Download - Arch8920 final portfolio sikai & wu
![Page 1: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/1.jpg)
![Page 2: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/2.jpg)
Project Brief
ROCK MUSICE EXPERIENCE | SPACE EXPLORATION | CONTINUITY
SITE CONDITION
This is a 300 seats performing center design with additional programming located in Asheville River Side Arts District, Nouth Carolina. The performing center includes Block Box, Shops, Rehearsal room, Design studio and other service spaces. The additional programming could be choosen by designer himself. Combine with the site, Rock Music Experience is selected as the programming topic. As a music town and arts district area, the design could continue the local culture of music art and attract people to come. Exploration is another core concept of this programming, the space design will attract people walk into the site and expore and discovery the rock music when they visit the experience center. The design eliminates the boundary of indoor and outdoor space, the music experience is not limited inside buildings.The nautre harmonious is also an important point to consider in design process. A good design will not damage the existing landscape but improve it and bring new life to the area.
Asheville is a famous art city. The site is beside Asheville Art District as an extension of Art District. The design should consider the relationship with art, artists.
The site has beautiful and comfortable nature context. A good design never damages the balance between human and nature but improve and make it better.
Asheville is a famous art city. The site is beside Asheville Art District as an extension of Art District. The design should consider the relationship with art, artists.
![Page 3: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/3.jpg)
SITE PHOTO
![Page 4: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/4.jpg)
SITE PLAN
SITE PLAN
![Page 5: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/5.jpg)
SITE ANALYSIS
FLOODING AREA
ZONING DIFFERENT ALTITUTE
FLOODING PROTECTION
![Page 6: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/6.jpg)
RENDERING
![Page 7: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/7.jpg)
MASS ANAYSIS
BUILDING MASS
DIVISION
![Page 8: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/8.jpg)
LOAD DIAGRAM 1. HORIZONTAL STRUCTURE
EXAMPAL I
EXAMPAL II
2. VERTICAL STRUCTURE
3. BEARING WALL + BRACING
![Page 9: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/9.jpg)
STRUCTURE
EXAMPAL I
EXAMPAL II
![Page 10: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/10.jpg)
![Page 11: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/11.jpg)
POLYCARBONATE
![Page 12: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/12.jpg)
HAVC SYSTEM VAV SYSTEM
ADVANTAGE
1. A variable air volume system is highly efficient because the minimal amount of air required is used to keep a sapce at its design temperature.
2. Since a VAV box is linked to a thermostat, the ability to control temperature in a space is independent of other spaces.
![Page 13: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/13.jpg)
HAVC DIAGRAM
![Page 14: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/14.jpg)
OPEN STAGE
![Page 15: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/15.jpg)
![Page 16: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/16.jpg)
FLOOR PLAN
![Page 17: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/17.jpg)
![Page 18: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/18.jpg)
SECTION
![Page 19: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/19.jpg)
![Page 20: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/20.jpg)
SECTION
ELEVATION
![Page 21: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/21.jpg)
![Page 22: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/22.jpg)
PERFORMING CENTER
![Page 23: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/23.jpg)
![Page 24: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/24.jpg)
WALL SECTION
![Page 25: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/25.jpg)
WALL SECTION MODEL
![Page 26: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/26.jpg)
MASS MODEL
![Page 27: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/27.jpg)
MASS MODEL
![Page 28: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/28.jpg)
STRUCTURE MODEL
![Page 29: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/29.jpg)
STRUCTURE MODEL
![Page 30: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/30.jpg)
PRESENTATION BOARDS
![Page 31: Arch8920 final portfolio sikai & wu](https://reader030.vdocuments.us/reader030/viewer/2022020520/579054d91a28ab900c925d2d/html5/thumbnails/31.jpg)
PRESENTATION BOARDS