  • Section 4 I Page 1UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS

    4.1 Installing Stress Control and Insulation Materials

    4.1.1 Single-Core Paper Insulated Cables in Transition Joints

    Preparethecableasdescribedinsection3.2.Useachinagraphpenciltomark20mmontotheleadsheathand10mmontotheinsulationpapers.

    Removethereleasepaperfromthemediumlengthofyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.

    Useachinagraphpenciltomarktheleadsheath20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandovertheyellowstresscontroltape,overlappingontotheleadsheathby20mm.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 2

    Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.

    Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdownstartingattheopencableendbeforeworkingtowardstheleadsheath.

    4.1.2 Single-Core Polymeric Pot Ends

    Preparethecablesasdescribedinsection3.1uptoandincludingthescreenremovalpoint.Thedimensionforthescreenis80mm.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 3UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Removetheinsulationfor30mmfromtheendofthecable.

    Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesofconductingmaterial.Alwayswipefromtheopencutendtowardsthescreenwirestoavoidcontaminatingtheinsulationwithcarbonfromthescreenlayer.

    Wraptheconductivetapesuppliedinthejointingkitaroundthe30mmofexposedconductorstretchingittoabouthalfitsoriginalwidth.

    Increasetheconductordiametersufficientlysothattheinsulatingrodisasnugfitovertheconductor.Pushtheinsulatingrodontotheconductorensuringthatitbuttsagainstthecableinsulation.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 4

    Useashortstripofyellowstresscontrolmasticandremovethereleasepapersfromashortstripofyellowstresscontrolmastictape.Wrapitaroundtheedgeoftheinsulationscreenstarting20mmfromthescreenedge,beforecontinuingfor10mmontothecoreinsulation.Stretchthetapetoapproximatelyhalfitsoriginalwidthtoobtainafineedgeontotheinsulation.

    Usingalongstripofyellowstresscontrolmasticandremovethereleasepapers.Wrapitaroundthecoreinsulationstarting10mmfromtheinsulationedge,beforecontinuingontotheinsulatingrodcoveringthe'paintedarea'and10mmbeyondontotherodinsulation.

    Useonlyasmuchoftheyellowstresscontrolmastisasnecessarytofillinthestepbetweentheinsulationandtherod.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 5UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wraponelayerofredmasticaroundtheinsulatingrod60mmfromitsendandwithawidthof10mm.

    Positiontheblackstresscontroltubingovertheinsulatingrodandbuttitupagainstthecableoversheathcut.Shrinkthetubingdownstartingattheoversheathendbeforeworkingtowardstheinsulatingrodend.

    Useonelayerofredmasticaroundeachendoftheinstalledstresscontrolledtube60mminfromeachendandwithawidtehof10mm.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage6

    Slidetheredinsulatingtubingoverthestresscontroltubebuttingitagainstthecableover-sheathandcoincidingwiththestresscontroltubingedge.

    Shrinkthetubingdownstartingattheover-sheathendandworkingtowardstheinsulatingrodend.

    Placetheblackandredscreenedinsulatingtubingovertheassemblyandpositionittocoincidewiththepreviouslyinstalledtubes.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 7UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Shrinktheblackandredtubedownstartinginthecentre.Whenthissectionisfullyshrunkitshouldbesmoothwithoutridgesandshouldnotmovewhentwistingthetubeend.

    Continuetheshrinkingprocess,workingtowardsoneendandstopping50mmfromtheend.Thenshrinktowardstheoppositeendstopping50mmfromtheend.Finallyshrinkdownthefirstremaining50mmoftubingfollowedbythesecond50mmoftubing.Thisprocessensuresthatnoairistrappedinsidethetube.

    4.1.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Preparethecablesuptothepointasdescribedinsection3.3.

    ProtecttheCopperWovenTape(CWT)withnylontape,startingfrom20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage8

    Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcore,overlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.

    Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandfreefromcreasesorwrinkles.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 9UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchbeforeworkingtowardsthecoreends.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 10

    Slidethesmallyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.

    Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.

    Wrapstripsofyellowmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntila'cone'shapeisformed.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 11UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdownstartingatthecentre,beforefirstlyworkingtowardstheleadsheathandthentowardsthebreakoutfingers.

    4.1.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Preparethecablesuptothepointasdescribedinsection3.3.

    ProtecttheCWTwithnylontape,starting20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 12

    Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcoreoverlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.

    Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionbeforeworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandisfreefromcreasesorwrinkles.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 13UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchworkingtowardsthecoreends.

    Slidethesmallersuppliedyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 14

    Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.

    Wrapthestripsofyellowstresscontrolmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntilaconeshapeisformed.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 15UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdown,startingatthecentrebeforeworkingtowardstheleadsheathandthentowardsthebreakoutfingers.

    Positiontheshortlengthofwrap-aroundheatshrinktubeoverthepapercablesothatitcoverstheleadsheathandthethreefingerbreakout.Leaveagapofatleast100mmbetweentheendofthewraparoundandthearmoursealingsleeve.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage16

    Shrinkthewrap-aroundinplacestartinginthemiddle,untilthesurfacepaintonthetubeturnsfromgreentoblack.Thengraduallymovetoeachendusingthesameprocess.Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbeclearlyseenunderit.

    Positiontheshortsealingheatshrinktubesovertheturretsoftheheatshrinkbreakout,ensuringtheyarepushedrightintothecrutchandshrinkinplace.

    4.1.5 HSL Breakout Module

    Preparethecablesuptothepointasdescribedinsection3.4.1to3.4.3.

    Useachinagraphpenciltomarkeachleadsheath100mmfromthearmourcutedge.Foldashortlengthoftinnedcoppermeshinhalflengthways.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 17UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wrapthetinnedcoppermesharoundtheleadsheathscenteredonthe100mmmark.

    Positiononeofthelengthsofbraidoverthemeshsothatthelooseendpointsawayfromthecrutchofthecable.

    Securealengthofearthbraidtoeachleadoftheleadsheathsusingoneturnoftherollspringsdirectlyontothecoppermeshwrap.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage18

    Bendthebraidsbackovertherollspringandthensecureinplacewiththeremainingturns.

    CovereachoftherollspringswithtwolayersofPVCtape.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 19UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Securethebraidendstothearmoursandthesupportringwitharolloftinnedcoppermeshsandwichingthebraidsbetweenthemeshwraps.

    Finally,securethemeshandbraidstothesupportringandarmoursusingthewormdriveclipsprovided,withoneclipeithersideofthesupportringscentralridge.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 20

    CoverthewormdriveclipswithPVCtapetotidyuptheirlooseends.

    Slideasealingsleeveovereachleadsheathandrollspringconnectionuptowheretheearthbraidmeetsthesupportring.Shrinkthemdownstartingontheleadsheathsandcontinuingtowardsthearmourwiresarea.

    Wrapastripofblackmasticbehindthesupportringoverthearmourwires,fillingthespacebetweentheringandtheoutersheath.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 21UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Passthebreakoutovertheleadsealingsleevesandpulldownintothecrutch.Shrinkthebreakoutdownstartinginthecentrebeforemovingtowardstheover-sheathandthenshrinkthebreakoutfingers.

    Positionthecrutchsealingsleevewithoneendlevelwiththeendofthefingersonthebreakoutandshrinkintoplace.

    4.1.6 HSL Cable Core Preparation

    Preparethecablesasdetailedinsection4.1.5andremovetheleadsheathsasdescribed insection3.4.4.

    Useachinagraphpenciltomark20mmontotheleadsheath,and10mmontothe insulationpapers.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 22

    Removethereleasepaperfromoneofthemediumlengthsyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.

    Makeamarkontheleadsheathusingachinagraphpencil20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandtheyellowstresscontroltapeoverlappingontotheleadsheathby20mm.

    Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 23UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdown,startingattheopencableendbeforeworkingtowardstheleadsheath.

    4.1.7 Paper Insulation 'Shim Kit' for Cable Cross Sections 70mm & 95mm

    Forcablesbelowtheminimumsizerangespecifiedonthekitlabela'shimkit'mustbeused.

    Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.

    Applyapieceoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapeprovidedinthemainjointkit.

    Positionashortlengthofthesmallerdiameterstresscontroltubing(42/16)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 24

    Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.

    Wraponeoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothecore.

    Positionashortlengthofthelargerdiameterstresscontroltubing(54/24)directlyoverthepreviouslyappliedstresscontroltubeandshrinkdownfollowingthesameprocedureasbefore.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 25UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Applyoneoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothepreviouslyappliedredmastic.

    4.1.8 Paper Insulation 'Shim Kit' for Cable Cross Sections 120mm & 150mm

    Forcablesbelowtheminimumsizerangespecifiedonthekitlabel,a'shimkit'mustbeused.

    Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.

    Applyashortlengthoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapesuppliedinthemainjointkit.

    Positionashortlengthofthestresscontroltubing(54/24)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage26

    Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.

    Wraponeoftheredmasticstripsprovidedaroundeachendofthestresscontroltube30mmontothetubingand10mmontothecore.

    4.1.9 Single-Core Polymeric Terminations (Indoor and Outdoor)

    Followthecablepreparationproceduresforpolymericcablesasdescribedinsection3.1.

    Useachinagraphpenciltomarktheoutersheath60mmbelowthesheathcutposition.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 27UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wraponelayerofredsealanttapeoverthecablesheathdowntothechinagraphpencilmark.

    Bendbackthecopperscreenwirescarefullyandlaythemontothemastictapetakingcarenottocrossoveranyofthewires.Securethewireswithawirebinderatthe60mmmark.

    Makeachinagraphpencilmarkontothecorescreen40mmfromthesheathcut.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage28

    Removethecorescreendowntothe40mmmarkusingtheapprovedscreenstrippingtool.

    Makeamarkwithachinagraphpencil20mmontothecorescreenand10mmontotheinsulation.

    Removethereleasepaperandwraptheyellowstresscontrolmasticaroundthescreencutbetweenthetwopencilmarks.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontotheinsulation.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 29UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positiontheblackstresscontroltubingoverthecoresothatitislevelwiththeoutersheathcut.Shrinkthetubingdown,startingatthesheathcutendandworkingupwards.Whenfullyshrunkthetubingshouldbesmoothandwrinklefree.

    Removetheinsulationfromthecoreendaccordingtotheinnerdimensionofthecablelugbarrel.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 30

    Fitthecablelugensuringthatthelugbuttsagainsttheinsulationedgeandhandtightenthesecuringbolts.

    Shearofftheboltheadsusingtheapprovedtoolsandfillintheindentswiththegreyclayprovided.

    Wraptheredsealanttapearoundthelugbarrel,overlappingontotheinsulation.Buildupthediameterdifferencewiththeredtapesothatasmoothandevenprofileisachieved.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 31UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Removethereleasepaperfromtheredtubing.Placethetubingoverthecableend(withthesealantcoatedenddownwards),levelwiththewirebinder.

    Shrinkthetubingdownstartingattheoutersheathend,beforeworkingtowardsthecable lug.

    Cutthetubingbackontothecablelug,levelwiththetopofthemainbody,ifnecessary.

    Post-heatthepalmofthecableluguntilabeadofthesealantappearsaroundthetopof thetubing.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 32

    Useachinagraphpenciltomarkthepositionfortheshedsonthetubingatthedimensiongivenintheterminationinstruction.

    Placetwoskirtsoverthecableendandpositiononthepreviouslymademarks.Shrinkeachshedinplace.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 33UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Foroutdoorterminationstherearefourskirtstobefittedtoeachtermination.Theseshouldbeplacedandshrunkintopositionatthemeasurementsindicatedintherelevantjointinginstruction.

