APPENDIX B COAST SMART CRITERIA WAIVER FORM
Project Title: ______________________________________________________
Date Submitted: ___________________________________________________
Summary Description of Project: _________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Approval Requested by:
Agency: _____________________________________________________________________________
Staff to present project to Smart Growth Coordinating Committee (SGCC): ________________________
Target date to be presented/ reviewed by SGCC: _____________________________________________
Waiver Request (Identify siting and/or design criteria for which a waiver is being sought): __________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________
Waiver Justification(s):
Sufficient Structural Protection Measures Adequate Natural and Nature-Based Resiliency Measures Positive Cost-Benefit Analysis Unique Socio-Economic or Cultural Considerations Statutory/ Regulatory Conflict External Grant Funding Criteria Mapping Error No Foreseen Significant Danger to Public Health, Welfare, or Safety � Other ______________________________________________
Materials Provided:
Coast Smart Assessment and Certificate – II. Project Screening Checklist, pp. A6-A10 Project Site Plans and Designs Maps project location, surrounding land use and road network
Project Funding:
Cost of Project: ______________________________________________ Funding Source: ______________________________________________
COAST SMART CONSTRUCTION PROGRAM (2018)
B - 1
SGCC Decision:
APPROVED APPROVED WITH CONDITIONS FORWARD TO SMART GROWTH SUB-CABINET FOR CONSIDERATION
Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
COAST SMART CONSTRUCTION PROGRAM (2018)
B - 2