8/14/2019 Andro - Project Profile
1/19
1
A
PROJECT REPORT
FOR
INTEGRATED HANDLOOM DEVELOPMENT
SCHEME
ANDRO CLUSTER,
IRILBUNG SUB-DIVISION,
IMPHAL EAST DISTRICT, MANIPUR
SUBMITTED BY
DEPARTMENT OF COMMERCE & INDUSTRIES,
GOVERNMENT OF MANIPUR
---------
-
8/14/2019 Andro - Project Profile
2/19
2
ANDRO CLUSTER
I N D E X
S.No. Particulars Page Nos.
1. Diagnostic Study Report 1 to 7
2. Action Plan 8 & 9
3. Annexure-A-I Selection of Implementing
Agency and Selection of Cluster for Diagnostic
Study
10 to 12
4. Geographical Locations of the Cluster 13 A & B
5. Annexure-A-2- Basic Survey of Cluster 14 to 45
6. Annexure-A-3-Diagnostic Study report and
Action Plan for Cluster Development
46 to 49
7. Financial Outlay 50 & 51
8. Year-wise break up 3 years (Physical and
Financial)
52 & 53
-
8/14/2019 Andro - Project Profile
3/19
3
DIAGNOSTIC STUDY FOR
ANDRO CLUSTER OF IMPHAL EAST DISTRICT
UNDER INTEGRATED HANDLOOM DEVELOPMENT SCHEME
1. Introduction:
Cluster approach for a holistic development of micro, small and medium enterprises is
being attempted all over the world particularly in the developing countries including India
on a wider scale. The Development of identified handloom clusters in the third phase of the
implementation of Integrated Handloom Cluster Development Programme in the country.
Towards that end, a Diagnostic study has been conducted on by The Department of
Commerce & Industries, Govt. of Manipur covering Andro Handlooms Cluster in Imphal
East District under Integrated Handloom Development Scheme.
The Primary aim of the Diagnostic study is to identify what ails in the cluster. Thedetailed objectives of the cluster are detailed below.
To understand the current socio economic profile of the cluster To evaluate the current status of Handloom Cluster in terms of the product variety,
yarn availability, the number of functional or non-functional looms, role of support
organization and prevailing infrastructure facilities.
To highlight the constrains faced by the cluster and suggest some action plans forfuture.
In order to fulfill the above mentioned objectives the primary survey in the cluster has
been conducted as well as diagnostic study by the Department of Commerce &
Industries, Govt. of Manipur, for understanding of the cluster is based on analyzing thevalue chain that exists in the cluster. It includes the suppliers of raw material (backward
linkage), the Weavers (Producers), the traders/Exporters (Forward linkage), and support
institutions/ organizations. The support institutions are the Government bodies and
social organization which held the various activities of the entire value chain.
Generally, that support organizations include the National Handloom Development
Corporation (NHDC) Ltd., Weavers Service Centre, National Institution of Fashion and
Technology (NIFT), the Weavers Cooperative Societies and master weavers.
A meeting of prominent weavers, Master Weavers, Prominent weaving
community leaders, staff of the Cooperative Societies of cluster has been conducted
and held various discussions regarding availability of raw materials, production
capacity, product diversification, marketing, infrastructure facilities and the problems
being faced by them are noted below.
Types of product manufactured Raw material procurement Traditional preparatory work Dyeing and design facilities Use of t traditional looms Product market structure Competitive analysis Lack of working capital and availability of Finance.
-
8/14/2019 Andro - Project Profile
4/19
4
2. Background of the Cluster:Ministry of Textiles, Govt. of India have sanctioned 05 No. of clusters in Manipur. The
first phase for the year 2005-06 was implemented through IIE, Guwahati and another
04 Nos. of clusters in 2nd
phase for the year 2006-07 have also been sanctioned.
Evaluation of the Cluster:
Andro is 27 Km. away from Imphal in the eastern part inhabited by Scheduled Caste
under Irilbung Sub-Division of Imphal East Revenue District. The area is adjacent to a
Cultural Complex. There is population of more than 4000 having about 850 weaver
households in the cluster of which about 300 weavers households are affiliated to the
Cooperative Society and remaining weavers are outside the cooperative folds. There are
about 550 independent Weavers, 80 shed weavers, 600 wage weavers and 30 master
weavers. Of the total 350 looms in the cluster 66 % are working and 44% are idle. In
the cluster, female weavers are 97% and engaged in the occupation of the weaving
industry in the major way even though their contribution is either paid or poorly paid
for the ancillary activities if performed by her outside the family weaving.
