![Page 1: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/1.jpg)
29 CFR1910.1025 Lead in General Industry
1926.62 Lead in Construction
ile, Compliance OfficerUtah OSHA – (801)530-
6901
Shaheen Safiullah
Compliance Assistance Specialist
![Page 2: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/2.jpg)
Health Effects
• Routes of Entry
• Inhalation (breathing)
• Ingestion (swallowing)
![Page 3: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/3.jpg)
Health Effects
• Acute effects– Abdominal pain
– Constipation
– Limb pain
– Hypertension
– Vomiting
– Coma
– Respiratory arrest
– Death
![Page 4: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/4.jpg)
Health Effects (contd)
• Chronic effects– Fatigue– Weight loss– Insomnia– Shaking of arms– Foot drop, wrist drop– Blue line on gums
![Page 5: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/5.jpg)
Organs and systems affected
• Blood System (heme-synthesis inhibition)
• Nervous System
• Kidneys and Liver
• Reproductive System
* Children and Lead
![Page 6: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/6.jpg)
Medical Expenses
• Higher workers compensation premium– Liability Lawsuits– Loss of Productivity– Loss in earning power– Lost time by supervision– Lost time by fellow workers– Cost of training new personnel– Economic loss to injured worker’s family
![Page 7: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/7.jpg)
Exposure Limits
• PEL (permissible exposure limit)– 50g/m3 (8-hour time weighted average)– OR, Allowable employee exposure in g/m3) =
400 divided by the number of hours worked in the day
• AL (Action Level)– 30g/m3 (8 hour time weighted average)
• Blood Lead Level (BLL)– 50 g/dl
![Page 8: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/8.jpg)
Exposure Assessment
• Employers shall initially determine if any employee may be exposed to lead at or above the action level. Do not use the protection factor of respirators during exposure assessment.– Collect personal samples representative of a full shift
• At least one sample for each job classification in each work area with the highest exposure
– Exception: Any data obtained within the past 12 months under closely resembling work conditions such as processes, type of material, control methods, work practices, environmental conditions, is acceptable in place of personal air samples in the current workplace.
![Page 9: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/9.jpg)
Construction: Provide Protection During Exposure Assessment
• Appropriate respiratory protection• Protective work clothing & equipment• Change areas• Handwashing facilities• Training• Initial medical surveillance: BLL &
ZPP
![Page 10: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/10.jpg)
Construction: Assumed Exposures >PEL but < 10X PEL
• Manual scraping/sanding• Heat gun applications• General clean up• Power tool cleaning w/dust
collection systems• Spray painting with lead-based
paint
![Page 11: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/11.jpg)
Construction: Assumed Exposures
>10X PEL but <50X PEL • Lead-containing mortar; lead burning• Rivet busting• Power tool cleaning w/out dust
collection systems• Clean up of dry expendable abrasives• Abrasive blasting enclosure movement
and removal
![Page 12: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/12.jpg)
Construction: Assumed Exposures>50X PEL
• Abrasive blasting
• Welding
• Cutting
• Torch burning
![Page 13: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/13.jpg)
Basis of initial determination
• Employer shall conduct initial monitoring based on the following observations:– Employee exposure monitoring results– Any information, observations or calculations
which would indicate lead exposure– Previous monitoring– Employee complaints of symptoms related to
lead exposure
![Page 14: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/14.jpg)
Initial determination exception• Objective data showing that a particular product containing
lead or a process, operation or activity involving lead cannot result in employee exposure to lead at or above the action level during processing, use or handling, the employer may rely upon such data instead of implementing initial monitoring. – Maintain an accurate record documenting the nature and relevancy
of objective data. This record must be maintained for 30 years.
• Any data obtained within the past 12 months under closely resembling conditions.
• Objective data cannot be used for exposure assessment during interim protection.
