ALL4NEPAL – Update No4
So what can we do......
Global Partnership
Making a Difference
RT NEPAL
Nepal Quake 2015
• A massive earthquake of magnitude 7.9 on the Richter scale
struck Nepal on 25th April 2015 at 11:56 a.m.
• The intensity of the quake spread to several countries
surrounding Nepal like Bangladesh, Bhutan, China and India
• More than 7000 deaths (Figures estimated to cross 12000
deaths)
• More than 14000 injured
• 8 million people affected in Nepal alone
• 2.8 million children in need of humanitarian assistance
• More than 80% buildings damaged in villages of Nuwakot &
Sindhupalchowk districts alone
Districts affected : 36Schools completely damaged : 575Schools partly damaged : 969Students Affected :1.5 Million
Why Round Table’s focus is on Schools?
Over 30.000 Class rooms have been destroyed by this Earth Quake in Nepal. About 1 million students don’t have place to study.
If Children do not get back to school and in education again, they may get engaged in labour jobs and never return to school and will have a potential devastating effect on there lives and that of Nepal in the future.
When schools have been made, it can be used as shelter for community at night and in day time children can get education.
Our Long Term strategy: Rehabilitation
Objective
Our aim is to build 100 classrooms and 50 TLC's (temporary learning centers).
We have chosen Nuwakot which is about 2 hours from Kathmandu, as its one of the most affected area.
We will have two kinds of reconstruction –
•Retrofitting the damaged structures •Building completely new room
Our classrooms will be as per the approved design of the Government and we will take permission from the District Education Officer.
BudgetAs all the engineers are busy, we have not got all the cost for retrofitting and repair. The costing have started coming in and we are on the process of scrutinizing.
Rationale
Non Clearing of debris may prevent the students from going to school due to fear of the existing damaged school building.
Stopping to go to school now might end up in the children starting to do odd jobs. They may never return back to school. This leads to the high risk of children being engaged in child labor
TLC and Classrooms
The Goverment is working cost effective design for regular classroom, since it does not have budget its not priority at the moment.
Goverment is working on starting all the schools asap with temporary learning centers (TLC) there are 2 types of TLC’s temporary made of bamboo and tarpaulin and second is semi permanent with steel structure and corrugated sheets.
Goverment wants schools to get into operational asap using TLC and slowly build permanent classrooms when they get budget for the same.
We are in the process of making Steel TLC which can later be converted to permanent classroom by adding flooring, walls, doors and windows. The ones that we have completed have the floor and half wall included from the start.
Project Activities
Building of new Classrooms Retrofitting / Repair Existing Ones
Phase 1•Supplying necessary construction Materials•Erection of the frame•Foundation, floor and half wall•Corrugated sheets for roofing•Finishing and handling over to the school management
• Schools and classrooms which have damages will be verified & checked by structural engineers and report issued to see if cost effective to repair.
• Based on recommendations from the structural engineer & approval by MoE will provide necessary retro fitting & repairs to those schools deemed cost effective to do.
Phase 2
•Later, after approval of design from MoE, we plan to make this building permanent by making necessary windows, doors etc.
Steel Structure TLC Design
Steel Structure under construction
Cost of TLC / Class rooms
Stage 1Cost of each TLC block is approx. US$ 3000
Stage 2Approx cost of converting TLC block into permanent classroom is us$ 5000
Total cost of Classroom block (stage 1 + Stage 2) = US$ 8000
Each Block has 2 classes . That is US$ 4000 per permanent classroom
Shree Shivalaya Madhyamik Vidyalaya
Total No. of students – 450. Total staff – 17. Total Classes – nursery to 10, total 12Total no. of rooms – 18 out of which 12 are fully damaged. Planned 2 TLC blocks to meet immediate requirement.
New Classroom
Cost of Building TLC Blocks no 2
Phase 2 converting into class room
TLC - 2 X 3000 = Us$ 6000 Class room – 2 X 5000 = US$ 10000
Shree Shivalaya Madhyamik Vidyalaya construction
Due to space constraint’s we are making 1 block initially.