The members of the weavers Cooperative Societies are accustomed to weave
cotton and acrylic varieties, like, bed sheet, lungies, towels, mosquito nets, etc. Due to
deteriorated financial position of the Society member are not getting regular work from
the Society consequently a large number of weavers have diverted to the master
weavers.
The cluster covers 11 adjoining villages. The cluster will cover up the following
villages and lanes: -
1. Whole Andro Village2. Huikap Village3. Yairipok
Major Players in the Cluster
In this cluster the Master Weavers are playing major role in providing employment to
70% to 80% of the weavers in the cluster. They are supplying raw material in the shape
of warps. The weavers are simply put it on the loom and weaving and return the
finished goods, by taking their wages. There are problems of raw materials, dyeing,
common facilities etc. As such the weavers in the cluster are not doing their job
successfully.
The Officer on Special Duty (Handloom), Deputy Director of Handlooms,
General Manager with his Project Manager (Handloom) and Secretaries of the Societies
are the in-charge of the Cluster for implementation of the Scheme.
Current Scenario of Cluster:
Particulars Andro Cluster
Total looms 350
Looms covered under Cooperative fold 150
Looms covered under outside cooperative fold 200
Type of looms
a) Loin Looms 280
b) Fly Shuttle Frame Looms 70
-
8/14/2019 Andro - Project Profile
5/19
5
Types of product manufactured : 49 No. of Women Weavers : 850 No. of Society : 02 No. of Societies working : 02 Turnover of the area : Rs.2030 lakhs Outstanding loan : Nil Products :Shawls, Mekhla, Bed sheets, Ladies wear,
muffler, etc.
Wage Rage : Rs. 35 to Rs. 46 Present loan amount : Nil Cash credit limit Rs. 110.0 lakh CC renewal for the year 2007-08 : Rs.105.00 lakhs
The annual turnover of the cluster is Rs.2030 lakhs and the last 5 years turnover is as
detailed below:-
1. 2002-03 Rs.1,060.00 lakhs
2. 2003-04 Rs.1,200.00 lakhs
3. 2004-05 Rs.1,100.00 lakhs
4. 2005-06 Rs.1,900.00 lakhs
5. 2006-07 Rs.2,030.00 lakhs
Socio-economic profile:
In this cluster the entire weaving activity is totally dominated by backward classes. The98% of the weavers are BPL families. There is no un-employment in the industry. But
due to social and economic changes the youngsters are not being attracted for weaving
profession but opting for other professions.
3. Main Handloom Products:
Major products of the cluster are cotton and acrylic products f Shawls, Bed sheets,
lungies, muffler, dress materials, mekhla (phanek) and school bags. The entire stocks of
the weavers are being marketed through societies and individual sales depots which
are 12 showrooms in Ema Market and in other small towns and master weavers. There
are no professional dyers in the cluster and the raw material is being supplied by the
Departmental Raw Material and master weavers after grey yarn is dyed and sized.
4. Powerlooms in the Cluster:
There are no power looms in the cluster.
5. Handloom Mark:
As the Government has introduced the Handloom mark scheme with a view to providecollective identity to the handloom woven products and distinguish them from power
loom and mill products. All the societies and producers are being registered with the
Textile Committee, Ministry of Textiles for supply of Handloom Mark Labels.
-
8/14/2019 Andro - Project Profile
6/19
6
6. Economic conditions of the weavers in the cluster:
The earning of the weavers families are average. Many welfare schemes are being
implemented by Govt. of Manipur as well as Govt. of India and as such the weavers
families are self sufficient and having proper security for their livelihood. The
following schemes have also been implemented as advantageous for the weavers.
a) Integrated Handloom Villages Development Schemeb) Project Package Schemec) Health Package Schemed) Mahatma Gandhi Bunkar Bima Yojanae) Housing cum-work shed schemef) Thrift fund com saving security schemeg) Deen Dayal Hathkargha Protsahan Yojanah) PMRY (Prime Minister Rojgar Yojana)
7. SWOT Analysis:
The Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis has
been done keeping in mind the historical background, geographical, social, and
economic and Industrial related core issues and conditions existing in the cluster.