![Page 15: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/15.jpg)
Positive initial determination
• If there is possibility of exposure above the action level then representative monitoring must be conducted.– If above the AL but below the PEL monitoring
shall be done every 6 months– If above the PEL then every 3 months
![Page 16: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/16.jpg)
Additional Exposure Assessments Required When
• Changes that may result in increased exposure:–Equipment–Process/new task–Control–Personnel
![Page 17: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/17.jpg)
(e) Methods of compliance
![Page 18: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/18.jpg)
Hierarchy of Controls
• Goal: reduce exposures to PEL• Must institute engineering and
work practice controls• May use administrative controls• May supplement with respiratory
protection after achieving lowest feasible level
![Page 19: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/19.jpg)
Compliance Program
• Required if PEL
• Revised/updated every 6 months
![Page 20: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/20.jpg)
Compliance Program Components
• Description of lead-emitting processes– Equipment, material, controls, crew size,
job description, SOPs, maintenance procedures
• How compliance will be achieved• Technology considered to achieve PEL• Air monitoring data documenting lead
emission source• Schedule for implementation
![Page 21: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/21.jpg)
Compliance Program Components (cont’d)
• Work practice program– Protective clothing
– Housekeeping
– Hygiene facilities
– Work practices as described in App B where relevant
![Page 22: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/22.jpg)
Compliance Program Components (cont’d)
• Administrative controls– Implement a job rotation schedule:
• ID of employee
• Duration and exposure levels of each job
• Any other information useful in assessing reliability of administrative controls
![Page 23: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/23.jpg)
Compliance Program Components (cont’d)
• Arrangements made among contractors on multi-contractor sites (1926.16)
• Provisions for frequent and regular inspections of job sites, materials and equipment by a competent person
• Revise the program at least every six months
![Page 24: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/24.jpg)
No Apparent Controls for Lead Exposure
![Page 25: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/25.jpg)
Engineering ControlIsolation / Containment
![Page 26: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/26.jpg)
Engineering ControlsShrouded Tools w/HEPA
vacuum
![Page 27: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/27.jpg)
Other Engineering & Work Practice Controls
• Substitution
• Ventilation
• Processes than minimize dust generation– Chemical paint strippers
– Wet methods
![Page 28: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/28.jpg)
Chemical Paint Removers
![Page 29: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/29.jpg)
(f) Respiratory Protection
Implement a written respiratory protection program
(29 CFR 1910.134)
![Page 30: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/30.jpg)
Air-Purifying Respirator (APR)Cleanses the contaminated atmosphere
Can’t be worn: in unknown/IDLH atmospheres where prohibited
![Page 31: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/31.jpg)
Powered Air-Purifying Respirator (PAPR)
An air-purifying respirator that uses a blower to force the ambient air through air-purifying elements to the inlet covering.
![Page 32: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/32.jpg)
Atmosphere-Supplying Respirators
• Supplies breathing air
• Includes:– Supplied air
respirators– SCBA– Combination SAR /
SCBA units
![Page 33: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/33.jpg)
Two Basic Classes of Contaminants
• Aerosols/particulates–Airborne solid or liquid particles
–Dusts, fumes, mists, fog, smoke, fibers
• Gases/Vapors
![Page 34: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/34.jpg)
High Efficiency Particulate Air Filter (HEPA)
Filter that is at least 99.97% efficient in removing monodisperse particles of 0.3 micrometers in diameter.
Equivalent NIOSH 42 CFR 84 particulate filters are the N100, R100, and P100 filters.
![Page 35: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/35.jpg)
Medical Evaluations
• Before fit testing and use
• Performed by PLHCP –medical questionnaire - 1910.134
Appendix C
–an initial medical examination
![Page 36: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/36.jpg)
Fit Testing
Assess respirator fit prior to use
![Page 37: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/37.jpg)
Use of RespiratorsFacepiece Seal Protection
• No facial hair or any condition that interferes with the face-to-facepiece seal or valve function
• Corrective glasses or goggles or other PPE must be worn in a manner that does not interfere with the face-to-facepiece seal
• User seal check each time
![Page 38: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/38.jpg)
User Seal Check
An action conducted by the respirator user to determine if the respirator is properly seated to the face.
