Accelerator Activities at SpainAccelerator Activities at Spain
MadridCIEMA
TCMAM
ValenciaIFIC
BilbaoESS
Barcelona ALBAUPC
SevillaCNA
1PAC-ILC May 2010
2
Accelerator Activities for Future Accelerator Activities for Future Linear Colliders Linear Colliders
PAC-ILC May 2010
Accelerator Activities for Future Accelerator Activities for Future Linear Colliders at SpainLinear Colliders at Spain
MadridCIEMA
TValencia
IFIC
Barcelona UPC
3PAC-ILC May 2010
Accelerator R&D for FLC at CIEMAT
PAC-ILC May 2010 4
Capabilities
3-D modelling of the magnet with its cryostat
Magnet during fabrication
MAGNETS and RF STRUCTURES:
- CALCULATIONElectromagnetic analysis
• Electric circuits & electronics
•Superconductivity
•High and low frequencyMechanical analysis
- PROTOTYPINGDesign: tooling, drawingsFabrication follow-upAssemblyTesting and Calibration
RF calculation for PETS
PAC-ILC May 2010 5
Main ongoing projects
ILC and its Accelerator Test Facilities:
ILC quadrupole package without BPM (Cos2 and super ferric) (DESY)
XFEL intersections: phase shifter (Including magnetic measurements), precision movers for quads, support base for the full intersection (DESY)
CLIC and its Test Facility CTF3:
Corrector magnets, septa, kickers for CTF3 (CERN)
Micro-movers for TBL quads (CERN)
PETS for the TBL in CTF3 and the 1st module of CLIC (CERN)
PAC-ILC May 2010 6
Fabrication of XFEL superferric quads
PAC-ILC May 2010 7
XFEL Intersections
Phase Shifter Prototype
Measurement bench 3D Model
Quadrupole mover with integrated
LVDT’s under tests
PAC-ILC May 2010 8
PETS structure assembly
PAC-ILC May 2010 9
Accelerator R&D for FLC at IFIC
PAC-ILC May 2010 10
11
Capabilities
- CALCULATIONBEAM DYNAMICS:
Electromagnetic analysis
• Electric circuits & electronicsMechanical analysis
Optics designNon-linear dynamics studiesNew instrumentation techniquesCommissioning
3-D modelling of BPM
- PROTOTYPINGDesign: tooling, drawingsFabrication follow-upAssemblyTesting and Calibration
BEAM INSTRUMENTATION :
Emittance simulations and measuremts in ATF
PAC-ILC May 2010
Main ongoing projects
ILC and its Test Facilities:
Beam dynamic studies and commissioning of ATF EXT line (LAL, KEK, SLAC)
Multi-OTR system for ATF2 (SLAC, KEK)
BPM supports with micromovers for FONT4 in (KEK, JAI)
BDS instrumentation studies
CLIC and its Test Facility CTF3:
BPM’s for the TBL in CTF3 (UPC, CERN, Applied Physics-UV)
Drive Beam BPM’s for the 1st CLIC module (CERN)
PAC-ILC May 2010 12
13
ILC and its Test Facility ATF-ATF2
Beam spot measurement with OTR1X
Focus adjusterslide
X and Y targetposition viewingadjusters
Mitutoyo 10X lensAnd 1x tube lens
90deg mirror
Newport Vertical mover
NewportHorizontal mover
Target inserter
Prosilica camera
OTR1X ATF2 EXT line
target
CCD camera
beam
New OTR design for muli-OTR system
Mover installed at ATF2
FONT4 movers
New OTR1 in the ATF2 EXT line
PAC-ILC May 2010 13
The CLIC and its Test Facility CTF3
Low-frequency wire set-up 3D view design
Control and DAQ equipment for all the setup signals
BPS for TBL at CTF3
Drive beam BPM for CLICPAC-ILC May 2010 14
Accelerator R&D for FLC at UPC
PAC-ILC May 2010 15
H
V
∆H∆V∑
Inductive pick-up
AFE: Analog Front-end Electronics
DIGITIZER
PAC-ILC May 2010 16
Main ongoing projectsThe BPS amplifiers for TBL of CTF3
Main ongoing projects
The balance for all this collaboration project has been very positive: New capabilities have been created in the Spanish institutes which are being
used for other facilities
Spanish companies having produced these devices for first time in our country are in position to participate in the industrialisation in a future
PAC-ILC May 2010 17
Future projects
The goal is to consolidate these contributions joining the effort of ILC for the EDR and CLIC for the CDR in a coordinated way:
ILC and its test facilities: HTc superconducting quads with indirect cooling for MLI, Dipole mode cavity BPM for ILC cryomodule, multi-OTR in ATF2 EXT line, micromovers for FONT4 in ATF2
CLIC and its test facilitiy CTF3: PETS for 1st CLIC module, BPMs for drive beam injector and Drive Beam Decelerator for the CLIC modules
PAC-ILC May 2010 18
19
Thanks to Fernando Toral and Thanks to Fernando Toral and the Ciemat Accelerator group the Ciemat Accelerator group for helping in the preparationfor helping in the preparation
Thanks for your attention Thanks for your attention
PAC-ILC May 2010