Download - Abutment (Fix End)

Transcript
  • 8/19/2019 Abutment (Fix End)

    1/2

    Consultancy Services for Preparation Plans, Design and Detailed Estimate for Construction of RIFLE 

    RANGE BRIDGE AT RD 55506m OF NAJAFGARH DRAIN 

    Design of Abutment for Canal Bridge

    RIFLE

    RANGE BRIDGE AT RD 55506m OF

    NAJAFGARH DRAIN

  • 8/19/2019 Abutment (Fix End)

    2/2

    Consultancy Services for Preparation Plans, Design and Detailed Estimate for Construction of RIFLE 

    RANGE BRIDGE AT RD 55506m OF NAJAFGARH DRAIN 

    Top Bottom

    A-1 211.6 203 209.62 209.62 208.12

    A-2 211.6 203 209.62 209.62 208.12

    Pier 

    DesignatiFRL GL

    Pier Cap

    Top Level

    Pile Cap Level


Top Related