Interim Report
Contents
1. INTRODUCTION
8
1.1 Background
8
1.2 Field Investigations
9
1.3 Bathymetry
9
1.4 cope o! this Interim Report
9
2. SITE CONDITIONS
1"
2.1 ite #ppreciation
1"
2.2 Finished Floor $evel
12
2.3 %limate
12
2.4 &ypical 'ceanographic %onditions
13
3. WATER QUALITY
14
3.1 ea(ater )uality
14
3.1.1 Importance o! ea *ater )uality
14
3.1.2 &emperature and alinity &rends
1+
3.1.3 Field Investigations
,age 1
-
8/15/2019 26122013 Interim Report 150 MLD
2/112
Interim Report
1+
3.1.4 *ater )uality -esign %riteria
18
3.2 *ater )uality &argets
2"
3.2.1 &otal -issolved olids
21
3.2.2 Boron
22
3.2.3 elly Fish Blooms
23
4. DESIGN LIFE AND AVAILABILITY; PRIMARY FLOWS
24
4.1 -esign $i!e
24
4.2 'perations and #vaila/ility
244.2.1 R' Rack %on!iguration
24
4.3 ,rimary Flo(s
2+
5. SEAWATER INTAKE
20
+.1 ,rimary Flo(s
20
+.2 Intake structure (ith creen o!!shore
20
+.3 #ctive creens /e!ore the ea *ater ,umps
28
+.4 ea *ater ,umping tation
29
+.+ hock chlorination system
,age 2
-
8/15/2019 26122013 Interim Report 150 MLD
3/112
Interim Report
32
+. Intake 'ut!all ,ipes
32
+..1 ,ipe acking
33
+..2 ain acking tation
33
+..3 Inter5acks
34
+..4 lurry ystem
34
6. PRETREATMENT SYSTEM
3+
.1 ,retreatment ,rocess
3+
.2 ea *ater )uality &reatment ,rocesses
3+.2.1 6ey *ater )uality ,arameters 7 ,re5&reatment
3+
.2.2 &he ,re5&reatment ,rocesses5 cheme
30
.3 p %orrection
30
.4 %oagulation
30
.+ Flocculation
38
. $amella ettlers
39
.0 -issolved #ir Flotation -#F:
4"
.8 ;ltra!iltration ;F:
43
,age 3
-
8/15/2019 26122013 Interim Report 150 MLD
4/112
Interim Report
.9 ;ltra!iltration *ater torage
44
7. REVERSE OSMOSIS PLANT
4+
0.1 'vervie( o! R' ,lant
4+
0.2 ,umping ystem -esign and ,ressure %ontrol
4+
0.3 %artridge Filtration
40
0.4 '
-
8/15/2019 26122013 Interim Report 150 MLD
5/112
Interim Report
8.2 -isin!ection
1
9. CHEMICAL SYSTEMS
0
9.1 #ntiscalant
8
9.2 %ar/on -io
-
8/15/2019 26122013 Interim Report 150 MLD
6/112
Interim Report
1".1 ,rocess (ater storage
09
1".2 ,rocess (ater trans!er pump station
09
11. SEAWATER OUTFALL
8"
11.1 'ut!all ,ipeline
8"
11.2 -i!!users
8"
12. POWER AND CONTROL
81
12.1 ,o(er supply
81
12.1.1 Background
81
12.1.2 -esign %onsiderations
81
12.1.3 11" k 11 k u/station (ithin the ,lant premises
82
12.1.4 ,umping station electrical (orksC controls and electrical systems
82
12.1.+ =mergency po(er generation
83
12.1. =lectrical =?uipment
83
12.2 %ontrol ystem
84
12.2.1 Aeneral -esign %riteria
84
12.2.2 ,lant 'peration ethods
8+
12.2.3 %ontrol ystem #rchitecture
,age
-
8/15/2019 26122013 Interim Report 150 MLD
7/112
Interim Report
8+
13. CIVIL, BUILDING AND STRUCTURAL WORKS
8013.1 ,lant Buildings
80
13.1.1 Aeneral
80
13.1.2 ,lat!ormsC #ccess *ays and tair(ays
88
13.1.3 $i!ting -evices
88
13.2 Road (orks
88
13.3 ite ervices
89
13.4 torm (ater -rainage
8913.+ Fire ystems
89
14. PRODUCT WATER MAIN
9"
14.1 #nneing and pump capacity !or ++" $-
9
14.1.2 ,ipe si>ing and pump capacity !or 2 D 20+ $-
99
