Power Management for Industrial Plants.
IndustrialIT forPower EMS
![Page 2: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/2.jpg)
IndustrialIT for Power EMS
Electrical Process
System configuration
Functionality Power EMS
References
Benefits
![Page 3: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/3.jpg)
AB
B b
v -
3
Critical Loads
Limited In-plant Generation
Insufficient reliability of Public Grid
Why Power EMS?
Load Shedding}Several Generators
Contracted Power ImportationPower Control}
Different Electrical Operational
Configurations possibleMode Control}
Complex Distribution Networks
“Local only” Control facilitiesSCADA}
![Page 4: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/4.jpg)
AB
B b
v -
4
Why ABB Power EMS?
Deep knowledge of the electrical process 15 years experience in Power EMS in many projects
(green-field and running plants) Standard software, well documented, tested, proven technology Fast Response Time for Load Shedding, Mode Control, Power
Control, Re-acceleration High Resolution and Accuracy of
Sequence of Event recording Comply to class 3 EMC immunity Single responsibility: One supplier for Power EMS integrated with
protection, governor, excitation, tapchanger, Motor Control Centre, Variable Speed Drive, etc.
![Page 5: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/5.jpg)
AB
B b
v -
5
M MMM M MMM MMM M MM MM M MMM
M MMM
G G
M MM M
G G
M MM M
6 kV
GGG GGG
MM
33 kV
A B B T r a n s m i t O yN e t w o r k P a r t n e r
FE E D E R TE R M IN A L R E F5 4 1A B B N e t w o r k P a r t n e r
U a ux = 80 .. .2 65 Vd c / ac
fn = 50 H z
In = 1 /5 A (I)
1 M RS xxxxxx
9 8 15 0U n = 10 0 /1 1 0 V (U )
U on = 1 0 0 /1 1 0 V (U o )
Ion = 1 / 5 A (Io )
9 50 9
A B B T r a n s m i t O yN e t w o r k P a r t n e r
FE E D E R TE R M IN A L R E F5 4 1A B B N e t w o r k P a r t n e r
U a ux = 80 .. .2 65 Vd c / ac
fn = 50 H z
In = 1 /5 A (I)
1 M RS xxxxxx
9 8 15 0U n = 10 0 /1 1 0 V (U )
U on = 1 0 0 /1 1 0 V (U o )
Ion = 1 / 5 A (Io )
9 50 9
A B B T r a n s m i t O yN e t w o r k P a r t n e r
FE E D E R TE R M IN A L R E F5 4 1A B B N e t w o r k P a r t n e r
U a ux = 80 .. .2 65 Vd c / ac
fn = 50 H z
In = 1 /5 A (I)
1 M RS xxxxxx
9 8 15 0U n = 10 0 /1 1 0 V (U )
U on = 1 0 0 /1 1 0 V (U o )
Ion = 1 / 5 A (Io )
9 50 9
A B B T r a n s m i t O yN e t w o r k P a r t n e r
FE E D E R TE R M IN A L R E F5 4 1A B B N e t w o r k P a r t n e r
U a ux = 80 .. .2 65 Vd c / ac
fn = 50 H z
In = 1 /5 A (I)
1 M RS xxxxxx
9 8 15 0U n = 10 0 /1 1 0 V (U )