    4.2 Installing Mechanical Connectors and Lugs

    4.2.1 Single-Core Polymeric Straight Joints

    Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1.

    Positionthecombinedstresscontrol,screenedinsulatingtubingandoutersealingsleeveoveroneofthecableends.

    Removetheinsulationasdescribedinsection3.1.3.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 34

    Theconnectorcomeswithmetalinsertstofitsmallconductors.Iftheconductorwillnotfittheconnector,discardtheinsertandusetheconnectorwithoutit.

    Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsttheendoftheconnector.

    Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 35UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Continuetotightenandsheeroffalltheboltsstartingwiththeboltsateachendfollowedbythecentralbolts.

    Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.

    4.2.2 Single-Core Transitional Straight Joints

    Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and3.2.

    Slidethefivepiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.

    Note :Itisimportantthatthefourthtube(thesecondlargest)isplacedwithinthetubeset sothattheuncoatedinneredgepointstowardsthejointcentre.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage36

    Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.2.5.

    Theconnectorisa'TwoPiece'designwiththetwohalvessecuredtogetherwithacentralshearbolt.Eachconnectorhalfhastwoconductorsecuringboltswhicharealsooftheshearofftype.

    Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsteachendoftheconnector.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 37UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.

    Continuetotightenandsheeroffalltheboltsstartingwiththoseateachendfollowedbythecentralbolt.

    Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage38

    4.2.3 Resin Filled Three-Core Trifurcating Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1and4.1.3.

    Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.

    Slidethethreepiecetubingsetsoverthepolymericcableside.Nestingthetubesetsontheplasticbagwrappingtokeeptheinsideofthetubesclean.Thetubesetsshouldbeplacedintheordershown.

    Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors,sections3.1.3and3.3.7,totheconnectorinsertiondepth.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 39UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.

    Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.

    Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 40

    Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.

    Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

    4.2.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and4.1.4.

    Slidetheouterjointheatshrinksealingbreakoutoverthesingle-corecablesandpositionitawayfromthejointingarea.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 41UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Slidethefourpiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.

    Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.3.7.

    Slidethemechanicalconnectorontotheconductoronthepapersideofthejoint.Theconnectorisfittedwithaninserttoaccommodatesmallersectioncables;ifthecableconductorfitsintotheconnectorwiththeinsertinplace,useit-ifnot,removetheinsertanduseitwithout.

    Checkthattheconnectorbuttsupagainsttheinsulationandfinger-tightenthebolts.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 42

    Insertthesingle-corepolymericcablesintotheconnectorensuringthattheconnector buttsupagainsttheinsulationandfinger-tightenthebolts.

    Holdtheconnectorwiththeapprovedholdingtoolandtighteneachbolthalfaturnatatimewithasocketuntilitshearsoff.Startwiththeboltnearesttheinsulationateachendbeforemovingontotheothertwobolts,workingtowardsthemiddle.

    Smoothoffanysharpedgesfromtheboltsandthencleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 43UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    4.2.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)

    ThecableswillhavebeenprepareduptothepointasdescribedinSection3.1and4.1.6.

    Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.

    Positionacombinedtubeset(stresscontrol,insulatingtubeandscreenedinsulating)overeachofthesingle-corepolymericcables.

    Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors(3.1.3and3.3.7)totheconnectorinsertiondepth.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 44

    Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.

    Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.

    Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 45UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.

    Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage46

    4.2.6 Mechanical Lugs for Indoor and Outdoor Terminations

    Followthecablepreparationproceduresforpolymericcablesinsections3.1.1to3.1.3beforeinstallinganymechanicallugs.

    Eachkitcomeswiththecorrectsizeandtypeoflugforeachtermination.Removetheconductorinsulationtotheinsertiondepthofthelug.