14.1.3 ,ipe si>e and pump capacity !or 4"" $-
1"2
14.1.4 ,ipe si>e and pump capacity !or 1+" $-
1"+
15. BENEIFTS OF LONGTERM O!M CONTRACT
,age 0
-
8/15/2019 26122013 Interim Report 150 MLD
8/112
Interim Report
1"8
Executive Summary
Survey Data
Significant findings in respect of Field Work and Historical Data gathering
including the data of existing 100 MD !eemeli SW"# are as follo$ing%
1. Sea Water &uality is poor'
( )SS measured in *uly+,ugust -01. on the sea/ed offshore from erur
for the proposed 200 MD SW"#3 $as4 on average4 5.'. mg+4 and 26'5
mg+ at the surface'
( )he specification for the !emmeli desalination plant nominates a design
range for )SS of 70 mg+ to -00 mg+' 8y comparison4 the desalination
plant for Sydney is designed for )SS of 5 mg+'
( 9ntake $ater &uality data from !emmeli plant $as provided for the period
from and including May -01. to early Decem/er -01.' )he data sho$s
poor $ater &uality on a num/er of occasions as evidenced /y fre&uent
spikes in tur/idity' )hese spikes in tur/idity resulted in plant shutdo$n on
1. days in the period of record ( ie a loss of production on 5: of days of
record'
9n *uly -01. the !emmeli plant $as closed for 7 days; the $ater &uality
data sho$s that there $as no discerni/le change in salinity in this period'
9n the first $eek of Decem/er -01. the plant $as closed for 2 consecutive
days; the $ater &uality data sho$s that the salinity dropped significantly
over this period indicating the influx of fresh $ater4 $hich contained high
levels of suspended solids'
( )here is strong evidence that
-
8/15/2019 26122013 Interim Report 150 MLD
9/112
Interim Report
( 9n literature4 algal /looms have /een documented along /oth the $est and
east coasts of 9ndia' 9t can /e expected that algal /looms $ill impact upon
a desalination plant at erur from time to time'
3. ongshore sediment transport is generally to the north /et$een ,pril and
#cto/er4 and to the south from !ovem/er to March' )he influence of
littoral drift is significant and the annual net drift takes place in a northerly
direction'
re>treatment rocesses
( High levels of )SS4 algae and treatment
plant must /e designed to maintain a high &uality feed to the desalination
plant4 over the long term'
( 8ecause of the -0 mg+ of )SS4 /ut $ould not
/e capa/le of handling greater than 57 mg+ of )SS' For this reason
amella settlers4 preceded /y coagulation>flocculation and polymer
dosing have /een suggested' 9t is expected that the amella settlers $ill
significantly reduce the )SS4 /ut $ill /e only partially successful inremoving the larvae4 algae and
-
8/15/2019 26122013 Interim Report 150 MLD
10/112
Interim Report
filtration processes'
( , D,F loading rate of 6 m+hr has /een nominated4 $hen operating $ith -0:
recycle' )he nominated recycle rate is high4 cf 10 to 1- m+hr at other plants4
so as to /e a/le to handle the anticipated high solids loading rate' o$er
recycle rates $ill /e availa/le to the operator $hen the $ater &uality is good'