U on = 1 0 0 /1 1 0 V (U o )
Ion = 1 / 5 A (Io )
9 50 9
A B B T r a n s m i t O yN e t w o r k P a r t n e r
FE E D E R TE R M IN A L R E F5 41A B B N e t w o r k P a r t n e r
U a ux = 80 .. .2 65 Vd c / ac
fn = 50 H z
In = 1 /5 A (I)
1 M RS xxxxxx
9 8 15 0U n = 10 0 /1 1 0 V (U )
U on = 1 0 0 /1 1 0 V (U o )
Ion = 1 / 5 A (Io )
9 50 9
G G G
400 V
Typical Electrical Network of Industries
![Page 6: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/6.jpg)
AB
B b
v -
6
Fast Functions are performed by Controllers: Load Shedding / Re-Acceleration / Re-Starting Power Control Mode Control
MCC
A B B T r a n s m i t O yN e t w o r k P a r t n e r
F E E D E R T E R M IN A L R E F 5 4 1A B B N e t w o r k P a r t n e r
U a u x = 8 0 . . .2 6 5 V d c / a c
fn = 5 0 H z
In = 1 /5 A ( I)
1 M R S x x x x x x
9 8 1 5 0U n = 1 0 0 / 1 1 0 V (U )
U o n = 1 0 0 /1 1 0 V ( U o )
Io n = 1 / 5 A ( Io )
9 5 0 9
A B B T r a n s m i t O yN e t w o r k P a r t n e r
F E E D E R T E R M IN A L R E F 5 4 1A B B N e t w o r k P a r t n e r
U a u x = 8 0 . . .2 6 5 V d c / a c
fn = 5 0 H z
In = 1 /5 A ( I)
1 M R S x x x x x x
9 8 1 5 0U n = 1 0 0 / 1 1 0 V (U )
U o n = 1 0 0 /1 1 0 V ( U o )
Io n = 1 / 5 A ( Io )
9 5 0 9
Substation N
S800 I/O
Serial links to AVR
Serial Links to Emergency Diesel Generator
Serial links to Governor
A B B T r a n s m i t O yN e t w o r k P a r t n e r
F E E D E R T E R M IN A L R E F 5 4 1A B B N e t w o r k P a r t n e r
U a u x = 8 0 . . .2 6 5 V d c / a c
fn = 5 0 H z
In = 1 /5 A ( I)
1 M R S x x x x x x
9 8 1 5 0U n = 1 0 0 / 1 1 0 V (U )
U o n = 1 0 0 /1 1 0 V ( U o )
Io n = 1 / 5 A ( Io )
9 5 0 9
A B B T r a n s m i t O yN e t w o r k P a r t n e r
F E E D E R T E R M IN A L R E F 5 4 1A B B N e t w o r k P a r t n e r
U a u x = 8 0 . . .2 6 5 V d c / a c
fn = 5 0 H z
In = 1 /5 A ( I)
1 M R S x x x x x x
9 8 1 5 0U n = 1 0 0 / 1 1 0 V (U )
U o n = 1 0 0 /1 1 0 V ( U o )
Io n = 1 / 5 A ( Io )
9 5 0 9
ACS 601
TCP/IP Network
X-terminals(Process DCS)
Power EMS System Overview
ControlIT
Substation 2Substation 1 Substation Z
OperateIT EngineeringIT
![Page 7: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/7.jpg)
AB
B b
v -
7
Functionality Power EMS
Load Shedding Active and Reactive Power Control Supervision, Control and Data Acquisition (SCADA) Mode Control Re-Acceleration / Re-Starting Synchronisation
![Page 8: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/8.jpg)
AB
B b
v -
8
Load Shedding
Functionality Power EMS
?
