Accelerate Your Next AEM Project MAXIMIZING YOUR TIME & INVESTMENT WHEN ADDING A SECOND DOMAIN
JOHN JONES, SAS • MARK KELLEY, ICI DIGITAL
![Page 2: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/2.jpg)
ACCELERATE YOUR NEXT AEM PROJECT SAS & JMP Landscape
• SAS: $3B business analytics software firm
• SAS has adopted AEM as enterprise WCM
• SAS.com implemented AEM (Launch January 2014)
• JMP is a product and brand within SAS
• JMP is a customer of SAS IT team
• JMP.com needs to implement AEM
![Page 3: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/3.jpg)
ACCELERATE YOUR NEXT AEM PROJECT SAS & JMP Goals / Requirements
• Maximize investment in AEM
• Leverage existing AEM infrastructure and work product
• Re-use as much of existing design as possible
• Not interrupt SAS.com team velocity
• Meet budget, time, and resource constraints of JMP
• Launch JMP.com ahead of JMP 12 product launch
![Page 4: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/4.jpg)
ACCELERATE YOUR NEXT AEM PROJECT Eight Key Accelerators for JMP.com AEM Implementation
1. Clearly define your strategy for another domain
2. Reuse, refactor, then build new
3. Develop appropriate team structure between old and new
4. Maximize knowledge share
5. Change your business processes
6. Think creatively about business needs
7. Don’t skimp on quality
8. Enroll authors early in the process
![Page 5: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/5.jpg)
ACCELERATOR 1 Clearly Define Your Strategy
• Inventory applications, integrations, processes
• Three-week strategy phase critical to JMP success
• Technical, functional, and process perspectives
• Assessed current state, defined requirements,
mitigated risk, and created the reuse and
implementation strategy
Teams Involved JMP Marketing
JMP Online Team
SAS Digital Marketing
SAS IT / AEM SMEs
iCiDIGITAL AEM Consultants
![Page 6: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/6.jpg)
ACCELERATOR 2 Reuse, Refactor, Then Build New
• Reduce development time and energy by
eliminating redundancy
• Reduce overall development costs through
reuse and refactoring
• Spend budget on new functionality
![Page 7: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/7.jpg)
ACCELERATOR 3 Create Appropriate Team Structure Between Old and New
• SAS.com team already had velocity with AEM
• JMP.com considered a parallel vs. combined team
approach with SAS.com development team
• Chose a combined teams approach
• This is the approach that worked for us; your
mileage may vary
![Page 8: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/8.jpg)
ACCELERATOR 3 Create Appropriate Team Structure – Combined Teams
Pros of Combined Team JMP Development will benefit SAS.com and support.sas.com
Refactoring existing components will have reusability benefits
Combining SAS and iCi developers will leverage SAS.com and CQ expertise
Velocity can be shared or pooled
IT Developers will be cross-trained prior iCi resources disengage
Overall efficiencies in collaborative development and planning
Cons of Combined Team Backlog prioritization is a new process
Onboarding new contractors can impact velocity
Daily scrum and sprint planning may lengthen due to larger audience
Onboarding current developers to JMP can impact velocity
Scaling beyond SAS.com, JMP, Support is difficult** (Turned out not to be the case)
![Page 9: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/9.jpg)
ACCELERATOR 4 Maximize Knowledge Share
• SAS.com team already had AEM knowledge
• iCiDIGITAL team brought external AEM
expertise and experience from other projects
• Make sure functionality can be maintained after
the contractors leave
• AEM author training for JMP team
![Page 10: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/10.jpg)
ACCELERATOR 5 Change Your Business Processes
• Adopt and modernize business processes to AEM
• AEM can improve operational efficiency and user experience
• Example: JMP 30-day trial
![Page 11: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/11.jpg)
ACCELERATOR 6 Think Creatively to Satisfy Business Needs
• Think creatively about how existing templates and component can
be modified to suit your needs
• Collaborate with other AEM site owners and development about
needs and requirements that could be shared
![Page 12: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/12.jpg)
ACCELERATOR 7 Don’t Skimp on Quality
• QA is critical to success
• For SAS & JMP, QA became a bottleneck that slowed
project velocity
• Invested in QA resource to increase QA capacity
![Page 13: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/13.jpg)
ACCELERATOR 8 Enroll Authors Early in the Process
• Fosters adoption of AEM
• Authors provide insights about how AEM and
existing processes can be blended, modified, or created to improve publishing
• Utilize authors during migration
• Better trained authoring team at launch
![Page 14: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/14.jpg)
ACCELERATE AEM IMPLEMENTATIONS Eight Accelerators
1. Clearly define your strategy 2. Reuse, refactor, then build new 3. Develop appropriate team structure between old and new 4. Maximize knowledge share 5. Change your business processes 6. Think creatively about business needs 7. Don’t skimp on quality 8. Enroll authors early in the process
![Page 15: Accelerate Your Next AEM Project](https://reader033.vdocuments.us/reader033/viewer/2022060202/559bd8861a28ab41158b45e2/html5/thumbnails/15.jpg)
Accelerate Your Next AEM Project MAXIMIZING YOUR TIME & INVESTMENT WHEN ADDING A SECOND DOMAIN
JOHN JONES, SAS • MARK KELLEY, ICI DIGITAL