Download - 5th Generation Fighter Test Construction
![Page 1: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/1.jpg)
1
5th Generation Fighter Test Construction
Systems-of-Systems Engineering Workshop
Maj Gen Matt “Zap” MolloyCommander, Air Force Operational Test and Evaluation Center
Albuquerque, NM
![Page 2: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/2.jpg)
2
• AFOTEC Mission…Background
• Designing a 5th Gen “Systems-of-Systems” F-35 Fighter Test …it’s Complicated!
• Local Area Test Activities
• Closing Thoughts & Discussion
Overview
![Page 3: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/3.jpg)
3
Test and Evaluate
New Capabilities in
Operationally
Realistic
Environments to
Inform Warfighters
and Influence
National Resource
Decisions
Mission
![Page 4: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/4.jpg)
4
AFOTEC Locations
AFOTEC Headquarters
Operating Location
Kelly Field, TX
Detachment 1
Joint Strike Fighter
Program Office
Arlington, VA
Detachment 2
Detachment 4
Space and Missile
Systems Center
Los Angeles AFB, CA
Detachment 5
Operating Location
Everett, WA
Operating Location
Hurlburt Field, FL
Operating Location
Buckley AFB, CO
Operating Location
Marietta, GA
Operating Location (OL) - Test
Detachment (Det)
Liaison Officer (LNO)
Headquarters (HQ)
Operating Location
Nellis AFB, NV
Detachment 6
![Page 5: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/5.jpg)
5
Today’s AFOTEC
AFOTEC Headquarters
Operating Location
Kelly Field, TX
Detachment 1
Joint Strike Fighter
Program Office
Arlington, VA
Detachment 2
Detachment 4
Space and Missile
Systems Center
Los Angeles AFB, CA
Detachment 5
Operating Location
Everett, WA
Operating Location
Hurlburt Field, FL
Detachment 6
Operating Location
Nellis AFB, NV
Operating Location
Buckley AFB, CO
Operating Location
Marietta, GA
Operating Location (OL) - Test
Detachment (Det)
Liaison Officer (LNO)
Headquarters (HQ)
McConnell AFB, KS
(OL-MK)
Hill AFB, UT
(OL-HU)
![Page 6: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/6.jpg)
6
TESTING 5TH GENERATION FIGHTERS
ROUND 2: THE F-35
![Page 7: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/7.jpg)
7
What is a 5th Gen Aircraft?
![Page 8: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/8.jpg)
8
5th Gen Stealth….
![Page 9: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/9.jpg)
9
This is our Situation…“A2/AD”
![Page 10: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/10.jpg)
10
• Tactical Surprise Lost• Tracked, Locked and Shots Taken Upon• Mission Effectiveness Degraded and/or Lost
SOF
SOF
SOF
Legacy Aircraft in Anti-Access Environment …High Mission Risk
![Page 11: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/11.jpg)
11
• Stealth, Speed, Precision, Sensor Fusion, maneuverability
5th Gen operational schema:• Battlefield system-of-systems approach:• Integration/interdependencies:
• Space/ISR/Air Superiority/C2/Grnd/IAMD
SOF
SOF
SOF
Assymetric Advantage of 5th Gen
31
![Page 12: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/12.jpg)
12
S-o-S Testing Challenges
• Where do you draw the test boundaries on a SoS
weapons system?– Fifth-generation platforms are redefining classical boundaries as
systems evolve from cooperative…to integrated…to interdependent
• How do you appropriately measure “Suitability”,
“Effectiveness” and “Mission Capability” in a System-
of-System weapons platform?– If the autonomic Logistics Information System is compromised can
the F-35 be Suitable and Mission Capable in the operational
environment?
![Page 13: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/13.jpg)
13
F-35 as a System-of-Systems
Fusion and SOS
Integration
EWMore Capability at1/2 the Cost -Digital Modules,Production Processes, Apertures
DAS
Demonstrated
Significant Contributions
to Situation Awareness
Weapons
Finalized Carriage Concepts
Support All Weapons
CNI
Critical H/W Elements and
S/W Reuse Demonstrated
Mission Support
Finalized Carriage Concepts
Support All Weapons
EOTS
Low Profile Window
Optimized for Visibility &
Configuration Integration
Radar
Half the Weight,
Half the Cost Goal
Being Realized
ICP
COTS Technology Refresh Demonstrated
Common
Components
Economy of Scale Savings
CockpitProjection
Display Technology for
Enlarged Screen Area
and Availability
Open Architecture / Software
Standard Interfaces, Loose
Coupling, Object Oriented
Design, Commercial Tools
for Simpler Integration
Figure 2.1.x-x Display Portal concept w/ Virtual HUD Image
Figure 2.1.x-x Display Portal concept w/ Virtual HUD Image
![Page 14: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/14.jpg)
141/30/2017 Docs 55445
“A System-of-Systems-of-Systems”
CV
LH/LP
Air Base
PHM
Datalink
SATCOM
Beyond Line of Sight
JFAC
Joint Tactical Radio System (JTRS)
Functionality
Variable Message Format
VMF
Ground Forces
94 Information Exchange Requirements to Ensure Interoperability
Across US and Coalition Forces
JFAC
E-2
F/A-18
AWACs
JSTARS
Link -16
Aviation & Air Defense Assets
F-16
V-22
Blue SAMs
AEGIS
• Link 4/ACLS, ICLS
• Link 16
• LAN/WAN/Internet
• UHF/VHF Voice/Data
• SATCOM 2 Way Voice/Data
Autonomic Logistics
Information System
“ALIS” Global Supply Chain Mngmt
F-35 IOT&E:
We are pathfinders
for the art & science
of 3rd Offset Strategy
weapons systems
testing
![Page 15: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/15.jpg)
15
Human-Machine Collaboration
Network-Enabled, Cyber-Hardened Weapons
![Page 16: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/16.jpg)
16
![Page 17: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/17.jpg)
17
Constructing an F-35 Test
Understand:System Under Test
Operations
Battlespace Conditions
Test Design
Characterize, ID Problems, Thresholds
Scientific Test & Analysis Techniques
Measures
ResourcesOAR, M&S, Instrumentation, Assets, INFO!