( )he D,F $ill /e follo$ed /y ?ltrafiltration ?F34 due to space constraints' )he
gross flux shall /e 70MH'
"# lant
Mem/rane Flux and #verall "ecovery
)he "# plant is a single stage+single pass design $ith an overall recovery of
2@: specified'
SW"# mem/rane elements of 6>inch diameter have /een selected' Each
pressure vessel $ill house eight mem/rane elements' )he design treated $ater
)DS for the "# plant is .00 mg+' 9n siAing the "# plant4 an average mem/rane
flux of approximately 1.'7 +m-+hour MH3 has /een selected' )he provision
of 6: spare space for more mem/ranes provides the flexi/ility to reduce the
flux if $arranted4 to reduce cleaning fre&uency or reduce po$er consumption'
umping System Design and ressure =ontrol
8ased on preliminary mem/rane pro
-
8/15/2019 26122013 Interim Report 150 MLD
11/112
Interim Report
suita/le to cover the re&uired mem/rane pressures for average to maximum
salinity events' For feed $aters $ith /elo$ average salinities further controls
$ill /e re&uired in the form of a H throttling valve4 essentially C/urning>off
excess energy created /y the pumping system upstream'
ota/ilisation
)his design nominates a target alkalinity of 20 to @0 mg+ as oppose to the 9S#
standard of -00 mg+ CDesira/le3' )his is /ecause at this alkalinity4 a positive
angelier 9ndex is achieved4 $hich is the minimum re&uirement for addressing
the risk of corrosive $ater' Higher target alkalinity4 $hile desira/le as it $ould
further reduce the risk of corrosive $ater /y minimising pH change in the final
$ater3 $ould re&uire additional sta/ilisation chemicals4 and therefore additional
cost' )he nominated target alkalinity thus represents a /alanced approach
/et$een $ater &uality and cost'
roduct Water Main
,ll pipes a/ove 1'1 m dia have /een proposed as =ar/on Steel $ith internal and
external lining4 $hereas all pipes /elo$ 1'1m are stated to /e Ductile 9ron $ith
internal == lining'
,age 11
-
8/15/2019 26122013 Interim Report 150 MLD
12/112
Interim Report
1. INTRODUCTION
1.1 Bac!"#$%&
%hennai etropolitan *ater upply and e(erage Board %*B: is the
statutory /ody responsi/le !or providing (ater supply and se(erage in!rastructure
to the entire city o! %hennaiC and although its present operation is limited to the
%orporation %ity limitC the Board is e
-
8/15/2019 26122013 Interim Report 150 MLD
13/112
Interim Report
# maor component o! the sea(ater ?uality assessment study is to carry out a
sea(ater ?uality monitoring program to characterise sea(ater !or the proposed
sea(ater intake as (ell !or engineering and process design o! the plant.
&o !ul!il the assignmentC data on sea (ater ?ualityC temperatureC salinityC and
seasonal (ater ?uality (as collected and is presented in sections /elo(.
1.3 Ba-/)-"/
&he data collected !rom the survey reports o! e
-
8/15/2019 26122013 Interim Report 150 MLD
14/112
Interim Report
2. SITE CONDITIONS
2.1 S(-) A")c(a-(#%
&he proposed site !or 1+" $- desalination ,lant is located (ithin the premises o!