Strengths:
Market, Product Development and Technology
There is good potential in the domestic market for all the products There is good demand for tribal shawls products in all over India and abroad Local consumption is high Societies and individual weavers have many sales outlets in and outside States. Possibility of creating new product range beside the existing to explore the market Ample scope for product diversification by developing new designs. Having good handloom concentration Availability of skilled weavers Marketing /development Assistance is provided by Govt.
Weakness
Market, Product Development and Technology
No local adequate market No local raw material supplies No collective efforts related to marketing Internal competition for marketing of goods leads to differentiation in prices Dependence on few products No regular work for weavers Low productivity No exposure to information Technology Low education level and poor economic condition of weavers Absence of weavers association No availability of sizing locally Inferior quality of dyeing Lack lf publicity
-
8/14/2019 Andro - Project Profile
7/19
-
8/14/2019 Andro - Project Profile
8/19
8
ACTION PLAN FOR IMPLEMENTATION OF THE CLUSTER DEVELOPMENT
APPROACH
------
I. Trust Building:
The following action, are to be implemented fro trust building among the weavers.
Exposures visit to successful clusters Conducting workshops at regular intervals Workshop on networking strategy has to be conducted Workshop on quality appraisal of woven fabrics has to be conducted
II. Quality Awareness:
Quality of the products are not up to the export standards because of less attention being paid
by the weavers and master weavers as they do not have technically qualified personal for
quality checking for their final products,. The y are to be educated properly to improve thequality of their products. Therefore, it is proposed to arrange quality awareness campaign on
frequent intervals.
III Raw Material:
A Raw Material centre for supply of different counts of Yarn as required by the Weavers is
proposed for supply of yarn at the cluster head quarters under the scheme.
IV Common Facility Centre:
Infrastructure proposed for establishing a sizing and warping units ion the cluster head quartersfor preparation of pre-looms processing.
V. Dyeing:
There are no facilities for testing of dyeing fastness of the dyed materials. In many of the dye
houses they are not doing the yarn scouring which lead to uneven dyeing. They are using hard
water for dyeing which also causes uneven dyeing. The Dye houses needs to be modernized
with scouring and water softening plants.
VI. Design Development:
The services of the Weavers Service Centre will be taken for the development of new designs
And training of designers is need to create innovative designs as per the market requirement.
VII. Loom and Accessories:
All the weavers are having traditional pit looms. They require Jacquard, dobbies and
accessories top weave new designs and improved their productivity.
VIII Marketing:
The weavers in the cluster are not having any systematic marketing strategy. It needs initiationof efforts to organize market promotion for cluster products through domestics market.
Therefore, it is propose to initiate actions as under:
-
8/14/2019 Andro - Project Profile
9/19
9
Market survey is to be carried out for development of colour designs quality Geographical identification brand has to be registered Manipuri Handloom Establishment of market consortia Buyers and Sellers meets and also specialized retailers meets have to be conducted
at regular intervals
Training in value addition to the traditional saris has to be conducted Use if information technology
IX Finance:
The Andro Cluster is suffering due to lack of working capital. It is therefore the members of
the society have started working under Master Weavers and hence margin money is proposed
for their requirement.
Signature of the President/Secretary/Chief Executives
(Name & Designation)
Countersigned.
Director In/Charge of Handlooms
-
8/14/2019 Andro - Project Profile
10/19
10
PART A
CLUSTER APPROACH
ANNEXURE-A-I
SELECTION OF IMPLEMENTING AGENCY AND SELECTION OF CLUSTER FOR
DIAGLOSTIC STUDY AND BASELINE SURVEY
A. Details of the Organization/Implementing Agency (IA):1. Name of the Organization (with full address) Director of Commerce & Industries,
Lamphelpat, Imphal, Manipur.
2. Registration number and date of Registration Govt. Department
3. Name & Designation of Office bearers with
Phone No., FAX No. and E-mail etc.
1. Shri Dhiraj Yumnam, Director (C&I).
2. Shri M. Rajen Singh, OSD(Handloom)
3. Shri K. Lamlee Kamei,
Dy.Director(HL)Phone- 0385 2414220/469/418
4. Total number of regular manpower with the
Organization
179
5. Balance sheet and loss/profit account for the
last three years (enclosed)
Govt. Department
6. Experience if any in Textiles/Handloom
Sector
05-28
7. Byelaws/Resolution of the Organisation Not applicable
8. Previous experience in Cluster development Nil9. Scoring of the IA as per the pattern for
grading.