ExecuteOperational realistic
Analyze/Evaluate
Report
What is to be tested?Mission Capability
Effectiveness and Suitability
Requirements Satisfied
Accurate,
Balanced,
Complete
Report
Adequate
Test
Operational
Sufficiency
Credibility
Technical
Adequacy
![Page 18: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/18.jpg)
18
F-35 Battlespace
Partner
with
User, OSD,
Academia
Are we trying to answer questions at the campaign, mission, engagement, etc. level … ?
or
Are we trying to build a complete enough operationally realistic environment for the F-35?
![Page 19: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/19.jpg)
19
F-35 Mission Areas
• Mission Areas, or “COIs”, i.e. what things are the key operational things
we expect the F-35 to do??
• Air to Surface Attack
• Close Air Support
• Air Warfare
• Electronic Attack
• Combat Search and Rescue
• Aerial Reconnaissance
• Suitability: Deployability, Fwd Basing; Sortie Generation; Training;
Logistics Support
Pre-planned - Air Interdiction, Strategic Attack,
OCA – Surface Attack
Un-Planned - Strike Coordination and
Reconnaissance, Armed Reconnaissance
Close Air Support (CAS) Forward
Air Controller (Airborne)
Offensive Counter Air (OCA); Defensive Counter Air (DCA)
Cruise Missile Defense (CMD)
Suppression of Enemy Air Defenses (SEAD)
Destruction of Enemy Air Defenses (DEAD)
Combat Search and Rescue (CSAR)
Tactical Recovery of Aircraft and Personnel
(TRAP) Assault Support Escort (ASE)
![Page 20: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/20.jpg)
20
Test Trial Design Point Target Clutter Priority Target Movement Cueing F-35 Variant Time of Day
1
1 High Stationary None F-35A Night
2 Low Stationary Real Time F-35A Night
3 Low Moving None F-35A Night
4 High Stationary Real Time F-35A Night
2
5 High Moving None F-35A Day
6 High Stationary Real Time F-35A Day
7 Low Stationary Real Time F-35A Day
8 Low Stationary None F-35A Day
3
9 High Stationary Real Time F-35B Night
10 Low Stationary None F-35B Night
11 High Stationary None F-35B Night
12 Low Moving Real Time F-35B Night
4
13 Low Stationary Real Time F-35C Day
14 Low Stationary None F-35C Day
15 High Moving Real Time F-35C Day
16 High Stationary None F-35C Day
5
17 Low Moving Real Time F-35B Day
18 High Stationary Real Time F-35B Day
19 Low Stationary None F-35B Day
20 High Stationary None F-35B Day
6
21 Low Stationary None F-35A Night
22 Low Stationary Real Time F-35A Night
23 High Moving None F-35A Night
24 High Stationary Real Time F-35A Night
7
25 High Stationary Real Time F-35C Night
26 Low Moving Real Time F-35C Night
27 Low Stationary None F-35C Night
28 High Stationary None F-35C Night
8
29 Low Stationary Real Time F-35B Day
30 High Moving None F-35B Day
31 High Stationary Real Time F-35B Day
32 Low Stationary None F-35B Day
F-35 Test Design
Partner
With
Academia
Partner
With
OSD
![Page 21: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/21.jpg)
21
Realistic Test Environment
Battlespace
Conditions
Build an
Operationally Realistic
Test EnvironmentTest Events
![Page 22: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/22.jpg)
22
Operationally Realistic Test Environment
Constructing an advanced
IADS Environment
![Page 23: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/23.jpg)
23
Constructing a Synthetic Realistic Threat
Constructing an advanced
IADS Environment
Radar Signal Emulators
(RSEs):Reprogrammable active, electronically
scanned arrays (AESA) open-loop
emitters capable of emulating the
signals of a wide variety of modern
threat radars including complex,
reactive, adaptive, and agile waveforms
![Page 24: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/24.jpg)
24
Constructing a Synthetic Realistic Threat
Constructing an advanced
IADS Environment
EWIIP: RSEs,
DIADS, AARI
& AWBS
![Page 25: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/25.jpg)
25
Constructing a Synthetic Realistic Threat
Constructing an advanced
IADS Environment
RSEs bring the
detect/ID/geolocate and tactical
employment challenges of
modern, mobile SAMS into OT
missions
Have we detected all the factor
threats?