e
-
8/15/2019 26122013 Interim Report 150 MLD
15/112
Interim Report
'(! 2S(-) #ca-(#% (- "),)c- -# "##,)& 400 MD P)"$" D),a*(%a-(#%
P*a%-
&he site !or the proposed 1+" $- is spread over an area o! around 9 acreC
placed (ithin the premises o! e
-
8/15/2019 26122013 Interim Report 150 MLD
16/112
Interim Report
2.2 '(%(,)& '*##" )+)*
&he !inished !loor level o! e
-
8/15/2019 26122013 Interim Report 150 MLD
17/112
Interim Report
'(!$") 4 Ra(%a** #%-*/ a+)"a!),
2.4 T/(ca* Oc)a%#!"a(c C#%&(-(#%,
&he oceanography o! this region is in!luenced /y 3 climatic conditions vi>.C
south(est monsoon une 7 eptem/er:C northeast monsoon id 5 'cto/er to
id 5 arch: and a !air (eather period id 5 arch to ay:. &he coast is more
in!luenced /y the northeast monsoonthan other t(o seasons. *ave action is
high during northeast monsoon and
cyclonic period. torm surge at emmeli has /een estimated to /e up to 4 metres
a/ove chart datum ie appro
-
8/15/2019 26122013 Interim Report 150 MLD
18/112
Interim Report
"# WATER QUALITY
3.1 S)aa-)" $a*(-/
3.1.1 I#"-a%c) # S)a Wa-)" $a*(-/
6no(ledge o! sea(ater ?uality and varia/ility diurnal and seasonal: is important
!or the engineering o! *R' desalination plants. &he inherent sea(ater ?uality
and composition is a !undamental !actor in the entire process technology o! a
desalination plantC !rom pre5treatment selection to process plant designC
remineralisation re?uirements and impacts on the disposal o! /rine. &hese !actors
o!ten have a decisive impact on /oth capital investment costs and operation and
maintenance e
-
8/15/2019 26122013 Interim Report 150 MLD
19/112
Interim Report
3.1.2 T))"a-$") a%& Sa*(%(-/ T")%&,
&he siteC located on the %oromandel %oast on the (estern side o! the Bay o!
BengalC e
-
8/15/2019 26122013 Interim Report 150 MLD
20/112
Interim Report
Ta;*) 1 '()*& I%+),-(!a-(#%, < S)aa-)" $a*(-/
Pa"a)-)" U%(- A+)"a!) a- S$"ac) A+)"a!) a-B#--#
1 &emp. H%: 28.4 20.9
2 &- mgl: 3+C1"" 3+C2""
3 alinity ppt: 34.0 34.0
4 p 8.2" 8.21
+ -' mgl: .1 +.89
B'- mgl: 2.+1 1.83
0 %'- mgl: 2+." 39.3
8 %olourC a>en ;nits 10.0 18.0
9 'dour 'dourless 'dourless
1" &aste alty alty11 &otal #lkalinity as %a%'3 mgl: 111.0 11."
12 &otal ardness as %a%'3 mgl: 130 "38
13 Bicar/onate mgl: 120.8 12.3
14 & mgl: 48.0 03.3
1+ &ur/idity &;: 1.1" 1.88
1 '25 mgl: ".4+ ".90
10 '35 mgl: 2.8 4."8
18 &otal itrogen mgl: 11.8 14.+
19 ,'45, moll: ".0 ".93
2" &otal phosphorus moll: 1.4+ 1.3
21 35 moll: ".2" ".18
22 agnesium as g mgl: 1191 12+8
23 %alcium as %a mgl: 30 40
24 %hloride as %l mgl: 183"2 18+"2
2+ ,otassium as 6 mgl: 30+ 391
2 ulphate as '4 mgl: 20+8 2808
20 ulphide as 2 mgl: M"."1 M"."1
28 %olloidal ilica mgl: M"."2 M"."2
29 Reactive ilica as i'2 mgl: ".84 1.38
3" Free Residual %hlorine mgl: M".2 M".2
31 Fluoride as F mgl: 1.49 1.3
32 'il @ Arease mgl: M2 M2
33 ,henolic compounds as %+'
mgl:
M"."1 M"."1
34 Barium as Ba mgl: M".+ M".+
3+ Boron as B mgl: 3.2+ 3.10
,age 2"
-
8/15/2019 26122013 Interim Report 150 MLD
21/112
Interim Report
3 %admium as %d mgl: M"."1 M"."1
30 %yanide as %n mgl: M"."+ M"."+
38 Iron as Fe mgl: M"."1 M"."1
39 $ead as ,/ mgl: M"."1 M"."1
4" anganese as n mgl: M"."+ M"."+
41 elenium as e mgl: "."22 "."23
42 &otal #rsenic as #s mgl: M"."1 M"."1
43 Ninc as Nn mgl: "."92 "."88
M indicates /elo( the detection limit.
emmeli 7 2"13G 7 Intake (ater ?uality data !rom emmeli plant (as taken !or the
period !rom and including ay 2"13 to early -ecem/er 2"13C see Figure /elo(.
