Construction of Oil Terminal at Hamriyah Free Zone (EPC-1)
TAKREER PROJECT NO.:5638
MATERIAL REQUISITION
FOR
TRANSFORMER
A 16-02-2012 Issued for Review TYW LSS ZSH
Rev. Date Description/issued for By Ckd. Revd. Appd.
SIGNED (Initials)
QA/QC MANAGER
Client: ADNOC DISTRIBUTION / TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE (EPC-1)
Doc. No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No.:10-5638-E-1 Document:5638-E1-1500-ELC-MR-001 Rev: A Sheet: 1 of 29
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 2/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:2 of 29
TABLE OF CONTENTS
1.0 SCOPE OF SUPPLY (SOS) .................................................................................................. 3
1.1 MATERIAL TAKE-OFF / BILL OF QUANTITIES.................................................................... 3
1.2 MATERIAL DELIVERY REQUIREMENTS............................................................................. 4
2.0 DEFINITIONS ........................................................................................................................ 4
3.0 LANGUAGE ........................................................................................................................... 4
4.0 ENVIRONMENTAL CONDITION ........................................................................................... 4
5.0 SPECIFIC TECHNICAL REQUIREMENTS ........................................................................... 5
5.1 RECOMMENDED SPARES & SUBMISSION OF SPIR FORMS .......................................... 5
6.0 SUPPLIER DATA REQUIREMENTS .................................................................................... 6
6.1 SUBMISSION REQUIREMENTS ........................................................................................... 6
6.2 SDRL DOCUMENTS - GUIDANCE NOTES .......................................................................... 6
7.0 SUPPLIER QUALITY PROGRAMME REQUIREMENTS ..................................................... 9 7.1 GENERAL .............................................................................................................................. 9
7.2 INSPECTION AND TEST PLAN ............................................................................................ 9
7.3 GUIDANCE NOTES FOR THE PREPARATION OF THE INSPECTION AND TEST PLAN ......10
8.0 HEALTH, SAFETY AND ENVIRONMENT .......................................................................... 11
8.1 GENERAL ............................................................................................................................ 11
8.2 INFORMATION WITH BID ................................................................................................... 11
9.0 SHIPPING REQUIREMENTS .............................................................................................. 11
9.1 PACKING INSTRUCTIONS ................................................................................................. 11
9.2 AGREEMENT TO DELIVERY .............................................................................................. 13
10.0 TRAINING REQUIREMENTS ........................................................................................... 13
11.0 START-UP AND COMMISSIONING SUPPORT .............................................................. 13
11.1 OPERATIONS INSTRUCTION AND MAINTENANCE MANUAL ..................................... 13
11.2 START-UP AND COMMISSIONING SUPPORT .............................................................. 13
12.0 DOCUMENT NUMBERING PROCEDURE ...................................................................... 13
13.0 TECHNICAL SPECIFICATION, DATA SHEETS AND DRAWINGS ................................ 14
APPENDIX A: SUPPLIER DATA REQUIREMENT LIST - (SDRL) .......................................... 15
APPENDIX-B: SPARE PARTS AND INTERCHANGEABILITY RECORD
(SPIR) GUIDE FOR COMPLETION.................................................................. 21
APPENDIX-C: TEST AND INSPECTION DATA SHEET .......................................................... 27
APPENDIX-D: CHECKLIST ..................................................................................................... 29
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 3/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:3 of 29
1.0 SCOPE OF SUPPLY (SOS)
This requisition covers the scope of supply of Transformer to be used for the Construction
of Oil Terminal at Hamriyah Free Zone (EPC-1) Project.
The scope of supply includes the design, manufacture, fabrication, inspection, testing,
preparation for shipment and documentation requirements of the Transformer, inaccordance with the requirements of this Requisition and the attached Specifications, Data
Sheets and drawings.
1.1 MATERIAL TAKE-OFF / BILL OF QUANTITIES
SR.NO.
DESCRIPTION ITEM TAG
NO. QTY REMARKS
1
Distribution Transformers(include Neutral current
transformer), 1600 kVA, 6.6kV/0.433kV as per
Specification DGS-EE-003 and Datasheet 5638-E1-1500-ELC-DS-001.
1500-TR-003
1500-TR-004
1500-TR-0051500-TR-006
4 Ea
2 Spare Parts for Commissioning, Start-up 1 Lot
3Spare Parts list for 2 years of Normal Operation /Maintenance
1 Lot
4 Capital Spares 1 Lot
5 Special Maintenance Tools & Tackles if required 1 Lot
6Packing, Marking, preservation, and Shipment asspecified.
1 Lot
7 Inspection and Testing as specified 1 Lot
8Guarantees and Warrantees, for a period of twelve(12) month after commissioning or eighteen (18)month after shipping, whichever comes first
1 Lot
9 Documentation as per SDRL 1 Lot
10Supervision of installation, Start-up andcommissioning vendor support on a per diem basis.
1 Lot
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 4/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:4 of 29
1.2 MATERIAL DELIVERY REQUIREMENTS
The finished equipment and materials are to be delivered by the SUPPLIER to Mina Zayed
Port in Abu Dhabi, U.A.E.
The SUPPLIER shall be responsible for all handling and transportation between the place
of manufacture and the PURCHASER’s nominated delivery point.
2.0 DEFINITIONS
To match the definitions, as used in this Material Requisition and the attached documents
listed in Section 13, the following terminology shall be used:
COMPANY : Abu Dhabi Oil Refining Company (TAKREER)
PROJECT :Construction of Oil Terminal at HamriyahFree Zone (EPC-1)
PMC : WS ATKINS & Partners Overseas
CONTRACTOR :Sinopec International Petroleum ServiceCorporation
MANUFACTURER /FABRICATOR /SUPPLIER /VENDOR
:Party(s) which manufactures and / or suppliesthe equipment / services
must : signifies a legal or statutory requirement
shallsignifies a requirement made mandatory bythis Specification
may :signifies a feature which is discretionary in the
context in which it is applied
will :signifies a feature which the Supplier may assumeto be already present
should :used where a provision is preferred; a strongrecommendation
3.0 LANGUAGE
The governing language of the Contract shall be English language. All notices,
correspondence, information, literature, data, manuals and other documents required
under the Contract shall be in the English language.