Not applicable
B. Profile of the Handloom Cluster to be selected
1. Name of Handloom
Cluster and District.
Andro, Irilbung Sub-Division, Imphal East District, Manipur
2. Geographical
location of the
cluster (enclosedmap of the cluster)
Andro 2740 Km. east of Imphal under Irilbung Sub-Division of
Imphal East District, 24o
59 North and 93o
30 East.
3. Total number of
handlooms in the
cluster
350
3.1 Total Number of
weavers in the
cluster
Category Men Women Total
SC 03 770 773
ST
OBC 27 27
Minority
General 50 50
Total 03 847 850
-
8/14/2019 Andro - Project Profile
11/19
11
4 Status of the weavers in the
cluster
Status Existing
Independent 250
With Master Weavers 90
With Primary Cooperatives 300
With Handloom Apex/GroupWith Self Help Goups 50
With NGOs 160
With exporters
Others
Total 850
5. Present economic
status of the cluster
as compared to 5
years back
(a)Economic level of
the weaver
Economy of the weavers is improving
slightly from Rs.35/- to 46/- per day.
(b) Product
diversification
Traditional patterns have been diversified
for fashion clothing.
(c) Infrastructure
faculties
Road connectivity between inter-villages
have been improved with PMSY, which
have easier for movability around the
area.
(d) Sales Turnover The sales turnover has improved from Rs.
1,060.00 lakh to Rs.2030.00 lakh from
2002-03 to 2006-07.
6. SWOT analysis of
the Cluster
Analysis in brief separately on the strength, weakness,
opportunities and threats.
a) Strengths a) There is good potential in the domestic market for thetraditional items and other products
b) There is good demand for tribal shawls products in all overIndia and abroad
c) Local consumption is highd) Societies have many sales outlets in State and neighbouring
States.
e) Possibility of creating new product range beside the existingrange to explore the market
f) Ample scope for product diversification by developing newdesigns through skilled artisans
g) Having good handloom concentrationh) Availability of skilled weaversi) Marketing /development Assistance is provided by Govt.
b) Weakness a) No local marketb) No local raw material supplies. 3. No collective efforts
related to marketing
c) Internal competition for marketing of goods leads todifferentiation in prices
d) Though efforts were made for new design development, butit is only individual basis
-
8/14/2019 Andro - Project Profile
12/19
12
e) Dependence on few productsf) No regular work for weaversg) Low productivityh) No exposure to information Technologyi) Low education level and poor economic condition of
weavers
j) Absence of weavers associationk) No availability of sizing locallyl) Inferior quality of dyeingm) Lack lf publicityn) There is no application of information technology modern
management techniques for marketing the product design
etc.
o) Credit facilities from financial institutionsc) Opportunities a) Brand Building for traditional saris and other products
b) Scope for reduction in cost dyeing by modernizationc) High demand to handloom productsd) Availability of skilled weaverse) A common raw material Bank for Yarn, dyes and chemicals,
silk yarn zari may be provided for quality up gradation
f) Scope for increasing working looms.g) Introduction of various welfare schemes
d) Threat a) Competition from Mill made productsb) Ensuing globalizationc) Decline in demand of traditional itemsd) Increasing demand for low cost power loom producte) Non up gradation of product technology may also affect
sustainability
f) Higher cost of products7. Justification for
recommending the
cluster for study
a) Highly concentrated and compact weavers in the clusterb) More than 60% of the total population in the cluster are
weavers
c) Women are well acquainted in weaving.d) Weavers can get continuous employment and thereby earn
better wagese) Possible employment generation directly and indirectlyf) There are 950 weavers in the clusterg) 75% to 80% of the weavers are working under Master
Weavers
h) Even though Societies are operating the cluster it is able toprovide employment only 20% of the weavers due to lack of
working capital
i) The relationship between weavers and master weavers arecordial
j) All the weavers in the cluster are having their own looms intheir own houses
8. Duration of the
study
5 Days
-
8/14/2019 Andro - Project Profile
13/19
13
Certified that:
1. The proposal for release of Rs.110.76 lakh has been recommended by the State LevelProject Committee in its meeting held on 07-01-2008. For Baseline Survey and
Diagnostic Study. The minutes of the meting arte encloses.