&he data sho(s poor (ater ?uality on a num/er o! occasions as evidenced /y
!re?uent spikes in tur/idity. &hese spikes in tur/idity resulted in plant shutdo(n on
13 days in the period o! record 7 ie a loss o! production on 0L o! days o! record.
In uly 2"13 the emmeli plant (as closed !or + daysO the (ater ?uality data sho(s
that there (as no discerni/le change in salinity in this period. In the !irst (eek o!
-ecem/er 2"13 the plant (as closed !or 4 consecutive daysO the (ater ?uality data
sho(s that the salinity dropped signi!icantly over this period indicating the in!lu< o!
!resh (aterC (hich contained high levels o! suspended solids.
.
,age 21
-
8/15/2019 26122013 Interim Report 150 MLD
22/112
Interim Report
3.1.4 Wa-)" $a*(-/ D),(!% C"(-)"(a
&he sea (ater ?uality adopted !or design purposes is ta/ulated in and &a/le 3 andis /ased on the (ater ?uality sampling program as cited a/ove
In the PormalE values are /ased on the average data gathered !rom the !ield. &hePinimalE and Pa
-
8/15/2019 26122013 Interim Report 150 MLD
23/112
Interim Report
Ta;*) 2 S)aa-)" $a*(-/ = D),(!% C"(-)"(a
C"(-)"(a D),c"(-(#% U%(-
N#"a* = ;a,)&#% ()*&
)a,$"))%-,
M(%($ <
a-)&
Ma>($ <
a-)&*ater &emperatures
5 sur!ace H% 28.4 2." 3"."
5 /ottom H% 20.9Q 2+." 32."Q
&ur/idity &; M1" 1" 12+
&otal uspended olids mg$ 0+ +" 2""
p 8.2 0.0 8.+
&otal -issolved olids mg$ 3+C2"" 32C""" 38C"""oteG Q &he design o! the R' ,lant (ill make provision !or a rise in sea(ater temperature o! 1o%
resulting !rom the energy input at the pumps.
In &a/le 3: the design values !or the proposed plant are stated here(ith.
Ta;*) 3 S)aa-)" $a*(-/ = D),(!% C"(-)"(a = D(,,#*+)& S#*(&,
C"(-)"(a D),c"(-(#% U%(- N#"a* = ;a,)& #%a+)"a!) ()*&)a,$"))%-,
&emperature H% 20.9
&otal -issolved olids mg$ 3+C2""
Bicar/onate %'3: mg$ 12.3
agnesium as g mg$ 12+8
%alcium as %a mg$ 40
%hloride as %l mg$ 19C240
,otassium as 6 mg$ 391
ulphate as '4 mg$ 2C808
Reactive ilica as i'2 mg$ 1.38
Fluoride as F mg$ 1.3
Barium as Ba mg$ "
Boron as B mg$ 3.10
odium a mg$ 1"C089
itrate '3 mg$ 4 #mmonium mg$ ".2
,age 23
-
8/15/2019 26122013 Interim Report 150 MLD
24/112
Interim Report
3.2 Wa-)" $a*(-/ Ta"!)-,
%*B has speci!ied that the (ater ?uality targets shall /e as per I 1" +""G
1991 rea!!irmed in 1993:. &he ?uality parameters as per I 1" +"" 7 1991 are
indicated in &a/le 4. It is to /e noted that the (ater ?uality re?uirements !all into
t(o groupsC P=ssential %haracteristicsE and P-esira/le %haracteristicsE.