4.0 ENVIRONMENTAL CONDITION
Unless stated otherwise, all the electrical equipment shall be suitable for the following
environmental conditions for installation and satisfactory operation on a continuous basis
without causing the harmful effects.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 5/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:5 of 29
Al ti tude
Less than 1000m above seal level
Ambient Temperature
Maximum: 58 °CMinimum: 5 °C
Maximum Solar: 87 °C
For design of outdoor/indoor electricalequipment (with no A/C):
For design of Electrical Equipment installed
54 °C
indoors in all substations with dual AirConditioning System: 40 °C
For design of Air Conditioning system: 48 °C
Relative Humidity
Maximum at 43 °C 95% Average at 54 °C 60 %
Wind
Maximum design wind velocity 160 km/h
Prevailing Wind Direction North West
Rainfall
Extremely rare, but flash flooding may occur. Measurable rainfall usually occurs in an
average of about 10 days per year, these being confined to winter and transitional
months only; however, showers during thunder storms and flash flooding are not
unknown.
Note:
Occurrence of internal condensation shall be considered in the design.
Atmosphere shall be regarded as dusty, sulphurous, saliferous and corrosive
as commonly encountered in petrochemical/refinery installations.
5.0 SPECIFIC TECHNICAL REQUIREMENTS
The Specifications, Data Sheet and Drawing, which covers the design, manufacture,
supply, inspection, testing, factory acceptance test, certification, packing, supervision of
installation and commissioning of Transformer, are listed in Section 13 of this requisition.
5.1 RECOMMENDED SPARES & SUBMISSION OF SPIR FORMS
i. SUPPLIER shall separately list and quote for recommended spares for a 2 normal
years operation/ maintenance.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 6/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:6 of 29
ii. Blank SPIR (Spare Part Interchangeability Record) forms as enclosed in Appendix B
SHALL be filled in and returned with the offer. Failure to do so would make the offer
"INCOMPLETE & LIABLE FOR REJECTION".
iii. SUPPLIER shall "CONFIRM AND WARRANT THE SUPPLY OF THE
RECOMMENDED SPARES FOR AT LEAST 10 YEARS FROM THE DATE OF
PURCHASE".
iv. Submission of filled SPIR forms with the quantities and prices do not constitute as an
order commitment.
6.0 SUPPLIER DATA REQUIREMENTS
The SUPPLIER Data Requirements are detailed in the Supplier Data Requirements List
(SDRL). The SDRL is provided as Appendix-A to this Technical Requisition.
6.1 SUBMISSION REQUIREMENTS
The number of prints required for each document, and submission period, are listed on the
SDRL.
All SUPPLIER drawings and data shall be submitted under cover of a transmittal sheet
bearing the enquiry or purchase order number indicating the applicable SDRL code.
SUPPLIER drawings and data, where relevant, shall be submitted in size A4, A3 and A1
paper only. All drawings and data shall be fully legible and in the English language.
One copy of the SUPPLIER’s drawings and data submitted for review shall be returned to
the SUPPLIER within Fifteen (15) working days of receipt by the PURCHASER.
Drawings and documents returned to the SUPPLIER with comments shall be re-submittedto the PURCHASER incorporating said comments within Ten (10) working days of receipt.
Operation and Maintenance Manuals (SDRL code J01) and Manufacturing Record Book
(SDRL code K01) where requested shall be supplied in A4 size hard backed ring binders
for the review and acceptance of the PURCHASER. One copy shall be submitted within
the time specified in the Suppliers Data Requirements List. Upon acceptance by the
PURCHASER six final copies and one reproducible shall be provided by the SUPPLIER
incorporating the PURCHASER’S comments.
6.2 SDRL DOCUMENTS - GUIDANCE NOTES
The following notes are included as guidance to those items in the SDRL which may
require some clarification. Not all items are included here as most are self-explanatory in
the SDRL.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 7/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:7 of 29
A.01 Suppl ier Document Register
Completed to show listing by category and by title of all documents to be
submitted by the SUPPLIER to meet the data requirements of this SDRL. List to
include SUPPLIER's own document numbers and PURCHASER’S requirements
for numbering of documents and date of submittal.
A.02 Fabrication/Production Schedule
Calendar dated and committed schedule for the manufacture by the SUPPLIER,
including procurement and delivery of sub-contractor items. Schedules to be A3
size maximum and presented in bar chart form.
The bar chart should consist of two bars for each activity - one for planned
progress and one for actual progress, to be updated regularly and submitted as
part of the progress report described in A.03 below.
A.03 Progress Reports
Regular submission of these documents is required in order to compare progresswith the A.02 Fabrication/Production Schedule. This report shall as a minimum
consist of the following:
1) Description of all work accomplished in the preceding period.
2) Comparison of the present work status with the original schedule.
3) Status
of
all
drawings,
procedures
and
any
other
documents
required
by
the
Purchase Order and anticipated issue compared to the Supplier Data Schedule.
4) Proposed
course
of
action
in
anticipation
of/or
in
the
event
of
any
delays
to
the
program.
A.05 Table of Contents J-01, K-01
Initial issues of tables of contents should be in sufficient detail to define contents
of subject manuals.
Typically all documents required under the SDRL will form part of either J-01
(the Operating and Maintenance Manual) or K-01 (the Manufacturing Record
Book).
G.03 Handling and Shipping Procedures
SUPPLIER's proposed techniques. Indicate size of container, number of, weight,
identification and contents
J.01 Operation and Maintenance Manual
Manual Format
SUPPLIER shall prepare an Operation and Maintenance Manual fully describing
the equipment and spares supplied and providing detailed instructions for the
operation and maintenance of the equipment.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 8/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:8 of 29
The Manual shall typically have the following format:
Part 1: Leading Particulars
Including warranty/guarantee documents
Part 2: Installation
Including erection fasteners summary list
Part 3: Operation
Including operating fluid or material consumption details and SUPPLIER
catalogues.
Part 4: Maintenance
Part 5: Parts Data
Including commissioning and operating spare parts forms
Part 6: Drawings
Including parts list with relevant assembly drawings
Part 7: Calibration Schedules
Part 8: Fault Finding Correction
Part 9: Change out Time for Major Assemblies
All instructions shall cover start-up, normal operating, off-design operation,
emergency operations, shutdown and re-start. Maintenance Instructions shall
include recommended maintenance frequency.