    Placethelugovertheconductorsothatthebottomofthebarrelbuttsupagainstthecoreinsulation.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 47UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Tightentheboltsbyhandandcheckthatthepalmholeslineupwiththeirrespectiveconnectionpoint.

    Tightentheboltsuntiltheboltheadsshearoff.

    4.3 Installing Connector Stress Control and Heatshrink Insulation

    4.3.1 Single-Core Polymeric Straight Joints

    Fittheconnectoruptothepointasdescribedinsection4.2.1.

    Useachinagraphpenciltomarktheblackinsulationscreenofbothcables20mmfromthescreencut.

    Makeasecondchinagraphpencilmarkontheinsulation10mmfromthescreencut.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage48

    Stretchoneoftheshortyellowstresscontrolmasticsuppliedinthekittohalfitsoriginalwidth.Wrapitaroundthecorescreenandinsulationbetweenthetwochinagraphpencilmarks.Repeatfortheothercableside.

    Usethelongstripofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingthemastictoabouthalfitsoriginalwidth.Coveralltheconnectorareaandoverlaptotheinsulationoneachsideoftheconnectorby5mm.Makesurethereisasmoothtransitionfromtheconnectorontotheinsulation.

    Positiontheblackstresscontroltubecentrallyovertheconnectorarea.Eachendofthetubeshouldextendbeyondthescreenterminationpointsofeachcable.Shrinkthestresscontroltubingdown,startinginthecentreandworkingtowardseachendinturn.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 49UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positionthescreenedinsulatingredandblacktubecentrallyoverthestresscontroltubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.

    Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisible.

    Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresthatairinsidethetubeisexpelledasthetubeshrinks.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 50

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    4.3.2 Single-Core Transition Straight Joints

    Fittheconnectoruptothepointasdescribedinsection4.2.2.

    Wrapashortpieceoftheyellowstresscontrolmasticaroundthepapercablecoreattheedgeoftheshortblackconductingsleeve.Start20mmontheconductingtube,continuingfor10mmontotheclearbarriertube.

    Wrapashorterpieceoftheyellowstresscontrolmasticaroundthepolymericscreen,starting20mmfromthescreenedgeandcontinuingfor10mmontotheinsulation.Stretchthetapetohalfitsoriginalwidthduringthetapingprocess.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 51UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Usethelongstripsofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingittoabouthalfitsoriginalwidth.Covertheconnectorareaandoverlapontotheinsulationeachsideoftheconnectorby5mm.Makesureaminimumcoverageof2mmisachievedovertheconnectorarea.

    Pulltheblackstresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea,leavinga20mmgapbetweentheoversheathandthetubingend.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 52

    Shrinkthestresscontroltubingdownstartinginthecentre,beforeworkingtowardseachendinturn.Whenfinishedthetubingshouldbefullyshrunkandwrinklefree.

    Wrapapieceofredsealantmasticaroundeachendofthestresscontroltubing.Startfrom10mmonthestresscontroltubingandextendfor10mmontothecorescreenatbothends.

    Pulltheredinsulatingtubingfrominsidethenestedtubesetandpositionitcentrallyoverthestresscontroltube.Startshrinkinginthecentrebeforeworkingtowardseachendinturn.

    Note:Continueontothenextstepwhiletheredinsulatingtubingisstillhot.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 53UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Pulltheblackandredscreenedinsulatingtubingcentrallyovertheredinsulatingtubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisibleandthetubecannolongerbemoved.

    Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 54

    Pulltheblackcompressionsealingsleeveacrossthejointtothepapercablesideandplaceitsothatatleast50mmofleadsheathisstillvisible.

    Shrinkthetubingdown,startingonthetubesetendandworkingtowardstheleadsheath.Oncecompletedthereshouldbeapproximately50mmofleadsheathstillexposed.

    4.3.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric Cables)

    Fittheconnectoruptothepointasdescribedinsection4.2.3.

    Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 55UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Repeattheexerciseonthepapercablecore,wrappingtheyellowstresscontrolmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.

    Ensurethattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile.Usealongpieceoftheyellowstresscontrolmastictofilltheendsoftheconnectorandtheinsulationcutbackcontinuing10mmontotheinsulation,and20mmontotheconnector.Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapplyyellowstresscontrolmastictoformasmooththeprofile.

    Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage56

    Slidethestresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea.Makesurethattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentreandworkingtowardseachendinturn.

    Removethereleasepaperfromonelengthoftheredsealanttapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

    Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.

    Note:Continuewiththenextstepwhiletheredinsulatingtubingisstillhot.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 57UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positionthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubes.Startshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofeachtubeshouldnolongerbevisibleandthetubescannolongerbemoved.

    Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage58

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    4.3.4 Heatshrink Three-Core Transition Straight Joints (Three-Core PILC to Single-Core Polymeric)

    Fittheconnectoruptothepointasdescribedinsection4.2.4.

    Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

    Repeattheexerciseonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 59UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Checkthattheboltholesarefilledwiththesuppliedclaytoleaveasmoothprofile.Using alongpieceoftheyellowstresscontrolmastic,filltheendsoftheconnectorsandthe insulationcutbacks,continuing10mmontotheinsulationand20mmontotheconnector. Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapply yellowstresscontrolmastictoformaprofile.

    Removethereleasepaperfromoneoftheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludetheairasitiswrapped.Whenfinishedthepatchshouldbesmoothandwrinklefree.Repeattheprocesswithallthreeconnectors.

    Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovereachconnectorensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage60

    Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

    Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.

    Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.

    Pullthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.

    UNCO

    NTRO

    LLED

  • Section4IPage61UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddletowardstheotherendofthetubes.Stop50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage62

    Positionthethreecompressionsleevesoverthepaperendofthejoint,sothattheyequallyoverlaptheredandblackinsulationtubesandthecoretubes.Theuncoatedendofthecompressionsleeveshouldbepositionedtowardsthecentreofthejoint.Shrinkinplacestartingfromthecentreofthetubestowardsthecentreofthejointbeforefinallyshrinkingfromthecentretowardsthecrutch.

    4.3.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)

    Fittheconnectoruptothepointasdescribedin4.2.5.

    Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

    Repeatthisonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.UN

    CONT

    ROLL

    ED

  • Section4IPage63UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Checkthattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile. Usealongpieceoftheyellowstresscontrolmastictocoverbothendsoftheconnector, 20mmontheconnectorand10mmontotheinsulation.

    Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.

    Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovertheconnectorsensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage64

    Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundbothendsofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

    Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubesshouldbesmoothandwrinklefree.

    Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.

    Pullthescreenedblackandredinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.

    UNCO

    NTRO

    LLED

  • Section4IPage65UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubes.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage66

    4.4 Installing Mechanical Earth Bonds and Associated Components

    4.4.1 Single-Core Polymeric Straight Joints

    Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.1.

    Wrapthejointwithonelayerofthetinnedcoppermeshensuringthereisa50mmoverlapontotheoversheathofthecablesidewiththeshortshieldwires.

    Continueacrossthewholejointwiththetinnedcoppermeshata50%overlapandsecureontotheoppositejointside.

    Onthecablesidewiththelongscreenwires,bendthescreenwiresbackacrossthejointandformthemintotwoseparateconductors.Onthecablesidewiththeshortscreenwires,repeatthesameexerciseandfoldthegatheredwiresbacktowardsthejointcentre.

    UNCO

    NTRO

    LLED

  • Section4IPage67UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Gatherthewirestogetherandcutthemcentrallyabovethetinnedcoppermeshoverlappingthecablesheath.Installthecopperscreenwireconductorsintotheirrespectiveconnectorandtightentheboltsuntiltheheadsshearoff.

    Wrapasecondlayerofthecoppermesharoundthejoint,asbefore,sothatthewholeareaiscompletelycoveredincludingthemechanicalscreenconnectors.