2. There is no reason to believe that these organizations are involved in corrupt practice.3. Consolidated UC for earlier releases for the year nil has been sent vide State
Governments Letter No. nil dated nil is enclosed. It is also certified that no U.C. in
respect of the above grantee organization is pending.
4. Certified that the above particulars are correct.5. Certified that no complain(s) in respect of the above mentioned agency have been
received in the State in respect of disbursement of assistance released by the GOI and
State in the past.
Signature of the President/Secretary/Chief Executives
(Name & Designation)
Countersigned.
Director In/Charge of Handlooms
-
8/14/2019 Andro - Project Profile
14/19
14
CLUSTER APPROACH
Annexure-A-3
DIAGNOSTIC STUDY REPORT AND ACTION PLAN FOR ANDRO CLUSTER
DEVELOPMENT
-----------
Sl.
No.
Parameters
1. Name of the
Cluster/Ward Village
Andro under Irilbung Sub-Division of Imphal East District
Profile of the Cluster
2. Geographical location
of the cluster
Andro 27 Km. east of Imphal under Irilbung Sub-Division of
Imphal East District. 4391 sq. km., 24o
59 North and 93o
30 East.
3. Number of
handlooms
1350
4. Type of handlooms in
the pocket
Loin Looms and frame looms
5. Infrastructure
available
Weavers have their indigenous loom and managed in their
residential verandah.
6. Present skills of the
weavers
Capable of weaving various intricate traditional dewigns.
7. Number of handloom
weavers
8. Status of the weavers Existing Proposed to be covered
A) Number of Primary Weavers Coop. Societies 02
B) Number of Weavers in Cooperative fold. 300C) Number of Master Weavers 06
D) Number of weavers with Master Weavers 90
E) Number of NGOs working in handlooms 02
F) Number of weavers with NGOs 160
G) Number of SHGs working in Handlooms 03
H) Number of weavers with SHGs 50
I) Number of traders 4
9. Turnover of the pocket (Rs. in crore) Present Turnover Anticipated turn over
a) Domestic 24.12 36.50
b) Exports 1.05 12.00Total 32.17 58.5
10. Average earning of the weaver per day (In
Rs.)
41/-
118/-
11. Main handloom products of the pocket Shawls, Bed sheets, lungies, muffler, dress
materials, mekhla (phanek), and scholl bags
12. Number of Powerlooms in the pocket - Nil -
13. Whether handlooms of the pocket face
competition with Powerlooms
- No.-
Status of Pocket 5 years back
14. Economic condition of
the pocket in relationto the position 5 years
back from now
(a)Economic
level of theweaver
Economy of the weavers is improving slightly
from Rs.45/- to 56/- per day.
(b) Product
diversification
Traditional patterns have been diversified for
fashion clothing.
-
8/14/2019 Andro - Project Profile
15/19
15
(c) Infrastructure
faculties
Road connectivity between inter-villages have
been improved with PMSY, which have easier
for movability around the area.
(d) Sales
Turnover
The sales turnover has improved from Rs.
1,060.00 lakh to Rs.2030.00 lakh from 2002-
03 to 2006-07.
SWOT ANALYSIS
15. a) Strength a) There is good potential in the domestic market for thetraditional items and other products
b) There is good demand for tribal shawls products in all overIndia and abroad
c) Local consumption is hightd) Societies have many sales outlets in State and neighbouring
States.
e) Possibility of creating new product range beside the existingrange to explore the market
f) Ample scope for product diversification by developing newdesigns through skilled artisansg) Having good handloom concentrationh) Availability of skilled weaversi) Marketing /development Assistance is provided by Govt
b) Weakness a) No local marketb) No local raw material supplies. 3. No collective efforts related
to marketing
c) Internal competition for marketing of goods leads todifferentiation in prices
d) Though efforts were made for new design development, but itis only individual basis
e) Dependence on few productsf) No regular work for weaversg) Low productivityh) No exposure to information Technologyi) Low education level and poor economic condition of weavers
j) Absence of weavers associationk) No availability of sizing locallyl) Inferior quality of dyeingm)Lack lf publicityn) There is no application of information technology modern
management techniques for marketing the product design etc.