Typically the above items are covered by Document Code No's. A, B, C, D, E, F,
G and J in the SDRL
J.02 Lubrication Schedules
Including grades, equivalent grades, system volume, change intervals.
J.03 Spare Parts for Commissioning and Start-up
Manufacturer shall identify, define and supply construction, pre-commissioning,
commissioning and start-up spare parts, lubricants, special tools and handling
gear for each item of equipment.
J.04 Spare Parts for 2 years of Normal Operation / Maintenance
Manufacturer shall identify, prepare and provide list of spare parts and lubricants
for each item of equipment for t two (2) years of normal operation / maintenance.
J.05 Operating Fluid or Material Consumption
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 9/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:9 of 29
Designate by reference to standard and generic type, plus MANUFACTURER’s
designation; initial charge quantity and estimated consumption rates.
J.06 Erection Fasteners Summary List
Description, sizes, and materials of fasteners required for the installation of
equipment or components.
J.09 Warranty/Guarantee Documents
Any special instructions or procedures regarding handling, storage, preservation
or pre-commissioning work which are pre-conditions for the validation of the
Guarantee on the goods by the SUPPLIER.
K.01 Manufactur ing Record Book
Manual Format
SUPPLIER shall prepare a Manufacturing Record Book fully describing the
manufacturing procedures used, the material certification and test and
inspection reports.
The Manufacturing Record Book shall contain all the approved documentation,
all procedures, certificates and records of inspection and testing, as-built
drawings as requested by the SDRL form and Purchase order.
Typically the above items are covered by Document Code No's. H, K, L in the
SDRL.
7.0 SUPPLIER QUALITY PROGRAMME REQUIREMENTS
7.1 GENERAL
Supplier shall operate an effective Quality System which, requirements of ISO 9001:2000.
Where the SUPPLIER is registered by an accreditation body to ISO 9001:2000, a copy of
the Registration Certificate shall be provided. Where the SUPPLIER is not registered, the
requirements of the SUPPLIER Data Requirements List (SDRL) for the submission of the
Quality Manual shall apply.
The Quality System requirements of the Purchase Order shall be passed on to any sub-
SUPPLIERs as applicable to their Scope of Supply.
7.2 INSPECTION AND TEST PLAN
Where required by the SDRL, an Inspection and Test Plan (ITP) specifying quality controls
for the product shall be provided. The Plan shall address all applicable parts of the Scope
of Supply including SUB-SUPPLIER activities. Where SUB-SUPPLIER Inspection and
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 10/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:10 of 29
Test Plans are submitted such plans shall be approved by SUPPLIER prior to
submission to PURCHASER.
The detailed Inspection and Test requirements be as per Appendix C shall be included in
the inspection of Test Plan.
The PURCHASER reserves the right to modify the extent of his inspection surveillance as
he deems necessary, including the right to third party inspection.
The SUPPLIER shall also include within the Inspection and Test Plan (ITP) any inspection
and testing requirements identified in the technical specifications referenced in this
requisition.
7.3 GUIDANCE NOTES FOR THE PREPARATION OF THE INSPECTION AND TEST PLAN
Activi ty Numbers shall be allocated sequentially to each described activity within the
process.
Activi ty Descript ion shall briefly describe all inspection and test.Control Document Reference The qualification/procedure/written instruction reference
used to control the activity.
Verifying Record The document produced as objective evidence of satisfactory
completion of the activity conformance to requirements.
SDRL Document Reference Where the SUPPLIER is to submit a document in
accordance with the PURCHASER’S Supplier Document Requirements List (SDRL) the
reference letter and number shall be stated.
Hold Points (H). The PURCHASER will indicate on the Inspection and Test Plan all hold
points beyond which the SUPPLIER may not continue without written authorization from
the PURCHASER Quality Assurance Group. The PURCHASER shall receive six (6)
working days advance notice of the dates when these points will be reached.
Witness Points (WT) The PURCHASER will indicate on the Inspection and Test Plan all
witness points whereby PURCHASER shall receive six (6) working days advance notice of
the dates when these points will be reached. Manufacture beyond these points without the
PURCHASER’S approval may render the work unacceptable.
Review Points (R). The PURCHASER will indicate on the Inspection and Test Plan all
review point whereby manufacturer shall submit the quality records for Purchaser review
and approval.
Monitor Points (M). The PURCHASER will indicate on the Quality Plan all activities which
will be subject to the PURCHASER monitoring during his inspection visits.
Certification (C). The SUPPLIER shall indicate all certification required by technical
requisition documents or relevant legislation etc.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 11/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:11 of 29
8.0 HEALTH, SAFETY AND ENVIRONMENT
8.1 GENERAL
SUPPLIERs are expected to maintain satisfactory Health, Safety and Environmental
performance.
Where in the performance of the SUPPLIERs obligations under this order, the SUPPLIER
intends to supply or to use any product which may or does contain a substance which is
hazardous to health or to the environment the SUPPLIER shall provide full details with bid.
In considering whether any product contains such substance the SUPPLIER shall include
any substance which may be released in the manufacturing process or by cutting, grinding,
spreading, burning, mixing or flushing etc.
When undertaking any work on site the SUPPLIER shall comply with all applicable site
HS&E regulations. The terms of such requirements shall be made available prior to any
site visits.
Note: ‘SUPPLIER’ includes all sub-SUPPLIERs/tradesman and contractors
8.2 INFORMATION WITH BID
The following documentation shall be provided with bid:
• A copy of any Health, Safety or Environmental accreditation certificates held.
• A statement detailing any plans to obtain any such accreditation.
A statement detailing any specific Health, Safety and Environmental accidents/incidences
which have occurred in the last three years.
9.0 SHIPPING REQUIREMENTS
9.1 PACKING INSTRUCTIONS
The packing instructions shall be as specified in the applicable sections below.
a Mechanical, electrical, electro-mechanical equipment such as, but not limited to
electric motors pumps, Pressure Gauges, gear motors, control/measuring equipment,
etc:
i. Shall be "shrink-wrapped" with a drying agent enclosed inside the package.