Nava Jeevan Madhyamik Vidhyalaya
Total Students: 350 (Boys-60%,Girls-40%). Total Classes: 1 to 10, total no. of rooms - 15Total staff – 16. Building made of bricks and steel Truss, 2 class rooms fully damaged , 6 classrooms need to be demolished and new need to be built. Land ownership is of school. Manpower available for help. Need to build toilets
Cost of Building TLC Blocks no 3
Phase 2 converting into class room
TLC - 3 X 3000 = Us$ 9000 Class room – 3 X 5000 = US$ 15000
New Classroom
Shree Okharpauwa Madhyamik Vidyalaya
Total No. of Students: 350 to 400. Total No. of Staff: 21All classrooms made of concrete and are damaged. 10 class room block will be retrofitted, Toilets to be built and retention wall to be made.
Retrofitti
ng
Cost of Retrofitting and toilet etc US$ 17,500
Bal Binod School
• Built by kirt7 under 11SFN. • Damaged by recent earthquake . • Engineer will be giving his recommendation to repair soon .
Retrofitti
ng
Cost of retrofitting – Awaiting report
Shree Shrijansil Prathamik Vidyalaya
• No. of Classes – 4, Staff – 4, Students – 50 to 60 approx.• No extra space to make new building • Building is fully damaged• Truss has been broken and fallen apart • No pillar in buildings• Toilets ok
Cost of Building TLC Blocks no 2
Phase 2 converting into class room
TLC - 2 X 3000 = Us$ 6000 Class room – 2 X 5000 = US$ 10000
New Classroom
Shree Ajingare Higher Secondary School
• Class – 7,8,9,10 – plan to use the same steel post structure and break the walls
• Class – 2,3,4,5 – steel structure from Japan aid, so just need to break the walls
• Computer Lab, Staff Lab, Library, Staff Canteen – Break all the walls as no steel structure
• Principle’s office, Staff room & library not usable• *Note - No extra space to make new building.
Retrofitti
ng
+ rebuilding
Awaiting reports and costs for works
Shree Mahadev higher Secondary School
Total no. of students – 623(40% boys, 60% girls). Total classes running – nursery to 12 and bachelors also. Tot no. of staffs – 23 excluding 10 bachelor level staffs. Total no. of rooms – 27 among which 17 is used for running school. School has occupied almost 23 ropanies of land, 5 ropanies is in its own name, the other land in the name of VDC.2 of the buildings made with Japanese Aid but fully damaged, truss can be used.No fund provided till date but Adams group of China has made around 14 truss.Total classes required to operation – 17 to 21.Has problem of bamboo and manpower
Cost of Building 8 Blocks Cost of Retrofitting
Under scrutiny
Shree Mahadev Higher Secondary School, Duipiple
Total Students – 425 to 450(40%boys, 60%girls). Total Classes running – 1 to 12. Alltogether 14 classes used for studying .Total no. of staffs – 17. School has 3 buildings out of 2 are made with Japanese Aid. All are fully damaged. Truss can be used though.Has water supply problemToilets are fully damaged. Furniture are also damaged in large number.Has bamboo and skilled manpower problem.12 temporary classes required to run school.No fund has been made available till now.
Cost of Building 8 Blocks Cost of Retrofitting
Yet to be finalized awaiting architects report
Retrofitti
ng
+ rebuilding
Shree Shiladevi Madhyamik Vidhyalaya
Total no. of students – 301(boys – 35%, girls – 65%)Total no. of classes – 1 to 10. Total no. of rooms – 18. Land in the name of school.Korean group has made some sample truss classes but is incomplete. One of the Korean member has got injured.Toilets are also fully damaged
Cost of Building 8 Blocks Cost of Retrofitting
Awaiting Reports Awaiting Reports
Under scrutiny
Recent visit for raising awareness and support
ALL4NEPAL.org
With the donations raised and between the RT Family members and global partners with RT Nepal the total amount raised and donated
through the account so far is nearly
€250,000.00
Empowering the future!