Transcript

Plainfield Logistics ParkOverview & Highlights

80-acre park located in Plainfield, Indiana

Premier southwest submarket of Indianapolis

Located off SR 267 (signalized intersection) with immediate access to I-70

10-minute drive-time to I-465

8-minute drive time to Indianapolis International Airport & FedEx Hub

Close proximity to large, skilled labor pool

10-year real estate tax abatement

Infrastructure complete

DanvilleDanville

ClaytonClayton

MonroviaMonrovia

MooresvilleMooresville

PlainfieldPlainfield

AvonAvon

BrownsburgBrownsburg

WhitestownWhitestown

IndianapolisIndianapolis

GreenwoodGreenwood

FranklinFranklin

www.plainfieldlogisticspark.com

Data Center Building80,000 SF Building in Plainfield Logistics Park

Luke Wessel, [email protected]

Grant Lindley, SIOR, [email protected]

Stephen [email protected]

PROPOSEDBUILDING III474,000 SF(918' x 520')

PROPOSEDBUILDING II203,000 SF(780' x 260')

I GNIDLIUBFS 082,981)'062 x '827(

DRIV

E-IN

DRIV

E-IN

DRIV

E-IN

NOITNETED

52'.PYT

50'

TYP.

60'

GNIKRAP OTUA 111

DRIV

E-IN

DRIV

E-IN

GNIKRAP RELIART 02

CR 8

25

SKCOD 11 SKCOD 01

.CA 30.3LECRAP CG

25 F

UTUR

E AU

TO P

ARKI

NG

SR 2

67.CA 25.1

LECRAP CG

50'

TYP.

60'

52'TYP.

10 DOCKS

140'

10 DOCKS

138 AUTO PARKING

DRIV

E-IN

24 F

UTUR

E AU

TOS

10 TRAILERS

DRIV

E-IN

55'

10 FUTURE TRAILERS

50'

TYP.

60'

54'TYP.

140'

140'

24 DOCKS

55'

129

AUTO

PAR

KING

31 AUTO PARKING

36 TRAILERS

36 FUTURE TRAILER PARKING

25 F

UTUR

E AU

TOS

60'

94 FUTUREAUTO PARKING

24 DOCKS

DETENTION

CAMBY ROAD

140'

PROPOSED DATA CENTER

80,000 SF

350'x250'

±8.74 ACRES

I-70

BERM

50' T

REE

PRES

ERVA

TION

ARE

A

60 AUTO PARKING

DRIVE-IN

2 DOCKS

Scale:Date:

North

Master Plan1" = 200'-0"12/10/20

(to scale on 11"x17" paper)

Plainfield Logistics ParkSR 267 & Camby Road

Plainfield, Indiana

Plainfield Logistics ParkProposed Data CenterPlainfield, Indiana

SITE DUE DILIGENCE COMPLETED + INFRASTRUCTURE COMPLETE

Phase I Environmental

Low natural disaster risk

Infrastructure ready by Q1 2021

Electricity feed – two dedicated 12.47 kV distribution circuits

20 MW capacity 18 – 24 months

Long-haul fiber with bandwidth to satisfy data center requirements

Close proximity to major fiber connection point/multiple networks

Zoning I-2 – data center permitted within classification

Outside storage permitted

Maximum building height 75 ft.

Parking 1/3000 SF of floor space

Monument signage

UTILITY PROVIDERS

Water: Town of Plainfield

Power: Duke Energy

Data: AT&T

Sewer: Town of Plainfield

Gas: Vectren

Cushman & WakefieldAmbrose Property Group

Economic Incentives (state and local level)

Data Center Sales Tax Exemption

Property tax offset

Investment and Job Creation

Duke Energy flexible rate options

Rider 58 / 5-year reduction up to 30%

Plainfield Data Center ReportClick here to view

certifiedbyverisite.com

Camby RdCamby Rd

PROPOSEDBUILDING III474,000 SF(918' x 520')

PROPOSEDBUILDING II203,000 SF(780' x 260')

I GNIDLIUBFS 082,981)'062 x '827(

DRIV

E-IN

DRIV

E-IN

DRIV

E-IN

NOITNETED

52'.PYT

50'

TYP.

60'

GNIKRAP OTUA 111

DRIV

E-IN

DRIV

E-IN

GNIKRAP RELIART 02

CR 8

25

SKCOD 11 SKCOD 01

.CA 30.3LECRAP CG

25 F

UTUR

E AU

TO P

ARKI

NG

SR 2

67

.CA 25.1LECRAP CG

50'

TYP.

60'

52'TYP.

10 DOCKS

140'

10 DOCKS

138 AUTO PARKING

DRIV

E-IN

24 F

UTUR

E AU

TOS

10 TRAILERS

DRIV

E-IN

55'

10 FUTURE TRAILERS

50'

TYP.

60'

54'TYP.

140'

140'

24 DOCKS

55'

129

AUTO

PAR

KING

31 AUTO PARKING

36 TRAILERS

36 FUTURE TRAILER PARKING

25 F

UTUR

E AU

TOS

60'

94 FUTUREAUTO PARKING

24 DOCKS

DETENTION

CAMBY ROAD

140'

PROPOSED DATA CENTER

80,000 SF

350'x250'

±8.74 ACRES

I-70

BERM

50' T

REE

PRES

ERVA

TION

ARE

A

60 AUTO PARKING

DRIVE-IN

2 DOCKS

Scale:Date:

North

Master Plan1" = 200'-0"12/10/20

(to scale on 11"x17" paper)

Plainfield Logistics ParkSR 267 & Camby Road

Plainfield, Indiana

Plainfield Advantage

+ Hendricks County Population: 167,009

+ Hendricks County has grown 60.4% since 2000

+ Dedicated programs to support a large, highly skilled workforce

+ Indianapolis Airport ranked Best Airport in North America for 7th consecutive year and features 2nd largest FedEx facility in the world

+ Indiana ranks #1 in Midwest and #5 in the nation as Best State for Business

+ Indiana ranks #1 in Midwest and #10 in the nation as Best Tax Climate

80,000 SF Data Center Building in Plainfield Logistics Park

1-day drive time

DanvilleDanville

ClaytonClayton

MonroviaMonrovia

MooresvilleMooresville

PlainfieldPlainfield

AvonAvon

BrownsburgBrownsburg

WhitestownWhitestown

IndianapolisIndianapolis

GreenwoodGreenwood

FranklinFranklinPark HighlightsPlainfield Logistics Park features flexible sites for build-to-suit opportunities, with up to 3 Class-A distribution buildings planned, totaling nearly 900,000 square feet, and a Verisite certified data center site. These modern, cross-dock and rear-load logistics facilities will range in size from 67,000 square feet to 474,000 square feet.

Plainfield offers easy access to the I-70, I-65 and I-74 distribution corridors, as well as the Indianapolis International Airport, which features the second largest FedEx facility in the world.

Site to Airport8-minute drive time6.4 miles

Site to I-46510-minute drive time8 miles

Site to Indianapolis20-minute drive time16.4 miles

Allison Transmission

Amazon

Balkamp

Becton Dickinson

CEVA

DHL

FedEx

Hartz Pet Products

Home Depot

Kohls

Medline

Niagra Water

PepesiCo

Pill Pack

Rolls-Royce

Sealy Posturpedic

Stitch Fix

Trane

UPS

Walmart

Whirlpool

Corporate Neighbors


Top Related