o) Credit facilities from financial institutionsc) Opportunities a) Brand Building for traditional saris and other products
b) Scope for reduction in cost dyeing by modernizationc) High demand to handloom productsd) Availability of skilled weaverse) A common raw material Bank for Yarn, dyes and chemicals,
silk yarn zari may be provided for quality up gradation
f)
Scope for increasing working looms.g) Introduction of various welfare schemed) Threats a) Competition from Mill made products
b) Ensuing globalizationc) Decline in demand of traditional items
-
8/14/2019 Andro - Project Profile
16/19
16
d) Increasing demand for low cost power loom producte) Non up gradation of product technology may also affect
sustainability
f) Higher cost of productsJustification for
recommending the cluster
16. Justification for
recommending the
cluster for
development
a) Highly concentrated and compact weavers in the clusterb) More than 60% of the total population in the cluster are
weavers
c) Women are well acquainted in weaving.d) Weavers can get continuous employment and thereby earn
better wages
e) Possible employment generation directly and indirectlyf) There are 950 weavers in the clusterg) 75% to 80% of the weavers are working under MasterWeaversh) Even though Societies are operating the cluster it is able to
provide employment only 20% of the weavers due to lack of
working capital
i) The relationship between weavers and master weavers arecordial
j) All the weavers in the cluster are having their own looms intheir own houses
Strategy
a) Cluster The Cluster identified in Andro near Cltural Complex under
Irilbung Sub-Division of Imphal East District which is located 27
Km. away from Imphal City.
b) Objectives of the
development
strategy
a) To evaluate the current status of the Handloom Cluster in terms
of the product variety, yarn availability, the number of active and
ideal looms role of support organization and prevailing
infrastructure facilities; b) To highlight the constrains faced by the
cluster and suggest some action plans for future.
Action Plan
18. Interventions
required for
development over a
period of 3 years,
with financial outlay
for each intervention
1 Formation of Consortium Rs.0.50 lakh
2. Raw Material support Rs.3.00 lakh
3. Skill up geradation Rs.4.50 lakh
4. Design Development Rs.24.00 lakh
5. Infrastructure Rs.7.00 lakh
6. Publicity & Marketing Rs.14.00 lakh
7. Basic Inputs Rs.22.18 lakh
8. Construction of workshed Rs.8.75 lakh
Total Rs.83.99 lakh
-
8/14/2019 Andro - Project Profile
17/19
17
19. Project
Cost
Sl.
No
.
Name of the component Amount (Rs. In lakh weaverto be
coveredGOI State/
IA
Benef
iciaryTotal
1. Base line Survey, Diagnostic
study, Formation of SHGs
- - - - -
2. Consortium building 0.50 0.503. Raw Material 3.00 3.00
4. Skill up gradation 20
a) Training of Weavers 3.00 3.00
b) Training of Dyeing 1.00 1.00
c) Management Training 0.50 0.50
5. Design Development & Product
Diversification
a) Purchase of CATD 2.70 0.30 3.00
b) Engaging Designers 5.40 0.60 6.00
c) Paper design, sample,
assembling.
15.00 15.0
6. Infrastructure/CFC
a) Common Facility Centre 4.50 0.50 5.00
b) Dye House 1.80 0.20 2.00
7. Publicity & marketing
a) Advertising, Brochure,
Catalogue for 3 years
0.45
0.05
0.50
b) Exhibitions/Fairs for 3 years 5.40 0.60 6.00
c) Buyers-Sellers meets 3 years 2.70 0.30 3.00
d) Market Survey/Intelligence 1.00 1.00
e) Awareness and Exposure visit 3years 3.00 3.00
f) Development & Hosting of website 0.50 0.50
8. Project Management Cost
9. Basic Input
a) Margin Money 4.20 1.20 0.6 6.00 100
b) New looms 4.928 1.408 0.704 7.04 88
c) Dobby 2.80 0.80 0.4 4.00 100
d) Jacquard 2.10 0.60 0.3 3.00 50
f) Accessories 1.498 0.428 0.214 2.14 107
10. Construction of Workshed 8.75 8.75 35
Sub-total 9.726 21.986 2.218 83.93 500
11. Civil amenities
a) Approach roads 10.83 10.83
b) Education 6 6
d) Drinking water facility 3 3
e) Crche centre(Child Day care
Centre) for children of the
weaver
2 2
f) Primary education for children
of the weaver
5 5
Sub-total 26.83 26.83
Grand total 86.556 21.98 2.22 110.76
-
8/14/2019 Andro - Project Profile
18/19
18
20 Propose
d Action
Plan for
the
cluster
Year-wise action plan highlighting the physical and financial targets for 3 years
along with a brief project report should be enclosed.