(Protruding parts shall be protected to avoid perforating the tight plastic wrap.).
ii. The item shall then be rigidly fastened inside a wooden case, totally immobilized
by being bolted down to the base, using carriage bolts and kept in a stationary
position by blocking, bracing or shimming. (Lag bolts not to be used for tie-down
or anchoring. If "shrink wrapping" not possible, the crate must be lined inside
with waterproof material and a drying agent enclosed.).
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 12/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:12 of 29
iii. Any case weighing in excess of 40kg must be so constructed as to have bottom
wooden skids of a thickness no less than 7 cm to permit handling by the crane.
iv. The case may be nailed or bound with steel strapping and must be made of
good quality wood, to withstand stacking of at least three (3) times its own weight.
v. One (1) copy of the packing list, release note and technical data shall be
enclosed in a sealed waterproof envelope and fastened to one (1) of the innersides of the case.
vi. One (1) copy of the packing list and release note shall be fastened in a sealed
waterproof envelope to the outside of the case and covered by a tin plate, on
which is printed "Packing List".
vii. Packing of items having different destination codes or Purchase Order numbers
in the same case is not permitted.
b Electrical, electronic, computer, control and regulation equipment of high fragility and
sensitive to shocks and vibrations.
i. Shall be "shrink wrapped" with drying agent enclosed; wrapped in
crepecellulose wadding or equally efficient cushioning material then placed in a
wooden case. This case will now be an inner case to a larger wooden case
having bottom skids as previously described in a) iv above.
ii. Between the inner and outer wooden cases there shall be a shock absorbing
system of springs, pneumatic cushions or mattresses calculated to withstand the
weight, volume and fragility of the Interior Goods;
iii. One (1) packing list and release note will be inside and another outside the
crate, as described in a) v and vi above.
iv. Packing of items having different destination codes or Purchase Order numbers
in the same case is not permitted.
c Pipe Fittings, Flanges and Valves:
i. Pipe fittings will be placed in waterproof lined wooden cases in such a manner
that movement within the case will be minimized to the greatest possible degree (as
in b. i and ii above). Weight of each case not to exceed 4.5 tonnes;
ii. Flange and valve flanges will have surfaces coated with an anti-corrosive varnish,
then they will be packed in waterproof lined wooden cases (as in b. i and ii above)
in such a manner that the flange faces will be separated from other metal by
wood or fiber board. Weight of each case not to exceed 4.5 tonnes;
iii. Each case will contain only one size, one grade and one kind of fitting, flange or
valve;
iv. Packing of items having different destination codes or Purchase order numbers in
the same case is not permitted;
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 13/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:13 of 29
v. One (1) copy of the packing list and release note complete with a mill certificate
shall be placed in a sealed waterproof envelope and attached to the inner side of
the case lid;
vi. One (1) copy of the packing list and release note shall be fastened in a sealed
waterproof envelope to the outside of the case and covered by a tin plate, on
which is printed "Packing List".d. Notification of Packaging:
See requirements of G.03 of SDRL.
9.2 AGREEMENT TO DELIVERY
Delivery shall only be accepted when the PURCHASER or his Representative has signed
a release note for delivery, or has waived this requirement in writing.
10.0 TRAINING REQUIREMENTS
VENDOR shall provide training at their manufacturing facility to OWNER’s engineers and
operators. Also on-job training shall be provided during commissioning for OWNER’s
engineers, operators and maintenance personnel.
11.0 START-UP AND COMMISSIONING SUPPORT
11.1 OPERATIONS INSTRUCTION AND MAINTENANCE MANUAL
VENDOR shall be responsible for providing manuals and other training aids such as
videos for operator training.
It should be noted that the working arrangement for all field-engineering services istwelve (12) hours per day, seven (7) days per week inclusive of public holidays. Supplier
shall provide all necessary special equipment and tools required for specialist supervision.
11.2 START-UP AND COMMISSIONING SUPPORT
The VENDOR shall also be responsible for providing Start-Up and Commissioning
Support at site on a per diem basis plus expenses, which will be reimbursed at cost.
Bidder shall provide a separate break-down for Start-Up and Commissioning Services
and Operator Training costs in their quotation. This information shall include a list of
personnel, required crew size, planned duration of in-services and a description of all
work to be performed.
12.0 DOCUMENT NUMBERING PROCEDURE
All drawings and documents shall be as per the ‘Project Numbering System’ 5368-EPC1-
PA-002’ listed under Section 13.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 14/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:14 of 29
13.0 TECHNICAL SPECIFICATION, DATA SHEETS AND DRAWINGS
Specification or DataSheet No.
Description
5638-E1-1500-ELC-DS-001 Data sheet for Transformer
DGS-EE-003 Specification for Transformer
DGS-MU-002 Preservation and Export Packing
DGS-MU-003 Spare Parts
DGS-MU-009 Equipment Noise Control
DGS-MX-001 Painting
DGS-MU-014 Minimum Shop Inspection and Certification Requirements
5368-EPC1-PA-002 Project Numbering System
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 15/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:15 of 29
APPENDIX A: SUPPLIER DATA REQUIREMENT LIST - (SDRL)
(For SDRL Below):
(1)
P = Print copy (e.g. 4-P denotes 4 prints required)
O = Original
E = Electronic copy required (portable document format)M = Modifiable electronic copy required (drawings to be AutoCad format, documents to be MS Office format)
(2)S = Review by Purchaser’s QC at Supplier’s Works
= Review at Purchaser’s Home Office
(3)One completed bound copy of J01 and K01 to be sent for Review and Approval immediately after completionof all Release Notes, prior to issue of the final copies and bound original
(4)J = Incorporate certified issue in J01K = Incorporate certified issue in K01
SUPPLIER DATA REQUIREMENT LIST
D O C U M E N T
C O D E N O .