Positive Pressure Positive Pressure CheckCheck
Negative Pressure Negative Pressure CheckCheck
![Page 39: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/39.jpg)
Maintenance and Care
• Clean and disinfect• Storage
– Cartridges/filtersseparately– Plastic bags orcoffee cans
![Page 40: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/40.jpg)
Respirator Selection
• Based on exposure level
• Select using Table 1
• PAPRs must be provided if–Employee chooses and
–Provides adequate protection
![Page 41: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/41.jpg)
(g) Protective Work Clothing and Equipment
![Page 42: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/42.jpg)
Provision and Use
• Prevent employee contamination• Provide and maintain at no cost
when– > PEL– Skin/eye irritation– Interim protection
• Ensure use
![Page 43: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/43.jpg)
Cleaning & Replacement
• Clean at least weekly; daily if >200g/m3
• Remove PPE in change areas only• Put into closed, labeled containers• Inform cleaning personnel in writing• No blowing, shaking, or otherwise
dispersing in air
![Page 44: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/44.jpg)
(h) Housekeeping – for all exposures!
• Keep all surfaces free from lead• Use HEPA filter when vacuuming • Shoveling, dry or wet sweeping used only
where vacuuming or an equal method is not effective
• Compressed air not allowed unless used with exhaust ventilation system
![Page 45: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/45.jpg)
(i) Hygiene Facilities & Practices
![Page 46: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/46.jpg)
Lead on Hands & Blood Lead Levels
• Positive correlation between lead on hand tested and blood lead levels
![Page 47: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/47.jpg)
Hygiene Facilities & Practices
• Required when exposure > PEL
• No food, drinks, cigs, cosmetics – Wash hands/face prior
• Eating facilities/areas: provide– Free from lead– Enter after removing surface Pb dust
![Page 48: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/48.jpg)
Signs Required in Areas >PEL
![Page 49: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/49.jpg)
Hygiene Facilities & Practices - cont
• Provide clean change rooms– Separate work and street clothes– Ensure workers don’t wear PPE
home
• Showers: provide and ensure use when > PEL– If unfeasible, handwashing facilities– Provide cleansing agents and towels
![Page 50: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/50.jpg)
Hygiene Facilities & Practices - cont
![Page 51: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/51.jpg)
D-Lead Cleaning Products
![Page 52: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/52.jpg)
Lead Check Swabs
![Page 53: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/53.jpg)
D-Lead Lead Test Kits
Spray Solution 1, then Solution 2
Yellow means lead is present
![Page 54: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/54.jpg)
(j) Medical Surveillance
![Page 55: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/55.jpg)
Medical Surveillance
• Biological Monitoring when = or >AL–Blood lead levels (BLL)–Zinc Protoporphyrin (ZPP)
• Medical Examinations by licensed physician
![Page 56: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/56.jpg)
Medical Surveillance – cont
• When =/ > AL for more than 30 days in any consecutive 12 months
• No cost to employees, reasonable time and place
• Requirements vary according to– Workplace type– Exposure level– BLL level
![Page 57: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/57.jpg)
(k) Medical Removal Protection(MRP)
50 g/dl whole blood
![Page 58: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/58.jpg)
Temporary Removals
• Final medical determination: Any medical finding that the employee has a medical condition increasing risk of material impairment to health from exposure to lead
![Page 59: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/59.jpg)
Temporary Removals - cont
• Remove from Pb exposures 50 g/dl
• Return when two consecutive BLL tests are 40 g/dl whole blood
![Page 60: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/60.jpg)
MRP Benefits
• Maintain–Normal earnings–Seniority–Other rights and benefits
• Benefits continue for up to 18 mos on each occasion
![Page 61: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/61.jpg)
(l) Training Requirements
• Prior to start of job
• At least annually
• Extent of training depends on exposure
![Page 62: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/62.jpg)
(m) Recordkeeping
• Keep for at least 40 years or duration of employment + 20 years (30 yrs construction)– Exposure assessment data
– Objective data for monitoring exemption
– Medical surveillance ( duration of employment + 30 years, construction)
![Page 63: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance](https://reader036.vdocuments.us/reader036/viewer/2022062518/56649eb55503460f94bbd937/html5/thumbnails/63.jpg)
OSHA website
• Federal OSHA: Www.osha.gov– Click on “Technical Links” under
the outreach section
• Utah OSHA: www.uosh.utah.gov
• NIOSH: www.cdc.gov/niosh