1. The beneficiary has not availed of any similar assistance under any other scheme of theState or the Central Government
2. The Implementing Agency is functioning3. There is no reason to believe that these organizations are involved in corrupt practice.4. Consolidated UC for earlier releases in respect of the grantee organization under IHDS
has been sent vide State Governments letter No Nil dated Nil is enclosed. It is also
certified that no U.C. in respect of the above grantee organization is pending under
IHDS.
5. Certified that the above particulars are correct and are verifiable from Books ofaccounts of the grantee agency.
6. Certified that no complaint(s) in respect of the above mentioned agency have beenreceived in the State in respect of disbursement of assistance released by the GOI andState in the past.
7. Certified that the Implementing agency(s) has obtained necessary approval from theBanks/financial institutions for credit linkages, wherever required.
8. Certified that the Implementing Agency has furnished the requisite details in the9. Proforma A-2 (Baseline Survey of Cluster), enumerating, interalia, the names of the
individual weavers, components required and the assistance required thereof etc. and is
verifiable from records.
10.The proposal has been recommended by the State Level Project Committee on. . The minutes of the meting are enclosed.
(Signature)
President/Secretary of Organization
Countersigned.
Director In-charge of Handlooms & Textiles.
-
8/14/2019 Andro - Project Profile
19/19
19
YEAR-WISE FINANCIAL OUTLAY BREAK UP FOR UTILIZATION OF THEFUNDS ANDRO CLUSTER
-------DISTRICT: IMPHAL EAST
(Rupees in lakh)
Sl.No Name of the Component 2007-08 2008-09 2009-10 TOTALPHY FIN PHY FIN PHY FIN PHY FIN
1. Base line Survey, Diagnostic
study, Formation of SHGs
2. Consortium building 1 0.50 1 0.50
3. Raw Material 1 1.00 1.00 1.00 1 3.00
4. Skill up gradation
a) Training of Weavers 10 1.50 5 0.75 5 0.75 20 3.00
b) Training of Dyeing 20 1.00 20 1.00
c) Management Training 20 0.50 20 0.50
5. Design Development & Product
Diversificationa) Purchase of CATD 1 3.00 1 3.00
b) Engaging Designers 1 2.00 1 2.00 1 2.00 3 6.00
c) Design Paper, sample, assembly 5.00 5.00 5.00 15.00
6. Infrastructure/CFC
a) Common Facility centre 1 5.00 1 5.00
b) Dye House 1 2.00 1 2.00
7. Publicity & marketing
a) Advertising, Brochure,
Catalogue for 3 years
1 0.50 1 0.50
b) Exhibitions/Fairs for 3 years 1 2.00 1 2.00 1 2.00 3 6.00c) Buyers-Sellers meets for 3 years 1 1.00 1 1.00 1 1.00 3 3.00
d) Market Survey/Intelligence 1 1.00 1 1.00
e) Awareness and Exposure visit 3 yrs 1 1.00 1 1.00 1 1.00 3 3.00
f) Development & Hosting of website 1 0.50 1 0.50
8. Project Management Cost
9. Basic Input
a) Margin Money 30 1.80 40 2.40 30 1.80 100 6.00
b) New looms 40 3.20 24 1.92 24 1.92 88 7.04
c) Dobby 50 2.00 25 1.00 25 1.00 100 4.00
d) Jacquard 20 1.20 15 0.90 15 0.90 50 3.00
e) Accessories 53 1.06 27 0.54 27 0.54 107 2.14
10. Construction of Workshed 15 3.75 10 2.50 10 2.50 35 8.75
Sub-total 270 40.51 150 22.01 140 21.40 560 83.93
11. Civil amenities
a) Approach roads 1 7.83 1 3.00 2 10.83
b) Education 1 6.00 1 6.00
d) Drinking water facility 1 3.00 1 3.00
e) Crche centre(Child Day care
Centre) for children of the weaver
1 2.00 1 2.00
f) Primary education for children
of the weaver
1 5.00 1 5.00
Sub-total 5 29.71 1 3.00 626.83
Grand total 275 70.22 151 25.01 140 21.41 566 110.76