ADMIRALTY INLET PILOT TIDAL PROJECT
Marine Aquatic Resource Committee May 19, 2014 1
![Page 2: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/2.jpg)
MARC Members As stated in the FERC License, the MARC is comprised of: • Snohomish PUD (District) • National Marine Fisheries Service (NMFS) • U.S. Fish and Wildlife Service (USFW) • Washington Department of Fish and Wildlife (WDFW) • Washington Department of Ecology (Ecology) • Washington Department of Natural Resources (DNR) • Tulalip Tribes • Suquamish Tribe • Swinomish Indian Tribal Community • Sauk-Suiattle Tribe Additional members may be added by unanimous agreement by the MARC.
2
![Page 3: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/3.jpg)
Purpose and Key Functions of MARC
• Purpose of MARC is to advise the District on aquatic resource issues related to construction, monitoring, and operation of the Project, including:
– Review results of project monitoring
– Review and comment on proposed changes to monitoring plans, as required and as necessary due to adaptive management triggers
3
![Page 4: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/4.jpg)
Establishment of MARC
• No separate license article establishing MARC
• FERC is “requiring implementation of monitoring plans, including the consultation and adaptive management requirements.”
• FERC lacks authority to require any entity to participate, but requires the District to document consultation with MARC entities on specific monitoring plans
4
![Page 5: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/5.jpg)
Adaptive Management Framework
• Purpose of meetings will be to review required consultation materials and discuss questions
• During project operation, MARC will review results of monitoring plan studies
• Group will follow the Adaptive Management Framework and seek to reach consensus when a vote is necessary; however some meetings will not require voting
5
![Page 6: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/6.jpg)
• Frequency of meetings will be determined by milestone events such as:
– Required consultation document is due
– Project monitoring results are compiled
– Monitoring plan changes are proposed
– Adaptive management trigger is initiated
6
Adaptive Management Framework
![Page 7: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/7.jpg)
MARC Consultation Requirements The FERC License requires consultation on any proposed changes to the following: • Acoustic Monitoring and Mitigation Plan (Article 404) • Benthic Habitat Monitoring and Mitigation Plan (Article
405) • Near-Turbine Monitoring and Mitigation Plan (Article 406) • Marine Mammal Monitoring and Mitigation Plan (Article
407) • Derelict Gear Monitoring Plan (Article 409) • In-water construction schedule (Article 410) In addition, development of the Project Removal and Site Restoration Plan is a condition of Ecology’s 401 WQC and requires MARC consultation.
7
![Page 8: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/8.jpg)
8
Project Installation Overview
![Page 9: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/9.jpg)
Project Implementation Partners
9
PCCE Supply Sub-Contractor
![Page 10: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/10.jpg)
REGIONAL MAP
10
![Page 11: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/11.jpg)
OVERVIEW MAP
Marine Cables
HDD
11
![Page 12: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/12.jpg)
TURBINE DEPLOYMENT SITE
12
![Page 13: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/13.jpg)
OVERVIEW MAP
Marine Cables
HDD
13
![Page 14: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/14.jpg)
ONSHORE DETAILS
OVERVIEW
1. TRANSFORMERS 2. POWER CONTROL &
CONDITIONING BLDG. (PCCB)
3. BATTERY STORAGE SYSTEM
4. GRID CONNECTION EQUIPMENT
5. CONCRETE FENCED YARD
LESS BUSY
TO G
RID
14
![Page 15: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/15.jpg)
15
Power Conditioning and Control Building
![Page 16: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/16.jpg)
16
HORIZONTAL DIRECTIONAL DRILLING (HDD)
• 600 lineal feet under the shoreline environment
• Minimum 2-6” diameter conduits
• 19-meters – requiring shallow dive support
• Avoids conflicts with sensitive near-shore habitat
![Page 17: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/17.jpg)
DETAILED MARINE OPERATIONS
• Marine Operations separated into 3-discrete operations with limited coordination requirements:
Cable Installation (Qty-2) – By PWC