Without Load SheddingWith Load Shedding
![Page 9: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/9.jpg)
AB
B b
v -
9
Load Shedding: The types
Fast Load Shedding on Loss of Power Resources Load Shedding on Frequency Drop Slow Load Shedding on Overload Slow Load Shedding for Peak Shaving Manual Load Shedding
![Page 10: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/10.jpg)
AB
B b
v -
10
Power EMS Load Shedding: Keywords
Fast Exact Flexible Co-ordinated Deterministic Security and Reliability Accurate Event Logging Operator Guidance Independent Back-up System
![Page 11: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/11.jpg)
Display Load Shedding Control
![Page 12: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/12.jpg)
AB
B b
v -
12
Display Load Shedding Islands
![Page 13: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/13.jpg)
Display Load Shedding Overview
![Page 14: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/14.jpg)
AB
B b
v -
14
Functionality Power EMS
Load Shedding Active and Reactive Power Control
MinimumExcitation
Rotor Instability Line
OperatingMinimum
Turbine Maximum
P
Q-LagQ-Lead
Maximum Excitation(Rotor Heating)
MVA-circle(Stator Heating)
MinimumPF-Leading
MinimumPF-lagging
Display Generator Capability Diagram
![Page 15: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/15.jpg)
AB
B b
v -
15
Display Calculated Control Margins
![Page 16: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/16.jpg)
AB
B b
v -
16
P
Q-LagQ-Lead
Active and Reactive Power Control
Active Power Sharing: Efficient Power Generation
Power Exchange optimization (Power Demand Control)
Avoid component overloading
Spinning reserve optimization
Standby optimization
Reactive Power Sharing: Achieve stable operation
Power Factor optimization
![Page 17: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/17.jpg)
Display Generator Capability DiagramOverview of the control mode of the turbine/generator unit
Overview of the control mode of the turbine
Overview of the control mode of the generator
Overview of the measurements and the setpoints
Overview of the operation of the network
Working point of the turbine and the generator
10 Dynamic keys for operator control
Setpoint to the turbine and the generator
![Page 18: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/18.jpg)
AB
B b
v -
18
Display Grid Capability Diagram
![Page 19: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/19.jpg)
AB
B b
v -
19
Display Maximum Demand Monitoring
![Page 20: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/20.jpg)
AB
B b
v -
20
Display Monitoring Tie-line
![Page 21: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/21.jpg)
AB
B b
v -
21
Display Mark V Vibration
![Page 22: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/22.jpg)
AB
B b
v -
22
Display Mark V Gas Turbine Generator Overview
![Page 23: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/23.jpg)
AB
B b
v -
23
Functionality Power EMS
Load Shedding Active and Reactive Power Control Mode Control
for Generators for Turbines for Transformers for Switchboards
Mode Control
![Page 24: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/24.jpg)
AB
B b
v -
24
![Page 25: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/25.jpg)
AB
B b
v -
25
Functionality Power EMS
Load Shedding Active and Reactive Power Control Mode Control Supervision, Control and Data Acquisition
Clearly Structured Presentation Controls - Select Before Execute Status Indications Consistency Analysis Time Tagged Events (1 ms resolution) Alarmhandling, Reports, Trends Supervision and Self Diagnostics Single Window concept
Supervision, Control and Data Acquisition
![Page 26: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/26.jpg)
AB
B b
v -
26
Integration with supervisory systems
Plant Information Systems - MIS Regional Dispatch Centres Power Generation Co-ordination Centres Energy Trading Utility Management Systems Process DCS
![Page 27: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/27.jpg)
AB
B b
v -
27
Integration with subordinated systems
Satellite Time Receiver (GPS) Alarm annunciators SF-6 Density Monitoring Units Motor Control Centres Battery Chargers Meteorological Stations Diesel Generators Generator- and turbine controller Protection and Control Units
![Page 28: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/28.jpg)
AB
B b
v -
28
A B B T r a n s m i t O yN e t w o r k P a r t n e r
F E E D E R T E R M IN A L R E F 5 4 1A B B N e t w o r k P a r t n e r
U a ux = 80 . . .2 65 Vd c / ac
fn = 5 0 H z
In = 1 /5 A ( I)
1 M R S xx x x x x