DOCUMENT DESCRIPTION
N O . & F O R M A T W I T H
B I D ( N O T E 1 )
N O . & F O R M A T F O R
R E V I E W A
F T E R
O R D E R
( N O T E 1 )
R E V I E W L
O C A T I O N
( N O T E 2 )
W E E K S A F T E R
O R D E R
N O . & F O R M A T O F
C E R T I F I E D F I N A L
C O P I E S
( N O T E 3 )
C O M P I L A T I O N O F
C E R T I F I E D F I N A L
C O P I E S
( N O T E 4 )
A = CONTROL DOCUMENTS
A01 SUPPLIER DOCUMENT REGISTER 4-P+1-E 4-P+ 1-E √ 24-P+ 1-E
+1-OK
A02 FABRICATION/PRODUCTION SCHEDULE 4-P+1-E 4-P+ 1-E √ 2
A03PROGRESS REPORTS – BY TELEX/TELEFAX(EVERY TWO WEEKS)
4-P+ 1-E √
A04 BOUGHT OUT ITEMS LIST/SUB ORDER COPIES 4-P+ 1-E √ 2
A05 OTHER (SPECIFY)
A06 TABLES OF CONTENTS FOR J01,K01 4-P+ 1-E √ 2 J,K
B = A RRANGEMENTS
B01 PRELIMINARY LAYOUT DRAWINGS
B02 ARRANGEMENT DRAWINGS 4-P+ 1-E 4-P+ 1-E √ 24-P+1-M
+1-OJ
B03 SUB-ASSEMBLY DRAWINGS 4-P+ 1-E √ 24-P+1-M
+1-OJ
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 16/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:16 of 29
B04 ARRANGEMENT INTERFACE DRAWINGS
B05FOUNDATION/SUPPORT ARRANGEMENTS (INCL.FOUNDATION LOADS FOR FURTHER CIVIL DESIGNS)
4-P+ 1-E 4-P+ 1-E √ 24-P+1-M
+1-OJ
B06 EQUIPMENT & BILL OF MATERIALS LIST 4-P+ 1-E √ 24-P+1-M
+1-OJ
B07 OTHER (SPECIFY):
C = SYSTEM DIAGRAMS & DATA SHEETS
C01 PIPING & INSTRUMENT DIAGRAMS
C02 HVAC SCHEMATIC & FLOW DIAGRAM
C03 ONE LINE ELECTRICAL DIAGRAM / WIRING DIAGRAM
C04 INST/TELECOMS SYSTEM SCHEMATIC DIAGRAM
C05 UTILITY REQUIREMENTS 4-P+ 1-E 4-P+ 1-E √ 2 4-P+1-M+1-O
J
C06 WEIGHT DATA SHEET & WEIGHING CERTIFICATE 4-P+ 1-E 4-P+ 1-E √ 24-P+1-M
+1-OJ
C07 EQUIPMENT DATA SHEETS 4-P+ 1-E 4-P+ 1-E √ 24-P+1-M
+1-OJ
C08 ENCLOSURE VENTILATION REQUIREMENTS
C09 NOISE LEVEL DATA SHEETS 4-P+ 1-E 4-P+ 1-E √ 24-P+1-M
+1-OJ
C10 RELIABILITY/AVAILABILITY DATA
C11 FUNCTIONAL DESIGN SPECIFICATION
C12 OTHER (SPECIFY):
D = DETAIL DRAWINGS
D01 PLAN AND ELEVATION DRAWING WITH PARTS LIST 4-P+ 1-E 4-P+ 1-E √ 24-P+1-M
+1-OJ
D02 INSTRUMENT PANEL DETAIL DRAWING
D03 EXPLODED VIEW DRAWINGS
D04DETAIL VESSEL OR TANK FABRICATION DRAWINGS( FOR DIESEL SYSTEM)
D05 PLATE CUTTING DETAILS & WELD DETAILS
D06 MISCELLANEOUS DETAIL DRAWINGS 4-P+ 1-E 4-P+ 1-E √ 24-P+1-M
+1-OJ
D07 MECHANICAL SEAL DRAWING
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 17/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:17 of 29
D08 SHAFT ALIGNMENT DRAWINGS
D09 NAME PLATE FORMAT DRAWINGS 4-P+ 1-E √ 24-P+1-M
+1-OJ
D10 PIPING ISOMETRICS (FOR DIESEL SYSTEM)
D11 OTHER (SPECIFY)
E = SCHEMATICS
E01 ELECTRICAL INTERNAL CONNECTION DIAGRAMS 4-P+ 1-E √ 24-P+1-M
+1-OJ
E02 ELECTRICAL PNEUMATIC, HYDRAULIC SCHEMATICS
E03 INSTRUMENT/ELECTRICAL LOGIC DIAGRAM
E04 ELECTRICAL INTERCONNECTION DIAGRAMS 4-P+ 1-E √ 24-P+1-M
+1-OJ
E05 ELECTRICAL CABLE SCHEDULE 4-P+ 1-E √ 24-P+1-M
+1-OJ
E06 INSTRUMENT HOOK-UPS-PROCESS PIPING
E07 INSTRUMENT LOOP DRAWINGS
E08 OTHER (SPECIFY):
F = CALCULATIONS & PERFORMANCE DATA
F01 ALLOWABLE NOZZLE LOADS
F02 UTILITIES CONSUMPTION CALCULATIONS
F03 HYDRAULIC CALCULATIONS
F04PRESSURE VESSEL/HEAT EXCHANGER CODECALCULATIONS
F05 EXCHANGER THERMAL RATING CALCULATIONS
F06COMBUSTION GAS TURBINE PERFORMANCECURVES
F07 ENGINE PERFORMANCE CURVES
F08 CENTRIFUGAL PUMP PERFORMANCE CURVES
F09 ROTARY PUMP CURVES PUMP/MOTOR
F10 FIRE PUMP PERFORMANCE CURVES
F11 ORIFICE PLATE CALCULATIONS
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 18/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:18 of 29
F12FOR MAX SHUT OFF DP FOR ESD VALVE TORQUECALCULATION AND ASSOSIATED ACTUATOR SIZINGCALCULATION
F13MOTORISED VALVE (INCL.ESD) PERFORMANCEDATA
F14 RELIEF VALVE & BURSTION DISC CALCULATIONS
F15 THERMOWELL NATURAL FREQUENCY CALCULATIONS
F16 ELECTRICAL FUSE & CIRCUIT BREAKER CURVES
F17 ELECTRIC MOTOR PERFORMANCE CURVES
F18 SPEED/TORQUE STARTING CHARACTERISTICS
F19 BATTERY CHARGE/DISCHARGE CURVES
F20RELAY CHARACTERISTICS & CO-ORDINATIONSETTINGS
