Download - 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C
![Page 1: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/1.jpg)
1
6th Regional Coordinators’ Meeting
ICP Asia Pacific Report13-22 September 2005
Washington, D.C.
![Page 2: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/2.jpg)
2
ICP Asia Pacific Recent Activities
Date Activity14-15 April TP training for Regional Office
18-19 April TP training for NSO, Philippines
20-22 April TP training for Hong Kong, Malaysia, Sri Lanka, Taipei, Thailand, Vietnam
27 April TP training for MSPI, India
23-24 May Fourth RAB meeting
13-15 June TP training for Brunei, Cambodia, Fiji, Indonesia, Lao PDR, Macao, Mongolia
![Page 3: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/3.jpg)
3
ICP Asia Pacific Recent Activities
Date Activity16-18 June TP training for Bhutan, Bangladesh,
India, Iran, Maldives, Nepal, Pakistan, Thailand
28 June – 2 July
Ring List Finalization Workshop
4-8 July DRW for Hong Kong, Philippines, Taipei, Vietnam
15-16 July TP training for NSC, Lao PDR
1-6 August Finalization Workshop for Non-household Consumption Items
![Page 4: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/4.jpg)
4
ICP Asia Pacific Recent Activities
Date Activity
8-12 August DRW for Bhutan, Fiji, Indonesia, Macao, Malaysia, Maldives, Mongolia, Sri Lanka
15 – 17 August TP training for BTEI, Thailand
29 August – 2 September
DRW for Bangladesh, Brunei, Cambodia, China, India, Iran, Lao PDR, Nepal, Thailand
![Page 5: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/5.jpg)
5
Other ICP Asia Pacific Activities2005
Date Activity
28 September – 5 October
DRW for 2nd Quarter data
October Training for domestic experts for construction & equipment
October Poverty Workshop
November DRW for 3rd Quarter data
![Page 6: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/6.jpg)
6
Status of Price Surveysin the Asia Pacific
Region
![Page 7: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/7.jpg)
7
Status of Price Surveys
• All 23 participating countries have started their surveys as of April 2005, however, two countries did not conduct first quarter surveys
• Four countries surveyed only Food, Clothing & Footwear items in the first quarter surveys
• Twenty one countries have submitted their first quarter average prices to the RO, but one country did not submit raw price data
![Page 8: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/8.jpg)
8
Status of Price Surveys
• As of July, 22 countries have surveyed the full HH consumption basket
• Six countries survey urban areas only
• Seventeen countries will submit prices with urban/rural dimension
![Page 9: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/9.jpg)
9
Data Review Workshops
![Page 10: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/10.jpg)
10
Data Review Workshops Held
Date Participating Countries4-8 July Hong Kong, China; Philippines;
Taipei,China; Vietnam
8-12 August Bhutan; Fiji; Indonesia; Macao, China; Malaysia; Mongolia; Sri Lanka
29 August – 2 September
Bangladesh, Cambodia, People’s Republic of China, India, Lao PDR, Nepal, Thailand, Brunei, Iran
![Page 11: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/11.jpg)
11
Data Validation Procedures for Countries
• To ensure reliability & accuracy of price data RO prepared the following:
“Data Validation Procedure for Countries”
Automated intra-country data validation procedure
![Page 12: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/12.jpg)
12
Issues Identified during the DRWs
• Priced product does not meet product specifications in the product list
• A mixture of high & low quality products were priced, when no brand is specified
• Some price quotations were collected from high-end outlets
• Different interpretations in the UOM, especially where UOM is “count”
• Mismatch in preferred quantities in TP & the product list
![Page 13: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/13.jpg)
13
Issues Identified during the DRWs
• Divergence in the converted prices in PCM & BUU for data entry due to non-matching of preferred quantities in TP & the product list
• Data entry errors• Errors in conversion of units• Treatment of free services; e.g. service fee
for ATM withdrawals• Difficulty in formulating product
specifications for some products; e.g. ladies’ handbags, leather wallet & watches
![Page 14: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/14.jpg)
14
Decisions taken to address DRW issues
• Countries requested to review their data
• Recommendation for a methodology for computing electricity & water rates
• Preparation of a table on UOMs & quantities to guide countries in price data collection
• Revisions & improvement in the product list
![Page 15: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/15.jpg)
15
Decisions taken to address DRW issues-Revisions in the Product List
Number of items
Expanded products 6
Products with changes/modifications in the product specifications
17
Products with clarifications in the product specifications
158
Products without any changes 468
Total no. of products in the original product list 651
New products created from 6 expanded products 13
Deleted products 4
Total no. of products in the revised product list 660
![Page 16: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/16.jpg)
16
Status of GDP Expenditure Weights
![Page 17: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/17.jpg)
17
GDP Weights Estimation
• Nineteen countries have submitted GDP weights
• Reference year ranges from 2002 to 2004
• One country opted to participate only in the household consumption comparison
![Page 18: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/18.jpg)
18
Estimation & Extrapolation Concerns
![Page 19: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/19.jpg)
19
Estimation & Extrapolation Concerns
• How to estimate annual average prices for countries without first quarter surveys
• How to adjust construction & equipment prices to 2005 levels if price surveys will be conducted in 2006
• How to extrapolate GDP weights to 2005 levels
![Page 20: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/20.jpg)
20
Major Agreements of the RAB
![Page 21: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/21.jpg)
21
RAB Agreements
• DRWs are top priority & minimum of 2 workshops should be conducted
• Suggested that raw price data in TP be available in Excel format aside from XML
• Countries need domestic experts for price surveys on construction & equipment
• Confidentiality policy of the countries will be honored in respect of data access
![Page 22: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/22.jpg)
22
Funding Issues
![Page 23: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/23.jpg)
23
Funding Situation/Issues
• GO provided funds for ring list workshop; DRWs; finalization of non-household list.