9 8 1 5 0U n = 1 0 0 /1 1 0 V (U )
U o n = 1 0 0 /1 1 0 V (U o )
Io n = 1 / 5 A ( Io )
9 5 0 9
CB SPRING READY
CB TRUCK OUT
TEMPERATURE HIGH
SF 6 GAS DENSITY
LOADSHEDDED
Measured Values
IL1 Amps 800IL2 Amps 803IL3 Amps 801Io 0Iob 0U12 kV 20U23 kV 20U31 kV 20U1 kV 11.5U2 kV 11.5U3 kV 11.5Uo - Volts 0
Use Up and Down to scroll view
Events
NOC3Low: E399-07-06 18:34:23:230
NOC3Low: E299-07-06 14:25:52:720
CB-HCU2: Opened99-07-06 14:02:48:430
Use C-button to clear Events
Measuring of U,I,E, calculation of P & Q
Monitoring & Control Interlockings Alarm annunciation Event Time Tagging Disturbance Recording Local storage of trip-events
Serial communication to Power EMS
Integrated Protection & Control Units
Protection
![Page 29: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/29.jpg)
AB
B b
v -
29
Functionality Power EMS
Load Shedding Active and Reactive Power Control Mode Control Supervision, Control and Data Acquisition (SCADA) Re-Acceleration / Re-Starting
Re-Starting
Triggered by Load Shedding or Undervoltage Individual motors Priority per motor Max. allowed time delay per motor Network configuration check Network restoration
![Page 30: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/30.jpg)
AB
B b
v -
30
Functionality Power EMS
Load Shedding Active and Reactive Power Control Mode Control Supervision, Control and Data Acquisition (SCADA) Re-Acceleration / Re-Starting Synchronisation
Automatic Synchronisation after boiler trip Automatic Synchronisation initiated by operator Semi Automatic Synchronisation Manual Synchronisation
Synchronisation
![Page 31: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/31.jpg)
AB
B b
v -
31
Display Synchronisation
![Page 32: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/32.jpg)
AB
B b
v -
32
Display Synchronisation
![Page 33: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/33.jpg)
AB
B b
v -
33
Functionality Power EMS
Load Shedding Active and Reactive Power Control Mode Control Supervision, Control and Data Acquisition (SCADA) Re-Starting Synchronisation Circuitbreaker Control Transformer Control Motor Control Generator Control Network Configuration Determination
![Page 34: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/34.jpg)
AB
B b
v -
34
References
HAR, refinery in Greece
Shell Pernis refinery in the Netherlands
Shell BLNG in Brunei
Shell PDO in Oman
Hoogovens, steel-industry in the Netherlands
ThaiOil, ThaiLube, RRC refineries in Thailand
La Roche, CHP in UK
Petrobras: REPAR, REDUC, RLAM refineries in Brazil
Reliance: Hazira, Jamnagar & Haldia refineries in India
AFPC, Omar refinery in Syria
MLNG Satu, Dua & Tiga in Malaysia
StatOil Gullfaks & BP Amoco Valhall in Norway
![Page 35: ABB bv - 1 6-11-2001 Power Management for Industrial Plants. Industrial IT for Power EMS](https://reader030.vdocuments.us/reader030/viewer/2022020800/56649d895503460f94a6edef/html5/thumbnails/35.jpg)
AB
B b
v -
35
The total accumulated switched-off shortcurrents by a circuitbreaker or
the number of generator starts are a trigger for maintenanceNo need for big oversizing of primary equipment
In case of a shortage of electrical power, secure the available power to critical loads by
switching off the none important loads according to dynamic load tables
Optimizing the stability of the operation of the electrical generation- and distribution
network of an industryLimiting electrical import during peak time
and decreasing peak base chargeMaintaining a good Power Factor
The Human Machine Interfaces for all the electrical sub-systems can be integrated in
the Energy Management SystemSerial interfaces with protection & control units avoid spaghetti wiring & cable ducts
Power Control, Standby Optimization, n+1 Criteria, SCADA, etc. are performed by
the system and not anymore by the operators
A B B T r a n s m i t O yN e t w o r k P a r t n e r
F E E D E R T E R M IN A L R E F 5 4 1A B B N e t w o r k P a r t n e r
U a ux = 80 . . .2 65 Vd c / ac
fn = 5 0 H z
In = 1 /5 A ( I)
1 M R S xx x x x x
9 8 1 5 0U n = 1 0 0 /1 1 0 V (U )
U o n = 1 0 0 /1 1 0 V (U o )
Io n = 1 / 5 A ( Io )
9 5 0 9
And thus ABB Power EMS helps you to: Avoiding black-outs (up to 500 kUSD / hour)
Power Control including voltage control, frequency control, sharing power among generators and tie-line(s).
High Speed Consistency Load Shedding (< 100 ms.)
Decreasing electricity costs Peak-shaving Re-active Power Control & Sharing
? Minimizing operational costs Decreased number of operators Event driven maintenance Single Window concept
Lower investment costs Minimized cabling and engineerings Optimised network design