Ta;*) 4 D"(%(%! Wa-)" $a*(-/ R)?$("))%-, a, )" IS 10 500 = 1991
S*. N# S$;,-a%c) #" c.a"ac-)"(,-(c R)?$("))%-
E,,)%-(a* C.a"ac-)"(,-(c,
i. %olorC a>en unitsC a
-
8/15/2019 26122013 Interim Report 150 MLD
25/112
Interim Report
-
8/15/2019 26122013 Interim Report 150 MLD
26/112
Interim Report
guideline value has /een posted on the *' *ater anitation and ealth (e/site
atG (((.(ho.int(aterSsanitationShealthd(?chemicals/oronen. &he ne(
guideline value o! 2.4 mg$ (as /ased on a human health point o! vie(. &he level
(as derived /ased on an assumption that 4" per cent o! a " kg adultEs total daily
intake o! /oron is a result o! drinking 2 litre o! (ater having a /oron concentration
o! 2.4 mg$ and a Psa!ety !actorE o! "
-
8/15/2019 26122013 Interim Report 150 MLD
27/112
Interim Report
or /y letting them pass !reely. PTo prevent jelly fish from flowing in with water
current, fish netting is proposed to e installed in front of the water inta!e where
inlet velocity is low. This method is adopted at many power stations including
Tarapur "tomic #ower Station including e$isting S%R& plantsE.
4. DESIGN LIFE AND AVAILABILITY; PRIMARY
FLOWS
4.1 D),(!% ()
&he in!rastructure (ill /e designed !or a li!e in e
-
8/15/2019 26122013 Interim Report 150 MLD
28/112
Interim Report
+" years !or civil (orksC /uildings @ /uried pipeline componentsO
+" years !or concrete tanks.
2+ years !or mechanical and electrical e?uipmentO
2" years !or !le
-
8/15/2019 26122013 Interim Report 150 MLD
29/112
Interim Report
#s sho(n in &a/le + space has /een provided in the R' racks !or additional ,sC
(hich may /e installed to respond to operational and environmental changesC as
(ell as to compensate !or deviations !rom the design o! the plant or e?uipmentper!ormances. &he additional ,s (ould not /e installed to increase the capacity
o! the trains a/ove the design valueC /ut should /e used to ensure maintenance o!
the design capacity o! the trains.
&he R' /uilding (ill /e designed to house si< trainsC in a single ro(. &here shall
/e no stand/y train.
4.3 P"(a"/ '*#,
Based on the proposed operation and availa/ility o! the plant as descri/ed a/oveC
primary !lo(s have /een calculated and are ta/ulated /elo( in &a/le . It is to /e
noted that these !lo(s are not the !inal design !lo(s and can /e e
-
8/15/2019 26122013 Interim Report 150 MLD
30/112
Interim Report
Q 43L selected to provide a conservative estimate o! !lo( !or hydraulic design.
,rocess design is /ased on 4L recovery.
5. SEAWATER INTAKE
5.1 P"(a"/ '*#,
&he intake system (ill /e designed to have a hydraulic capacity o! 394 $-C
(hereas the sea (ater pumping station (ill /e designed to have a peak capacity o!
39+ $-C (herein 1." $- re?uired !or screen (ashing (ill /e returned upstream
o! screen.
&he intake conduits shall /e si>ed (ith 1"L additional capacity to take care !or
/io5gro(th (hich shall result in reduction o! carrying capacity. &here!ore the inlet
pipe shall /e si>ed !or a !lo( o! 43+ $-.
&he intake conduit shall /e o! 21"" mm I-: diameter and the outlet conduit shall
,age 3"
-
8/15/2019 26122013 Interim Report 150 MLD
31/112
Interim Report
/e o! 14"" mm I- diameter to produce 1+" $- permeate capacity. &he velocity
in the conduit at peak !lo( (ill /e 1.4+ ms. Friction losses at this velocity (ould
/e o! the order o! 1.+51. metre in a pipeline 9+" metres long.