• Significant funding is required for the ff:Data Review Workshops (DRWs)Consultants for construction;
equipment & machinery• RO is requesting for funding from the GO
for the construction & equipment sectors
![Page 24: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/24.jpg)
24
Advocacy Activities
![Page 25: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/25.jpg)
25
Advocacy Activities
• Participating countries found the ICP brochures prepared by the GO to be useful in explaining the uses of PPPs in their countries
• UN SIAP has invited the ICP Asia Pacific RO as resource person on the ICP in the “First Regional Course on Price Statistics and Introduction to ICP” in Maldives on 26-30 September
![Page 26: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/26.jpg)
26
Other Household Consumption Product
List
![Page 27: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/27.jpg)
27
Health & Pharmaceuticals
• Six pharmaceutical products were proposed to be deleted:
Fluphenazine Decaonate
Pyrimethamine with suldoxineZidovudineIndinavirNevirapineArtesunate
• Two paramedical services were proposed to be deleted:Assistant nurse home visit lAssistant nurse home visit ll
• Need to specify if “paramedical services” is rendered by private or health sector
![Page 28: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/28.jpg)
28
Education
• Reference PPPs will be utilized for public education• Education Services PSs to be developed only for
private educationPre-primary & primary educationSecondary educationTertiary education (computer science)Tertiary education (excluding first degree in
computer science)Foreign language coursePrivate lessons in mathematics (outside
school hours)Music course or lessons
![Page 29: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/29.jpg)
29
Ring List Workshop
![Page 30: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/30.jpg)
30
Total Number of Revised/Deleted Items from the Ring ListShop Items Non-Shop Items
GOList Revised Deleted
GOList Revised Deleted
Clothing 127 41 24 Catering 77 5 17
Food 407 164 95 Communication 38 5 6
Footwear 28 6 1 Dwelling 66 14 37
Furniture 175 64 34 Other goods & services
74 4 1
Recreation 131 56 18 Services for routine HH maintenance
6 1 4
Transportation 149 27 52
Total 868 331 172 Total 410 56 117
![Page 31: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/31.jpg)
31
Thank you
![Page 32: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/32.jpg)
32
Example of an Expanded Product
Shirt, business men’s (50-100% cotton)
Original Product expanded to include 2 new products
Shirt, business men’s (50-80% cotton)
Additional product
Shirt, business men’s (above 80% cotton)
Additional product
back
![Page 33: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/33.jpg)
33
Product with Changes/Modifications in Product Specifications
back
Original Specs New SpecsCoconut — young (green)
Processing: Fresh chunks, pieces, sliced
Type: Coconut Young (Green), with husk and shellProcessing: None
Moving and freight charge combination
Weight: Over 1000 kg–5000 kg Type of Freight: Freight by any means Distance: 100–500 km
Weight: 2500 kgType of Freight: Freight by road, using truckDistance: 300 kmCondition of Road: Good
![Page 34: 6 th Regional Coordinators’ Meeting ICP Asia Pacific Report 13-22 September 2005 Washington, D.C](https://reader035.vdocuments.us/reader035/viewer/2022062409/568149ed550346895db71ccd/html5/thumbnails/34.jpg)
34
Product with Clarifications in Product Specifications
back
Product Clarification in PS
Dried shrimp Dried shrimp with shell, head & tail; body length 1.5 -2 cm
Oranges 5 pieces per kg, yellow or green, local