5S ProjectISAIAH VILLALONBUSM 390R
![Page 2: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/2.jpg)
Activity
![Page 3: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/3.jpg)
Current Situation:
We currently spending about $1248 a year on Labor Cost alone in regular cleaning of the Recycling Center
There is a lot of unnecessary equipment and materials in the area.
No segregation of recycling materials
![Page 4: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/4.jpg)
Before Pictures
![Page 5: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/5.jpg)
![Page 6: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/6.jpg)
![Page 7: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/7.jpg)
![Page 8: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/8.jpg)
![Page 9: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/9.jpg)
After Pictures:
![Page 10: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/10.jpg)
![Page 11: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/11.jpg)
![Page 12: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/12.jpg)
![Page 13: 5S Project](https://reader036.vdocuments.us/reader036/viewer/2022081511/588923051a28ab77528b5967/html5/thumbnails/13.jpg)
New Situation:
Organized materials in proper location Removed equipment and other unnecessary materials Savings of $624 a year for Labor Cost Segregation of Recycling Materials with appropriate signs