'ne out!all (ill /e provided (ith an internal diameter o! 14"" mm. For a !lo( peak!lo( o! 242 $-C the velocity (ill /e 1.82 ms. Friction losses at this velocity (ould
/e o! the order o! 1.852." metre in a pipeline +" metres long.
&he e
-
8/15/2019 26122013 Interim Report 150 MLD
32/112
Interim Report
&he advantage o! providing the screens /e!ore the pumps is to capture the elly
!ish that /ypass the o!! shore screen and !ishing net on the shore aliveC thus
preserving the same and returning them to the sea in order to have a sustaina/le
ecosystem.
# typical /and screen installation is sho(n in '(!$") 8 /elo(.
Band screens have /een in service !or screening sea (ater !or many years. &hey
provide e!!icient removal (ith relatively lo( maintenance costs and also have
%onstruction costs that are relatively lo( as compared to the total plant cost.
&hrough5!lo( /and screens have /een proposed here(ith. &ypically mesh si>es
vary !rom 2 mm to 1" mmC andC in vie( o! the marine /iomass pro/lems at
emmeliC a mesh si>e o! 3 mm has /een selected.
Ta;*) 7 Ba%& Sc"))% D),(!% Pa"a)-)",
Pa"a)-)" U%(-, a*$)
ea(ater !lo( $- 39+
,age 32
-
8/15/2019 26122013 Interim Report 150 MLD
33/112
Interim Report
-uty 2
tand /y 1
ea *ater Flo( ,er screen $- 198
tainless teel mesh mm 3
#pproach %hannel *idth m 4."
*idth Back opening m 2.853 m
%hannel #pproach elocity ms ".8+5".9"
;pstream (ater depth m 2.2
-o(nstream (ater depth m 1.8
*ash *ater per screen $s 1+52"
5.4 S)a Wa-)" P$(%! S-a-(#%
&here shall /e one num/er o! 2C1"" mm internal diameter intake conduit. &he
conduit shall /e constructed /y pipe acking !rom an onshore pitC (hich (ill
/ecomeconverted into the sea (ater pumping station once the conduits have
/een installed.
ertical sha!t pumps in a (et (ell are particularly suita/le !or sites (ith a lo( tidal
rangeC such as is e
-
8/15/2019 26122013 Interim Report 150 MLD
34/112
Interim Report
ean $o( *ater eaps ".43 R$ 7 ".22
ean $o( *ater pring ".14 R$ 7 ".+1
'nshore survey levels are recorded as metres a/ove ean ea $evel. &husean igh *ater prings is 1.1+ 7 ".+ T R$ ".+C and ean $o( *ater prings is
".14 7 ".+ T R$ 7 ".+1.
&he lo( no !lo( level in the pump (ell has /een taken as R$ 7 ".+". #t a !lo( o!
39+ $- in intake conduitC the hydraulic grade line entering the proposed pumping
station (ill /e appro
-
8/15/2019 26122013 Interim Report 150 MLD
35/112
Interim Report
• Isolation valves along (ith !lo( meters shall /e installed main and /ranch
mani!olds.
&hese pumps are ertical &ur/ine pumps (ith large clear passages. &he intake
screen and net at the intake (ill prevent the ingress o! material like to cause a
/lockage. -esign parameters are set out in &a/le 8
Ta;*) 8 GS)a Wa-)" I%-a) P$,
Pa"a)-)" U%(-, a*$)
,umping tation %apacity $- 39+
*et *ells 5 1
-uty ,umps 5 3
tand/y 5 2
ean igh *ater prings R$ ".+
ean $o( *ater prings R$ 5 ".+1
Intake %onduit loses at peak !lo( m 1.051.8
,ipe diameter 5 ,ump to mani!old m 1.1
ain Rising main diameter m 2."
,ump house ,linth $evel R$ 0."