F21 OTHER (SPECIFY)
G = HANDLING, INSTALLA TION & SITE PRESERVATION
G01 ERECTION & INSTALLATION PROCEDURES 4-P+ 1-E √ 24-P+1-M
+1-OJ
G02 UNPACKING & PRESERVATION PROCEDURE 4-P+ 1-E √ 24-P+1-M
+1-OJ
G03 HANDLING & SHIPPING PROCEDURES 4-P+ 1-E √ 24-P+1-M
+1-OJ
G04 OTHER (SPECIFY):
H = MANUFACTURING PROCEDURES
H01ISO 9002 CERT OR QA MANUAL AND SYSTEMSPROCEDURE
4-P+ 1-E 4-P+ 1-E K
H02HYDROSTATIC AND/OR PNEUMATIC TESTPROCEDURES
H03 NON DESTRUCTIVE EXAMINATION PROCEDURES
H04WELD PROCEDURE SPEIFICATION AND WELDPROCEDURE QUALIFICATION (WPS & WPQ TOBE SUBMITTED TOGETHER)
H05 SUPPLIER INSPECTION & TEST PLAN 4-P+ 1-E 4-P+ 1-E √ 44-P+1-M
+1-O
K
H06PERFORMANCE TESTING & ACCEPTANCE TESTPROCEDURES
4-P+ 1-E √ 44-P+1-M
+1-OK
H07SURFACE CLEANING PREPARATION/PAINT LININGPROCEDURES
4-P+ 1-E √ 44-P+1-M
+1-OK
H08MANUFACTURE PROCEDURE, QUALIFICATION TESTRESUL TS
4-P+ 1-E √ 44-P+1-M
+1-OK
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 19/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:19 of 29
H09 HEAT TREATMENT PROCEDURE
H10 HSE MANUAL 4-P+ 1-E √ 44-P+1-M
+1-OK
J = COMMISSIONING OPERATING MAINTENANCE SPATES
J01 OPERATING & MAINTENANCE MANUAL (NOTE 3) 1-P+ 1-E √ 4 J
J02 LUBRICATION SCHEDULES
J03 SPATES FORM (COMMISSIONING / START UP) 4-P+ 1-E √ 44-P+1-M
+1-OJ
J04 SPARE PARTS FORM (OPERATING) 4-P+ 1-E √ 44-P+1-M
+1-OJ
J05 OPERATING FLUID & MATERIAL CONSUMPTION 4-P+ 1-E √ 44-P+1-M
+1-OJ
J06 ERECTION FASTENERS SUMMARY LIST 4-P+ 1-E √ 44-P+1-M
+1-OJ
J07PRE-COMMISSIONING/COMMISSIONINGPROCEDURES
4-P+ 1-E √ 44-P+1-M
+1-OJ
J08 SUPPLIER CATALOGUES 4-P 4-P+1-M+1-O
J
J09 WARRANTY/GUARANTEE DOCUMENTS 4-P+ 1-E √ 44-P+1-M
+1-OJ
J10 OPERATING & MAINTENANCE INSTRUCTIONS 4-P+ 1-E √ 44-P+1-M
+1-OJ
J11 OTHER (SPECIFY):
K = MATERIAL CERTIFICATION
K01 MANUFACTURING RECORD BOOK (NOTE 3) 1-P+ 1-E √ K
K02 HYDROSTATIC/PNEUMATIC TEST CERTIFICATIES
K03EQUIPMENT HAZARDOUS AREA CERTIFICATES(BASEEFA)
K04 MILL TEST CERTIFICATES
K05 HEAT TREATMENT CERTIFICATES
K06 WELDABILITY DATA
K07 CERTIFICATE OF CONFORMITY/FIRE SAFETY
K08 OTHER (SPECIFY)
L = TEST & INSPECTION REPORTS (2 WEEKS AFTERTEST/INSPECTION)
L01 ELECTRICAL EQUIPMENT HEAT RUN TEST RECORD 4-P+1-E √ 44-P+1-E
+1-OK
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 20/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:20 of 29
L02 IMPULSE VOL TAGE TEST RECORDS 4-P+1-E √ 44-P+1-E
+1-OK
L03 ELECTRICAL SHORT CIRCUIT TEST RECORDS 4-P+1-E √ 44-P+1-E
+1-OK
L04 NAME PLATE COPY 4-P+1-E √ 44-P+1-E
+1-OK
L05 PERFORMANCE/ACCEPTANCE TEST RECORDS 4-P+1-E √ 44-P+1-E
+1-OK
L06 NOISE LEVEL TEST REPORT 4-P+1-E √ 44-P+1-E
+1-OK
L07 VIBRATION TEST REPORT
L08 VESSEL & EXCHANGER CODE DATA REPORTS
L09 PURCHASED INSTRUMENT CALIBRATION REPORTS
L10 HARDNESS TEST RESULTS
L11 NDT TEST RESULTS
L12 FABRICATION/INSPECTION COMPLIANCESTATEMENT
4-P+1-E √ 4 4-P+1-E+1-O
K
L13 CORROSION TEST RECORDS (SOUR SERVICE)
L14 LIFTING EQUIPMENT TEST CERTIFICATES
L15WELDER PERFORMANCE QUALIFICTATION RESULTS& CERTIFICATES
L16 PRODUCTION REPORT
L17 NDT OPERATOR QUALIFICATION CERTIFICATES
L18 PAINTING/COATING LOG/CERTIFICATE 4-P+1-E √ 44-P+1-E
+1-OK
L19 PURCHASER RELEASE NOTES/WAIVERS √ 4-P+1-E
+1-OK
L20 THIRD PARTY INSPECTION RELEASE NOTES √ 4-P+1-E
+1-OK
L21 OTHER (SPECIFY)
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 21/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:21 of 29
APPENDIX-B: SPARE PARTS AND INTERCHANGEABILITY RECORD (SPIR)
GUIDE FOR COMPLETION
COMPLETION OF THE SPIR FORMS BY THE MANUFACTURER/WUPPLIER
The SPIR form itself consists of a main sheet and continuation sheet produce on MS
EXCEL (A4) which can be electronically (and manually) completed. In accordance with thePurchase Order, the manufacturer/supplier is required to complete 1-13, 15, 17, 18, 20 &
22 as described below. All information on the form should be in the English language.
