Filing 16 Timeline
• Work Plan Approved by CDPHE - Fall 2005
• Joint meeting with CDPHE - March 2006
• Original Work Plan amended 3 times
• Development of site wide work plan
• Creation of Clearance Protocol -Fall 2006
• Suspension of Work Plan- October 2008
![Page 11: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/11.jpg)
Filing 16
• Original Scope of Work– Est. 120,000 yds
• 70,000 yds Non- Friable ACM• 50,000 yds Friable ACM• Area approximately 40 acres• Duration 180 days
• Actual – Est. 730,000 yds
• 480,000 yds Non- Friable ACM• 250,000 yds Friable ACM• Area increased to 105 acres• Duration 29 months
![Page 12: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/12.jpg)
Filing 16
![Page 13: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/13.jpg)
Filing 16
![Page 14: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/14.jpg)
Filing 16
![Page 15: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/15.jpg)
Filing 16
![Page 16: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/16.jpg)
Filing 16
![Page 17: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/17.jpg)
Filing 16
![Page 18: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/18.jpg)
Filing 16
![Page 19: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/19.jpg)
Filing 16
Suspension of Work• Why?
• City reached Sitewide Cap on costs
• Insurance reimbursement – Slow in payments– Payments in arrears.
![Page 20: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/20.jpg)
Filing 16
Suspension of Work
Site Status• Canal Cleared
• 88% of the total site has been cleared
• 15% of the site has been backfilled
• Remaining area is under a stockpile.
![Page 21: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/21.jpg)
Filing 16
Suspension of Work• Site Security
• Site Stabilization
• Protection of Human Health and Environment
• Air Monitoring
![Page 22: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/22.jpg)
Filing 16
Insurance Reimbursement
• Original Scope of Work
$7,000,000.00
• Estimate to Completion
$50,000,000.00
![Page 23: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/23.jpg)
Stapleton
Asbestos• One site complete - closure report and
NFA submitted
• Two sites complete –awaiting submittal
• Two sites in progress
• Five sites not started
![Page 24: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008](https://reader038.vdocuments.us/reader038/viewer/2022110405/56649ef95503460f94c0b213/html5/thumbnails/24.jpg)
Stapleton
Lessons learned• Site size-
• Unit pricing• Type of equipment to be used• Wetting methods
• Material –• Friable• Non-Friable• Mixture
• Mechanical means• Use of excavators, graders, other heavy equipment
• Soil preparation• Methods to achieve “adequately wet”