Johnson LaneArea Drainage Master Plan
Floodplain Management Association
September 6, 2018
![Page 2: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/2.jpg)
![Page 3: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/3.jpg)
•FEMA Cooperative Technical Partner (CTP) grant•Douglas County
JLADMP
Project Funding
![Page 4: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/4.jpg)
• Data Collection• Topographic Mapping (LiDAR + Survey)• Watershed Assessment
• Geology• Historical Flow Paths
• Flood Hazard Assessment• Hydrologic Modeling• Hydraulic (2D) Modeling
• Flood Hazard Classification• Flood Mitigation Alternatives
• On-Site/Local• Regional
Johnson Lane ADMP Major Project Elements
![Page 5: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/5.jpg)
• Lot-Split Development (“Wildcat”)• Minimal drainage infrastructure• High sedimentation• Changing flow paths• Minimal public
right-of-way
Challenges
![Page 6: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/6.jpg)
Flood Hazard Assessment
• Hydrologic Modeling (HEC-HMS)• Four Storm Events
• 25-year, 24-hour storm• 100-year, 6-hour storm• 100-year, 24-hour storm• July 2015 storm estimate
•Hydraulic Modeling (2D)• 10-foot grid element (4M total grids)
• Sedimentation Engineering
![Page 7: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/7.jpg)
![Page 8: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/8.jpg)
Verification of Existing Condition Results
• USGS gage records for Johnson Lane Wash• Resident flooding experience• Past flood damage reports• USGS Regional Regression
![Page 9: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/9.jpg)
![Page 10: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/10.jpg)
Flood Hazard Assessment
• Sediment Engineering• Collected 20 samples• Washes with high sediment transport capacity
• Identify need for sediment basins
![Page 11: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/11.jpg)
Buckbrush Wash
![Page 12: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/12.jpg)
Flood Hazard Classification
• Identify specific hazard areas for:• Pedestrians• Vehicles• Buildings
• Inundation depth
![Page 13: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/13.jpg)
• Individual Lot Management Plan• Individual Lot Retention• Collector Road All-Weather Access• Off-Highway Vehicle Impacts• Roadside Ditch Lining• Regional Alternatives
• Contour Trenching• Off-Site Detention
Flood Mitigation Alternatives
![Page 14: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/14.jpg)
Regional Mitigation Alternatives
•On-site mitigation limited impact• Community-wide solutions
![Page 15: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/15.jpg)
Regional Mitigation Alternatives: Contour Trenching
• Contour Trenching• Trap runoff• Interim solution
• Pine Nut Mountain Assessment• 100-year, 6-hour storm
• 64% reduction Romero Wash• 62% reduction Skyline Wash• 23% reduction Stephanie Wash• 0% reduction Chowbuck Wash
![Page 16: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/16.jpg)
Regional Mitigation Alternatives: Off-Site Detention
Sediment/Detention Basins w/ Collector and Conveyance Channels
Regional Systems• Unnamed Wash A• Hot Springs-Buckbrush• Pine Nut North• Pine Nut South• Johnson Lane Wash Dam
![Page 17: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/17.jpg)
Johnson Lane Wash Alternatives
• Investigated several locations for detention basins
• Detention volume required very large, deep basins
• Most viable alternative was a dam structure upstream of Mackay St. alignment
• Designed for ½ PMF and full PMF
![Page 18: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/18.jpg)
Southeast 100-Year Sediment Basin
![Page 19: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/19.jpg)
JL Wash Dam PMF
![Page 20: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/20.jpg)
Prioritization Ranking Metrics
• Downstream protected area (total # structures)• Buildings removed from flooding risk• Percent flow reduction• Construction/maintenance cost• Reduction in economic losses (HAZUS)
![Page 21: Area Drainage Master Plan - cdn.ymaws.com · Contour Trenching •Contour Trenching •Trap runoff •Interim solution •Pine Nut Mountain Assessment •100-year, 6-hour storm •64%](https://reader033.vdocuments.us/reader033/viewer/2022042401/5f104a2f7e708231d4485ff5/html5/thumbnails/21.jpg)
Initial Prioritization
Priority System Design Level Construction Cost
1 Pine Nut North 25-Year $880,000
2 Johnson Lane Wash Dam PMF $4,900,000
3 Hot Springs-Buckbrush 100-Year $8,020,000
4 Pine Nut South 25-Year $1,130,000
5 Unnamed Wash A 25-Year $240,000