1) EQUIPMENT OR TAG NUMBER
Enter the unique equipment registration number or CLIENT tag number for each piece of
equipment (or unit) as stated in the Requisition/Purchase Order, Where necessary, one of
more Continuation Sheets may be necessary, particularly in the case of instrumentation for
example, when there are many identical models and different tag numbers or even slightly
different internals.
2) MANUFACTURERS SERIAL NUMBER
State the model, type, or other positive identification reference of the equipment,
instrument, valve, etc. It should NOT be, for example, a model number that covers a range
of differing models. The actual model supplied is the data that should be entered.
3) MANUFACTERERS SERIAL NUMBER
State the serial number (or other identification reference) of the parent equipment for
which the spare part(s) listed in col. 8 are required. For example, panels, pumps,
compressors, control valves/indicators, motors, turbines, gear-boxes, heat exchangers,
vessels, engines, etc., should all be included in the SPIR documentation package.4) NUMBER OF UNITS
Enter the total number of identical units as identified in 1, 2 & 3.
5) NUMBER OF UNITS
For each individual unit identified in 1, 2, & 3, enter the number of identical items that are
fitted to that unit, piece of equipment or instrument.
6) EQUIPMENT ORDER REFERENCE NUMBER
State the order or reference number assigned by CLIENT, their agents together with the
order, reference or works number assigned by the manufacturer/supplier of the plant,
equipment or package.
7) TOTAL NUMBER OF PARTS FITTED
Enter the total number of identical line items covered by all the units listed in 1, 2 & 3.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 22/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:22 of 29
8) DESCRIPTION OF PARTS
List all parts which may be carried in stock for initial (commissioning) and normal (two
years) operations, insurance items such as spare pumps, motors, valves, etc., and capital
spares such as spare gas turbine, gas generator, compressor rotor, large couplings, etc.
that are supplied within the cost of supply of the parent equipment or package.
Note:
Listing capital items is imperative in order that availability of these spares is documented
(together all the normal spares) and should be indicated on the SPIR as being part of the
main order.
Line items listed should not be duplicated.
9) DRAWING NUMBER
For each part entered in Col 8, enter the manufactures part list and/drawing number. This
should NOT be a reference to a general layout where no detail is available.
Documents refered to shall always be attached to the SPIR by the manufacturer of
supplier.
10 A) MANUFACTURERS PART NUMBER
Enter the MANUFACTUREs unique full reference number or other information, which
specifically identifies each part in the manufactures organization.
10 B) SUPPLIERS PART NUMBER
Enter the suppliers full, unique identification number for items form third party
manufactures (“bought-out” items) such as bearings, oil seals, gaskets, couplings,
instruments, gauges, vibration/displacement parts, electrical components, contactors,fuses, relays, etc.
Notes for 10A and 10B
In view of the wide variety of systems in use for identification of parts, it is not possible to
lay down firm rules for the completion these columns. Manufactures /suppliers should
give whatever identification they use to positively identify parts and to show
interchangeability with other existing equipment.
Numbering that is unique only to the equipment on the SPIR being completed is to be
discouraged as it inevitably leads to an unnecessary increase in inventory levels
particularly for “bought-out” items. Of particular importance is the inclusion of the full
designation, especially those relating to electrical and instrument items, couplings,
mechanical seals, etc. Where the designation or code indicates something special,
details should be included together the options fitted on the material to be supplied that
are not part of the code or is not standard.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 23/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:23 of 29
Although FINAL drawings may not always be available together with real part numbers,
this should not delay initial completion of the SPIR form. In such cases, for initial
submission only, general catalogue information, pamphlets, etc., will suffice. However,
as soon as the final drawings are available, a revision of the SPIR should be submitted
together with the relevant drawings.
11) MATERIAL SPECIFICATION
Enter the material specification in terms of full, recognized International standards and
accepted conventions. Manufacturer or sub-vendor references are not acceptable. The
manufacturer or subvendor address and fax number, moreover, should be provided on
additional document.
12) REMARKS
Any specific remarks particular to the equipment or spare part shall be indicated.
13) INITIAL SPARE PARTS RECOMMENDED BY MANUFACTURER
Enter the quantities recommended by the manufacturer for commissioning and initialfirst year of operation.
14) INITIAL SPARE PARTS RECOMMENDED BY ………
This should be completed by the Project Team or its agents after reviewing the
manufactures recommendation in Col 13 AND shall be the first year spares that require
handing over for the operation of the equipment.
15) SPARE PARTS FOR NORMAL OPERATION RECOMMENDED BY THE MANUFACTURER
Enter the quantities recommended by the manufacturer/supplier required for day to day
maintenance for a two year period following the initial operation.
16) SPARE PARTS FOR NORMAL OPERATION RECOMMENDED BY ………
This should normally be completed by Maintenance Department (the user Department)
after due consideration of operational requirements and should be considered as 2 year
operating spares and specifically being required during that period only.
17) UNIT PRICE
Enter the ex-works price. The currency should be indicated in the box above this column.
NOTE: This should be the replacement cost of the item and not the initial discounted
price.18) DELIVERY TIME IN WEEKS
Enter the time between receipt of a subsequent order and availability ex-works.
NOTE: This is not for the project supplied material.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 24/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: CONSTRUCTION OF OIL TERMINAL AT HAMRIYAH FREE ZONE(EPC-1)
Doc.No.: 5638-E1-1500-ELC-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page:24 of 29
19) MIN/MAX QUANTITY
To be completed by the user department.
20) UNIT OF MEASURE
This should be the unit the manufacturer normally uses for supplying the item.
NOTE: Where sets are indicated, the contents of the set must be provided together withthe part nos. Where units alone are insufficient i.e. bag, drum, cylinder, also provide the
capacity.
21) MESC NUMBER
To be completed by CLIENT Central MESC Section.
22) CLASSIFICATION OF PARTS
The completion of this field is very important and should be done by the manufacture/
Supplier of the line item. Codes are as follows:
Y- Capital items supplied as a spare with the original package, the cost of which isincluded in that of the complete activity i.e. rotor assembly, spare gas turbinegas generator, large load coupling, etc. No normal consumption of these vitalitems is foreseeable.