Turbine Deployment (Qty-2) – By OpenHydro
Cable Connection (Qty-2) – By PWC
17
![Page 18: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/18.jpg)
Cable Installation - PWC
18
• Barge of opportunity PWC Leased Self powered or Z-Drive tug powered
• Equipment spread PWC Leased, owned or fabricated
equipment
Typical Cable Lay Vessel
![Page 19: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/19.jpg)
Cable Installation - PWC
19
START HERE
HDD
![Page 20: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/20.jpg)
20
Cable Installation 1. Surface laid cable 2. 24-HOUR OPERATION 3. Standby Tugs onsite for entire duration 4. ROV Monitors Cable Installation 5. 35,000# cable working strength
Cable Installation – By PWC
Subsea Cable Skid (SCS)
ROV Support Vessel Cable Lay Vessel
ROV
![Page 21: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/21.jpg)
Cable Installation – By PWC
21
Cable-Lay Vessel continues operation until it reaches Admiralty Bay. Vessel is arranged into a 4-point moor near the HDD exit E
W
Acoustic Release Buoy
Preset 4-Point Mooring Anchors
& Lines CALM WATERS OF
ADMIRALTY BAY
![Page 22: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/22.jpg)
22
E
W
Small Assist Vessel
Cable Buoy Float
Blue Line: End of Main Export Cable to Shore Red Line: Main Export Cable from Turbine
Cable Installation – By PWC
HDD Pull Head (HPH)
![Page 23: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/23.jpg)
23
E
W
Shore Cable 1. Assist Vessel Arrives at End of HDD near Shoreline
Cable Installation – By PWC
HDD CONDUIT
![Page 24: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/24.jpg)
Cable Installation – By PWC
24
Shore Cable 1. Assist Vessel Arrives at Shoreline 2. Dynamometer Monitors Tension on CLV 3. Diver Monitors Installation at Bellmouth
Small Assist Vessel
Floatation Buoy
HDD Pull Head (HPH)
Existing HDD Pipe With Bellmouth
Pull Line
19 m
![Page 25: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/25.jpg)
Cable Installation – By PWC
25
Shore Cable 1. Assist Vessel Removes Floatation Buoys as Needed 2. Diver Monitors Cable Catenary and Directs Cable through
the HDD
Trunk Cable
![Page 26: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/26.jpg)
26
Shore Cable 1. Cable End Loop is Maneuvered Out of the Pan & Chutes 2. Excess Cable in Bay is Being Pulled Through HDD 3. Floatation Buoys are Being Removed at HDD End
Final Cable “Loop”
Cable Installation – By PWC
![Page 27: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/27.jpg)
27
Shore Cable 1. Final Cable Loop is Lowered Over Cable Chute 2. Assist Vessels Continue Monitoring Installation
Cable Installation – By PWC
![Page 28: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/28.jpg)
28
Shore Cable 1. Floatation Buoys are Removed at Each End. 2. Cable Catenary is monitored by Diver & Assist Vessels
Cable Installation – By PWC
![Page 29: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/29.jpg)
29
Shore Cable 1. Cable is Installed on Seabed in Final Position 2. Remaining Buoys are Removed as Cable End is Pulled Through HDD 3. Diver Monitors Installation
Cable Installation – By PWC
![Page 30: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/30.jpg)
30
Shore Cable 1. Final Cable Position 2. Remaining Slack is Removed from Cable 3. Second Cable is a repeat performance
Cable Installation – By PWC
![Page 31: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/31.jpg)
Turbine Deployment By OpenHydro
31 “OpenHydro Installer” Barge
Tug
![Page 32: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/32.jpg)
Legend:
Umbilical Cable
Barge Winch Cable
Marker Buoy
OpenHydro Arrives on Station. Unit positioned over site & lowered.
OpenHydro Turbine Deployment
32
![Page 33: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/33.jpg)
Legend:
Umbilical Cable
Barge Winch Cable
Marker Buoy
Fine timing of positions using tug tow line & 2-drives. Direction of tide & flow is measured & monitored closely as assembly approaches sea floor.
33
OpenHydro Turbine Deployment
![Page 34: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/34.jpg)
Legend:
Umbilical Cable
Barge Winch Cable
Marker Buoy
On bottom – Confirmation of positions, ensure unit is level & feet have not sunk. Release of hydraulics.
34
OpenHydro Turbine Deployment
![Page 35: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/35.jpg)
Legend:
Umbilical Cable
Barge Winch
Marker Buoy
Recovery frame is now disconnected from the subsea base & raised back up to the barge.
