AL-HASSAN ENGINEERING CO. S.A.O.GPROJECT: AMAL POWER STATION
PDO CONTRACT NO: C-311333
SAMPLE 09m`
DOCUMENT NO
WEEKLY PROGRESS REPORT
AL-HASSAN ENGINEERNG CO. SAOGPROJECT: AMAL POWER STATION
(PDO CONTRACT NO: C-311333)
Doc. No: Rev. No : Date: Page 2 of 6
WEEKLY PROGRESS REPORT
Document NoRev No
DateNo. of Pages
DescriptionPrepared
ByReviewed
byApproved by PDO
TABLE OF CONTENTS
Page
Section 1 Project Progress Highlights & Plan for next week
1.01 Health Safety and Environment
1.02 Quality Assurance
1.03 Engineering and Design documents
1.04 Procurement
1.05 Material Manufacturing & delivery
1.06 Mobilization & Site Establishment
1.07 Construction , Pre commissioning & Commissioning
Section 2 Milestone status
Section 3 Manpower histogram Planned Vs Actual
Section 4 Area Of Concern
Doc. No: Rev. No : Date: Page 3 of 6
WEEKLY PROGRESS REPORT
SECTION 1 PROJECT PROGRESS HIGHLIGHTS & PLAN FOR NEXT WEEK
1.01 HEALTH SAFETY AND ENVIORNMENT
Activity Performed during the week Plan for next week
*
1.02 QUALITY ASSURANCE
Activity Performed during the week Plan for next week
1.0 ENGINEERING AND DESIGN DOCUMENTS
Activity Performed during the week Plan for next week
1.04 PROCUREMENT
Activity Performed during the week Plan for next week
1.05 MATERIAL MANUFACTURING AND DELIVERY
Doc. No: Rev. No : Date: Page 4 of 6
WEEKLY PROGRESS REPORT
Activity Performed during the week Plan for next week
1.06 MOBILISATION AND SITE ESTABLISHMENT
Activity Performed during the week Plan for next week
1.07CONSTRUCTION, PRECOMMISSIONING AND COMMISSIONING
Activity Performed during the week Plan for next week
Civil
PIPING AND MECHANICAL
ELECTRICAL
INSTRUMENTATION
Doc. No: Rev. No : Date: Page 5 of 6
WEEKLY PROGRESS REPORT
Testing and Commissioning
SECTION 2 MILESTONE STATUS
SECTION 3 MANPOWER HISTOGRAM PLANNED VS ACTUAL
Annexure 1 attached
SECTION 4 AREA OF CONCERN
Doc. No: Rev. No : Date: Page 6 of 6