I- Spare parts or complete assemblies (usually, but not necessarily, of high value)which are not normally required for ordinary maintenance and, at the time ofpurchase, there is no foreseen consumption. However, they may be required inthe event of unforeseen breakdown to avoid a lengthy shut-down of a vital ofequipment.
R- Items that can be economically repaired (NOT spares for insurance items).
C- Spare parts for which there is a regular requirement and consumption, for normalday to day maintenance, due to the normal wear and deterioration. This may alsocover items that support a system that is duplicated in the plant design to affordredundancy without jeopardizing or compromising the plant, it is deemedessential to be held so that full availability can be restored within a reasonabletime.
23) AUTHORITY BLOCK
To be completed for the ordering of quantities in Columns 13, 14, 15 or 16 as
appropriate.
24) REQUIRED ON SITE DATE
To be completed as appropriate for the items ordered in accordance with 23 above.
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 25/29
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 26/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: Construction of Oil Terminal at Hamriyah Free Zone(EPC1)
Doc.No. : 1500-EPC1-MR-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page: 26 of 29
1
EQUIPTREG.
OR TAGNO.
SPIR NO :
EQUIPMENT :
MANUFACTUBER :
SUPPLIER :
2
MFR’S
MODELOR TYPE
3MFR’SSERIAL
NO.
4NO. OFUNITS
REMARKS
5
M U M B E R
O F P A R T S P E R
U N I T
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 1819 19
20 20
21 21
22 22
23 23
24 24
6
E Q U I P .
O R D E R
R E F N O .
ISSUE LETTER
ISSUE DATE
SIGNATURE
SHEET NO: OF
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 27/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: Construction of Oil Terminal at Hamriyah Free Zone(EPC1)
Doc.No. : 1500-EPC1-MR-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page: 27 of 29
APPENDIX-C: TEST AND INSPECTION DATA SHEET
TEST AND INSPECTION DATA SHEET
BUYER REPRESENTATIVE
THIRD PARTY INSPECTION
VENDOR
1.0 CERTIFICATES
1.1 Workmanship, material surface defects, components,dimensions
V R R
1.2 Certificate of compliance with purchase order,specifications & drawings
V R R
2.0 ROUTINE TESTS
2.1 Measurement of winding resistance V WT WT/R
2.2 Measurement of voltage ratio and check of voltage vectorrelationship
V WT WT/R .
2.3 Measurement of impedance voltage (Principal Tapping), shortcircuit impedance and load loss
V WT WT/R
2.4 Measurement of no load-loss and current V WT WT/R
2.5 Dielectric tests: Induced overvoltage withstand test andseparate-source voltage withstand test
V WT WT/R
2.6 Tests on on-load tap changers V WT WT/R
2.7 Partial discharge tests V WT WT/R
3.0 TYPE TESTS
3.1 Temperature rise tests V WT WT/R
3.2 Dielectric tests: Full wave impulse voltage withstand tests V WT WT/R
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 28/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: Construction of Oil Terminal at Hamriyah Free Zone(EPC1)
Doc.No. : 1500-EPC1-MR-MR-001
Title: Material Requisition for Transformer
Office: Beijing Agreement No. 10-5638-E-1 Document: 5638-E1-1500-ELC-MR-001 Rev. A Page: 28 of 29
4.0 SPECIAL TESTS
4.1Dielectric tests: Impulse-voltage withstand tests includingchopped waves
V WT WT/R
4.2Measurement of zero sequence impedance on three
phase transformer
V WT WT/R
4.3 Short circuit tests V WT WT/R
4.4 Measurement of acoustic sound level V WT WT/R
4.5 Measurement of the harmonics on the no load current V WT WT/R
4.6 Measurement of the power taken by the fan and oil pump motor V WT WT/R
5.0 OTHER (Per approved procedure)
5.1 Compilation of all inspection and test in one document V R R
6.0 REMARKS
6.1 Vendor shall submit testing and inspection procedure for materialand finished products upon placement of order.
7.0 LEGEND
7.1 V =VENDOR TO PROVIDE
7.2 R =REVIEW OF DOCUMENTATION
7.3 H =HOLD POINT
7.4 WT= WITNESSED TEST
7.5 NA = NOT APPLICABLE
7/24/2019 5638 E1 1500 ELC MR 001 MR for Transformer
http://slidepdf.com/reader/full/5638-e1-1500-elc-mr-001-mr-for-transformer 29/29
Client: ADNOC DISTRIBUTION/TAKREER
Project: Construction of Oil Terminal at Hamriyah Free Zone(EPC1)
Doc.No. : 1500-EPC1-MR-MR-001
Title: Material Requisition for Transformer
Offi B iji A t N 10 5638 E 1 D t 5638 E1 1500 ELC MR 001 R A P 29 f 29
APPENDIX-D: CHECKLIST
SRNO
CHECK LISTBIDDER’S CONFIRMATION/DEVIATION
(TO BE FILLED IN BY BIDDER AND TO BESUBMITTED ALONG WITH THE OFFER)
1
Bidder to submit the following documents along with the
proposal:
a) ISO Certificate
b) Product Catalogue
c) Typical ITP / QA Plan indicating all the Inspection
and Testing requirement mentioned in the specification
& Data Sheet
d) QA Manual Index
e) SPIR form duly filled.
f ) Duly signed & Stamped SDRL
g) Check list sheet for the Transformer duly replied,
signed and stamped.
2
Bidder to confirm compliance to following
Specification:
DGS-EE-003 Specification for Transformer
3
Bidder to confirm compliance to following Data
Sheet:
5638-E1-1500-ELC-DS-001 Data Sheet for
Transformer.
4
Bidder to confirm that material offered, if different from
material indicated in the Specification and Data Sheet,
they shall not be inferior to that of the material grade
indicated and shall be compatible to the service fluid
indicated in the Specification and Data Sheet .
5 Bidder to confirm that the Transformer shall be
supplied with certification
6Typical sectional drawing submitted along with the offer
should indicate all the parts of the Transformer.
7 Bidder to confirm compliance to Painting Spec Doc.
DGS-MX-001 Rev.1
8 Bidder to confirm document submittals as per the SDRL
in the MR.