Transcript
Page 1: 600K HWO/SNUBBING UNITBALANCE POINT CONTROL BV Equipment Specification Sheet 600K HWO/SNUBBING UNIT Operational activities: • Removal and installation of all types of completion

BALANCE POINT CONTROL BVEquipment Specification Sheet

600K HWO/SNUBBING UNIT

Operational activities:• Removalandinstallationofalltypesofcompletionandcasing.• PackerSetting/milling.• Underbalanceoperations/Snubbing.• Milling/Drilling/Welldeepening/Casingdrilling.• WellCleanOut.• FishingOperations.• RemovalandInstallationsofLiners.• RemedialOperations.• WellHeadRe-configurations.• InstallationandremovalofESPPumpingSystems.

Advantages:• Highcapacity.• SmallFootprint.• Flexible.• Mobile.• ExcellentCost/Qualityratio.• Multi-functional.

Long Service record• The600kUnitiswidelyusedbySnubbingServiceCompanies

aroundtheworldandisfamousforitsreliabilityandmobility.

Operational area• AllEuropeanUnionCountriesandUSA.

(Othercountriesonrequest).

Transport• The600kcanbedisassembledineasytransportablesections

withaweightlessthan10t.

1/6

Page 2: 600K HWO/SNUBBING UNITBALANCE POINT CONTROL BV Equipment Specification Sheet 600K HWO/SNUBBING UNIT Operational activities: • Removal and installation of all types of completion

BALANCE POINT CONTROL BVEquipment Specification Sheet

BOP Change out & Well Head re-configurations• BalancePointControlhasdesignedspecialsupportframes

whichmakesitpossibletochangeoutBOP’sandperformmodificationstotheWellHeadwithoutdisassemblingthe600kUnit.ThesesystemsarealsoveryusefulduringWellHeadrepairsandre-configurations.

Custom Specific Solutions• AspartoftheJobplanning,aRig-UpConfigurationwillbe

selected,whichoptimizesoperationalperformance.Thiscustomerspecificapproachensuresoptimalresultsduringeachoperation.

Rig-Up Time1. TheRig-Uptimevariesbasedontheconfigurationandthe

typeofoperationbetween12and36hours.

Pipe Handling • The600kUnitisequippedwithaflexibleandreliablePipe

HandlingSystembasedontheGinPole-LayDownWinchprinciple.LargeflexibilityallowsvariablePipeDecklocations,easyhandlingofalltypesoftubularandchangingRig-Upconfigurationswithoutmodifications.

• TheGinPolecontainstwoCounterBalanceWinchesbothratedat1,5mTon.

2/6

Page 3: 600K HWO/SNUBBING UNITBALANCE POINT CONTROL BV Equipment Specification Sheet 600K HWO/SNUBBING UNIT Operational activities: • Removal and installation of all types of completion

BALANCE POINT CONTROL BVEquipment Specification Sheet

Figure1:600kUnit

BOP Change out & Well Head re-configurations• BalancePointControlhasdesignedspecialsupportframes

whichmakesitpossibletochangeoutBOP’sandperformmodificationstotheWellHeadwithoutdisassemblingthe600kUnit.ThesesystemsarealsoveryusefulduringWellHeadrepairsandre-configurations.

Auxiliary Equipment • Dependentfromthescopeofworkthefollowingequipmentmaybeneeded:

» DataAcquisitionSystem(DAS-System).» HydraulicPowerPack.» WellControlEquipment

(Blow-outpreventers,Flow-lines,Choke,etc.).» MudPump.» BOPRemoteControlUnit.» OfficeContainer.» ToolContainer.» GuyWireContainer.» Substructuresasperclientspecifications.

3/6

Page 4: 600K HWO/SNUBBING UNITBALANCE POINT CONTROL BV Equipment Specification Sheet 600K HWO/SNUBBING UNIT Operational activities: • Removal and installation of all types of completion

BALANCE POINT CONTROL BVEquipment Specification Sheet

   

   

600kSnubbinginUK(LiveWell) 600kHWOinGermany(DeadWell)

600kSnubbinginGermany(LiveWell) 600konagas-cavernredevelopmentproject

4/6

Page 5: 600K HWO/SNUBBING UNITBALANCE POINT CONTROL BV Equipment Specification Sheet 600K HWO/SNUBBING UNIT Operational activities: • Removal and installation of all types of completion

BALANCE POINT CONTROL BVEquipment Specification Sheet

 Figure3:600khandlingCasinginUK

5/6

Page 6: 600K HWO/SNUBBING UNITBALANCE POINT CONTROL BV Equipment Specification Sheet 600K HWO/SNUBBING UNIT Operational activities: • Removal and installation of all types of completion

BALANCE POINT CONTROL BVEquipment Specification Sheet

Figure4:600kincombinationwithCoiltubinginUK

 

6/6


Top Related