1
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
AGNICO-EAGLE MINES
CHESTERFIELD INLET
MEADOWBANK
SHIPPING PROGRAM 2007
2
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
MEADOWBANK LOCATION
N U N A V U T
CHESTERFIELD CHESTERFIELD
AIRPORTAIRPORT
ACCESSROAD
ACCESSROAD
AIRPORTAIRPORT
RANKIN INLETRANKIN INLET
BARGE/SHIPPINGACCESS
BARGE/SHIPPINGACCESS
Chesterfield Inlet
Chesterfield Inlet
Hudson Bay
SEASONALSHIPPING
SCHEDULEDAIR ROUTE
SEASONALSHIPPING
SCHEDULEDAIR ROUTE
0 50 Kilometres
0 50 Miles
MELIADINE WEST
MELIADINE EAST
To YellowknifeTo Yellowknife
To Winnipeg
To Winnipeg
BAKER LAKEBAKER LAKE
MEADOWBANKPROJECT
3
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
MEADOWBANK SITE PLAN
4
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007Meadowbank Project – Description
Mine Plan/Feasibility: General Arrangement Portage
0.5
km
0
N
5
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007Meadowbank Project - Description
Exploration Potential: Goose South Discovery
6
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
BAKER LAKE FACILITIES
7
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
EQUIPMENT REQUIRED FOR 2007
• 4 X 100 tons trucks
• 1 Grader
• 1 Loader
• 1 Dozer
• 8 Pick-up trucks
• 1 Ambulance
• 2 Cranes
• Concrete mixers
• Container handler
• Pumps
• Construction equipment
• Concrete plant
8
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
MATERIAL REQUIRED FOR 2007
• 4 600 tonnes of cement
• Reinforced steel
• 20 million litres of fuel
• Steel plate for fuel tank construction
• Wood for construction
• Mill building material
• Weather haven garage
• 72 dormitory modules
• Steel and plastic pipes
• etc.
9
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
2007 CONTRACTS
• Road
• Site preparation
• Tank Farm
• Concrete work
• Camp installation
• Mill Building Installation
10
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
ALL WHEATHER ROAD
11
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
BRIDGE
12
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
BRIDGE LAUNCHING
13
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
BAKER LAKE TANK FARM
14
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
MEADOWBANK MINE SITE
15
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
MEADOWBANK CAMP EXPANSION
16
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
MEADOWBANK SITE 2006
17
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
DORMITORIES BEING MANUFACTURED
18
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
DORMITORIES READY FOR TRANSPORT
19
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007
MATNATHANKS
QUESTIONS ?