Where are the:
-- Long-range SAMs?
-- Medium-range SAMs?
-- Short-range air defense
systems?
-- Non-shooter radars
What do I need to attrit or
suppress to get to the target
area?
Target/Objective
![Page 26: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/26.jpg)
26
RSEs at the Sea Test Range
Vandenbe
rg AFB
Santa
Cruz
Island
NAS
Point
Mugu
San
Nicolas
Island
San
Clemente
Island
Edwards
AFB
C2 infrastructure currently exists
C2 infrastructure enhancements
required
China Lake
ECRFt. Hunter
Liggett
![Page 27: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/27.jpg)
27
5th-Gen Testing Challenges
• F-22 Raptors & F-35 Lightnings have voracious
appetites; they chew through the adversary with
volume & velocity…– Very difficult to generate the threat density and complexity to meet
5th-gen operational test requirements Advanced SAMs, advanced adversary aircraft, and Digital Radio-
Frequency Memory (DRFM) Jamming
• Creating a complex, threat-dense environment is key
to an effective 5th-gen IOT&E and for accurately
quantifying operational risk– Limits to what can be accomplished in the air
• Open-air testing constraints– GPS jamming restrictions
– Full system employment constraints due to security/exploitation
concerns
• How do we crack this nut???
![Page 28: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/28.jpg)
28
5th Gen Modeling & Sim
• Creating this environment is key to an effective 5th gen
IOT&E– It allows us to fully “stress” the system under test
– Commensurate with the 3rd Offset Strategy way of thinking
• Creating an advanced modeling & simulation environment– There are tough challenges posed by 5th gen M&S:
Creating the virtual battlespace and how the stealthy air vehicle dynamically
interacts within it
Accurately modeling advanced threats
Inserting blue forces into the virtual battlespace
Introducing the Joint
Simulation Environment…
![Page 29: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/29.jpg)
29
“Pay It Forward”
• Joint Simulation Environment--or “JSE”--is the modeling
& simulation environment to support F-35 IOT&E
• Replaces the verification simulation (VSim) as the full
mission simulator
• Purpose: Take advantage of next gen M&S technology
for high fidelity F-35 3F testing
• Lead agency: DoN (NAVAIR), USAF (SIMAF) supporting
• Location: Pax River (initially)
VCSAF tasking: “Whatever the F-35 builds for
JSE it should be compatible with what the Air
Force needs to use in the future.”
- i.e. create standard interface & air domain envnmt
![Page 30: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/30.jpg)
30
What AFOTEC Envisions
• Gov’t owned cross platform, multi-domain, multi-security,
mission-level environment– Common, flexible environment, standardized testing/M&S
• “5th gen M&S Campus” co-located w/ Test, Advanced
Training/TTP Development at Nellis AFB– Primary target: F-35 Block 4 and F-22 Sensor Enhancement OT
– Secondary targets: F-15E IRST, F-15E EPAWSS, Adv Jammers
– Follow on targets: B-21, B-2, Penetrating counter-air
• Leverage F-35 investment in JSE Pax, extend to other
programs and domains
Provide a Government-owned capability to perform advanced modeling
and simulation support to Air Force assets
![Page 31: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/31.jpg)
31
AF 4th & 5th Gen Enterprise Vision
Future 5th Gen
Emissions (Jamming, Inadvertent)
Active (RF, Laser, etc.)
Communication
Combat Cloud
C2/AOC
DCGS
JSPOC
COP
5th to 4th
Interactions
EW, TAR, TTR, SAMS,
GCI, C2
C2/ISR & BMC2 Threat IADS
Weather
Multi-Spectral
Sensing &
Emissions
Current &
Future Threat
Air
Space & Counter Space
Airborne C2 & BMC2
Integrated
Sensing &
Communication
Architectures
Manned &
unmanned
(autonomy)
Kinetic & Non-Kinetic
Weapons/Effects
Access
Storage
TE Processing
Reach Back
Meta Correlation &
Fusion
“Other” source data
Cyber
Threat SpaceSpace
Air
CyberRed
Threats
C2/ISR
![Page 32: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/32.jpg)
32
Big, Really B-I-G Data
• Terabytes of data flow from F-35 OT&E sorties…same for the M&S environment, but with potentially
dozens of “runs for score” for one test event….
• Big data analytics/knowledge management is a growth
area for 5th Gen/3rd Offset Strategy weapons systems
![Page 33: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/33.jpg)
33
CLOSING THOUGHTS
AFOTEC local area test activities
![Page 34: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/34.jpg)
34
Questions & Comments
![Page 35: 5th Generation Fighter Test Construction](https://reader030.vdocuments.us/reader030/viewer/2022012813/61c43b51bc22d33b282a8e2e/html5/thumbnails/35.jpg)
35
Loyalty