    Cleananddegreasetheoutersheathsofbothcablesfor150mmfromthesheathcut.Slidethelargeoutersealingsleevecentrallyoverthejointarea.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage68

    Startshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.Allowtocoolbeforemovingorbackfillingthejoint.

    4.4.2 Single-Core Transition Joints

    Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.2.

    Wraptwolayersoftinnedcoppermeshat50%overlapoverthejointfromtheleadsheathonthepapercabletotheover-sheathcutonthepolymericcable.

    Foldbackthecopperscreenwiresoverthejointandformthemintoanearthleadexceptfortheareaovertheleadsheath.Atthispointopenupthewiresandplacethemdirectlyontothetinnedcoppermesh.Wraptherollspringoverthescreenwiresandtwistuptight.

    UNCO

    NTRO

    LLED

  • Section4IPage69UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    CompletelycovertherollspringwithtwolayersofPVCtape.

    Clean,degreaseandabradetheoutersheathsfor150mmfromthesheathcuts.Slidethelargeoutersealingsleeveoverthejointareaandstartshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.

    Allowthejointtocoolbeforemovingorbackfilling.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 70

    4.4.3 Polymeric Pot Ends

    Completethestepsinsection4.1.2.

    Laythecopperscreenwiresbackoverontothescreenedblackandredinsulatingsleeveanddistributethemaroundthecircumferenceevenly.

    Wrapthetinnedtinnedcoppermeshwitha50%overlaparoundthepotend,startingattheoutersheathandcontinuingupontothecopperscreenwires,beforecoveringtheinsulatingrod.

    Note:Thestresscontroltubingandtherodendmustbeincontactwiththetinnedcoppermesh.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 71UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Covertheendsofthecopperscreenwiresunderthetinnedcoppermeshwithtwolayers offabrictape.

    Placetheheatshrinkendcapoverthepotendandshrinkitintoplace.Startattheclosedendbeforeworkingtowardsthecablesheath.Duringtheshrinkingprocesscarefullypushtheclosedendofthecapagainsttheinsulatingendwithanappropriatetool.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 72

    Checkthattheover-sheathiscleananddegreased.Positiontheoutersealingsleeveover thepotendassemblysothatitlinesupwiththeendoftheendcap.

    Shrinkthetubingdown,startingatthecentreworkingtowardseachendinturn.Donotmoveorbackfilluntilthepotendhascooled.

    4.4.4 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.3.

    Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 73UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Laythecopperwirescreensbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthethreeearthbraidsusingthemechanicalconnectorsprovided.

    Positionthethreeearthbraidsevenlyaroundtheleadsheathareaontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.

    Wraptherollspringoverthebraidsandtwistthespringuptightly.CovertherollspringwithtwolayersofPVCtape.

    Wraptheremainingexposedleadsheathwiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 74

    4.4.5 Heatshrink Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric)

    Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.4.

    Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.

    Laythescreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperwirescreenstothethreeearthbraidsusingthemechanicalconnectorsprovided.

    Laythethreeearthleadsevenlyaroundtheleadsheathontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.Wraptherollspringoverthebraidsandtwistthespringuptightly.CoverthespringwithtwolayersofPVCtape.UN

    CONT

    ROLL

    ED

  • Section 4 I Page 75UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Applyonehalflaplayerofwhitefabrictapeoverthesingle-corepolymericendofthejointforadistanceof150mmfromthecableoversheathtoprotectthetinnedcoppermeshtapefromtheheatgeneratedbyshrinkingtheThree-Corebreakout.

    Pulltheheatshrinkbreakoutbackoverthejointasfarasitwillgoandshrinkinplace,startingwiththeturretsbeforemovingontothemainbody.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage76

    Wraptheremainingexposedleadsheathwiththestripofblackmasticsealanttape.Thisisanimportantmoistureseal.Donotleaveout.