35
OpenHydro Turbine Deployment
![Page 36: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/36.jpg)
Cable Connection By PWC
36
Cable Lay Vessel • Winch recovers each end • Performs system health check • Completes umbilical and cable connection
• Deploys connected in-line pressure vessel
Support Vessel • Operates ROV
• Monitors operations • Records final locations
Trunk Cable Umbilical Cable
![Page 37: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/37.jpg)
Arrival Onsite 1. Barge Arrives During Weakening Flood 2. ROV is Deployed to Recover Line from Main Export Cable End 3. Modified Construction Barge Station Keeps
Cable Connection – By PWC
37
Modified CLV or Construction Barge
ROV
Subsea Cable Skid (SCS)
![Page 38: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/38.jpg)
Cable Recovery 1. ROV Maneuvers Towards Construction Barge
Cable Connection – By PWC
38
![Page 39: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/39.jpg)
Cable Retrieval 1. Linear Cable Engine (LCE) Winches in Cable
End to the barge platform. 2. ROV Maneuvers Towards Subsea Base
Cable Connection – By PWC
39
![Page 40: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/40.jpg)
Cable Retrieval 1. LCE Secures Cable End Aboard the Barge 2. System Health Check is Performed on Main Export Cable 3. Subsea Skid Remains on Seafloor for Future Use
Cable Connection – By PWC
40
FIBER LOW POWER HIGH POWER
Remove Flange Cover Plate
Fiber Test Continuity Test
Megger Test
Secured to LCE
Bend Restrictor
![Page 41: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/41.jpg)
Cable Tail Line Retrieval 1. ROV Releases cable from Integrated Capture Device (ICD) 2. ROV Recovers a Tag Line from the Cable Platform
Cable Connection – By PWC
41
ICD
TUSP
ROV Platform
![Page 42: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/42.jpg)
Cable Tail Line Retrieval 1. Linear Cable Engine Winches Cable Tail Towards Barge 2. ROV Docks at Subsea Base & Monitors the Cable Recovery
Cable Connection – By PWC
42
Weakening Flood
![Page 43: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/43.jpg)
Cable Tail Line Retrieval 1. Cable Tail is Brought Aboard the Barge 2. System Health Check is Performed on Cable Tail
Cable Connection – By PWC
43
FIBER LOW POWER HIGH POWER
Remove Flange Cover Plate
Main Termination Bottle
Armor Termination
Bend Restrictor
Fiber Test Continuity Test
Megger Test
Secured to LCE
Slack water
![Page 44: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/44.jpg)
Cable Redeployment 1. Barge Begins Lowering Cable in “S” Pattern 2. ROV Monitors Cable Placement on the Seafloor
Cable Connection – By PWC
44
Completed IPV Connection w/Bending Radius Protection”
Developing Ebb
![Page 45: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/45.jpg)
Cable Connection – By PWC
45
Cable Redeployment 1. Connector Housing is Deployed on Seafloor 2. ROV Monitors Final Placement
Plan View of Installation
Developing Ebb
![Page 46: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/46.jpg)
Commissioning Effort
• Coordinated Effort
Turbine System
Battery Storage System
Grid Connection System
Supervisory Control and Data Acquisition
46
![Page 47: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/47.jpg)
Strobe
Hydrophone
ADCP
Camera
SeaEye Falcon ROV
Instrument Frame
Pilot-Scale Monitoring Objectives
Acoustic Characterization – turbine sound
Benthic Habitat – artificial reef
development, scour or sedimentation
around subsea base
Near-turbine – interactions between
aquatic species and turbine rotor
Marine Mammals – behavioral changes for
seals, harbor porpoise, and Southern
Resident killer whales in response to
turbine sound
Adaptive Monitoring Package (AMP)
47
![Page 48: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/48.jpg)
UNIVERSITY OF WASHINGTON RECOVERABLE AMP DEVELOPMENT
48 48
![Page 49: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/49.jpg)
Project Schedule Overview
49
![Page 50: ADMIRALTY INLET PILOT TIDAL PROJECT · construction, monitoring, and operation of the Project, including: –Review results of project monitoring –Review and comment on proposed](https://reader034.vdocuments.us/reader034/viewer/2022050503/5f9539126175d36f3055504a/html5/thumbnails/50.jpg)
Upcoming MARC Consultation Items **next meeting date TBD**
• Monitoring Objectives – Brian Polagye
• Monitoring Plan revisions
• In-water construction schedule
50