    Positionthewraparoundheatshrinkjointsleevearoundthejointandconnectthetwoendstogetherusingthemaetalchannelandthemetaljoiningclip.

    Shrinkthewraparoundsleeveinplace,startingatthemiddlebeforemovingtowardseachendinturn.Thegreenpaintonthesurfaceofthesleeveshoulddisappearwhenthetubeiscorrectlyshrunk.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 77UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbe clearlyseenunderit.

    Donotmoveorbackfilluntilthejointhascompletelycooled.

    4.4.6 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)

    Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.5.

    Wraponelayeroftinnedcoppermeshwitha50%overlapovereachinsulatedcorecontinuingacrossthejointedcoresfromthesheathcutonthepolymericcables.Finish50mmontotheleadsheaths.

    Laythecopperscreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthreeearthbraidsusingmechanicalconnectorsprovidedinthekit.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage78

    Connecttheeachearthbraidstoeachoftheindividulleadsheathsusingatwoturnsoftherollsprings.

    Turntheendoftheearthbraidsbackoverthetwoturnsoftherollspringensuringthattheyareflatandeven.Wraptheremainderofthespringlengthoverthebraidsandtwistthespringuptightly.

    CovertherollspringswithtwolayersofPVCtape.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 79UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wraptheremainingexposedleadsheathswiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.

    4.4.7 Connection of Screen Wires on Indoor and Outdoor Terminations

    Completetheproceduresforinstallingtheterminationsdescribedinsection4.1.8.

    ConnectthescreenwirestotheEarthingstudorpositionprovided(outdoorterminations)asapplicableforthegeometryoftheapparatus.

    4.4.8 Fitting Plastic Joint Boxes (Trifurcating Joints Only)

    Trimofftheendsofthejointboxsuppliedwiththekit,sothatitwillfitoverthecablesenteringthebox.

    Usingtheboxasaguide,offerituptothecableandmarkthestandoffpositionsofthemouldingswithachinagraphpencil.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage80

    Removethebackingfromtherubberpatchessuppliedinthekitandapplycentrally(overthepreviouslymademarks)withthestickysideout.

    Placethetwohalvesofthejointshelloverthejointandclipthetwohalvestogetherwiththeclipsprovided.Checkenoughclipsareusedtostoptheresinleakingoutwhenitispouredin.

    UNCO

    NTRO

    LLED

  • Section4IPage81UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    TapethejointboxtotheincomingcablewithPVCoranothersuitabletape.Iflargegapsareleftwhentheshellisfitteditmaybenecessarytopacktheendsofthejointshelloutwiththeclaypacksuppliedinsomekits.

    Forextrasecurity,runalengthofPVCtapedowntheseamsofthejointshellandfittheplasticlid.

    4.4.9 Mixing and Installation of Polyurethane Resin

    All33kVjointsshouldbefilledwith3-partpolyurethaneresin.CheckthatthecorrectPersonalProtectiveEquipmentiswornatalltimesandtheresinisnotmixedinaconfinedspace.

    Checkthelabelonthebuckettoensurethattheresinhasnotpassedtheusebydate.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage82

    Emptythecontentsofthebucketandcheckforanydamagetothepackaging.

    Pickupthefoilbagcontainingtheresinandhardenerandapplypressuretothelargeresinpouchsothattheresinbreaksthesealbetweenthetwosectionsandmixeswiththehardener.

    Mixthecontentsofbagbykneadingthefoilbagforaminimumoftwominutes.

    UNCO

    NTRO

    LLED

  • Section4IPage83UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Carefullycutoneofthecornersoffthefoilbagandpourallthecontentsintothesuppliedplasticbucket.

    Pourapproximatelyhalfofthesandsuppliedintheplasticbagintothebucketandstiruntilitisthoroughlymixedintotheresin.

    Pourtherestofthesandintothebucketandmixuntilnorawsandisvisibleandtheresinhasnolumpsinit.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage84

    Pourthemixedresinintothejointshell.