• Aeneric type o! pumpG vertical sha!t mounted in pump (ellC
• aterialsG super duple< stainless steelC ,=R o U 43
• =?uipment per pump unitG isolation valvesC non5return valve and magnetic !lo(
meterC
• ,ump motorsG electric varia/le speedC
• ,ump station controlG /y plant ,$% /ased upon target !lo( rateC
• ,umpe?uipment removalG /y ='&C
5.5 S#c c*#"(%a-(#% ,/,-)
# shock chlorination system is proposed to minimise marine gro(th in the inlet
,age 3+
-
8/15/2019 26122013 Interim Report 150 MLD
36/112
Interim Report
pump station and pressure main. %riteria adopted !or the shock chlorination
system are summarised /elo(O
• &ype o! chemicalG chlorine gas through acuum %hlorinate
• a< chlorine solution residual in inlet mainG 8 mglC
• in chlorine solution residual in inlet mainG 1 mglC
• -osing timeG 2 hour per dayC
• -osing pointG '!! shore inlet (ellC
• For the same 4+ kghr 3 * 1: acuum %hlorination is provided
5.6 I%-a) O$-a** P(),
acking pipes shall /e o! precast concreteC designed and manu!actured to meet
the re?uirements o!G
• B+911 peci!ication !or rein!orced concrete acking pipes (ith !le
-
8/15/2019 26122013 Interim Report 150 MLD
37/112
Interim Report
to delivery.
5.6.1 P() ac(%!
&he tunnel shall /e constructed /y pipe acking techni?ues using a purpose made
&B !or e
-
8/15/2019 26122013 Interim Report 150 MLD
38/112
Interim Report
spacing o! 3"" m. &he seal shall /e adusta/le to e
-
8/15/2019 26122013 Interim Report 150 MLD
39/112
Interim Report
6.2 S)a Wa-)" $a*(-/ T")a-)%- P"#c),,),
&he key (ater ?uality parameters relevant to the selection o! pre5treatment
processes includeG
• &otal uspended olids
• &ur/idity
• arine BiomassC elly !ishC larvae and algae
'ther relevant !actors areG
• %ape<
•'pe<
• =ase o! operation
• Ro/ustness
6.2.1 K)/ Wa-)" $a*(-/ Pa"a)-)", = P")
-
8/15/2019 26122013 Interim Report 150 MLD
40/112
Interim Report
sur!ace indicates that the suspended solids have a density slightly higher than sea
(ater. ince the sea(ater intake is located near the sea/edC the /ottom
suspended solids readings are ?uite relevant to the design o! the pre5treatment
system.
Ma"(%) B(#a,,
arine /iomass includes elly !ishC larvae and algae. &he presence o! these
materials is highly varia/le and dependent on seasonC temperature and the
presence o! nutrients.
o(everC operational e
-
8/15/2019 26122013 Interim Report 150 MLD
41/112
Interim Report
6.3 C#"")c-(#%
&he sea(ater (ill /e dosed (ith acid to achieve the optimum p !or coagulation.
&he dosing system (ill consist o! duty and stand/y dosing lances into each pre5
treatment train. &he p correction design parameters are summarised in &a/le9 /elo(.
Ta;*) 9 C#"")c-(#% D),(!% Pa"a)-)",
Pa"a)-)" U%(-, a*$)
-esign ma
-
8/15/2019 26122013 Interim Report 150 MLD
42/112
Interim Report
&herea!ter the !locs are removed /y processes such as !loatation and !iltration.
%oagulant (ill /e dosed at the head o! $amella ettler /lock. Rapid mi(%! D),(!% Pa"a)-)",
Pa"a)-)" U%(-, a*$)
-esign ma
-
8/15/2019 26122013 Interim Report 150 MLD
43/112
Interim Report
&ype o! mi
-
8/15/2019 26122013 Interim Report 150 MLD
44/112
Interim Report
o. o! settlers os. 8
$amella &ype and aterial ,lates&u/es made !rom FR,
(ith ++"5"" inclination (ith
hori>ontal
$amella ur!ace loading rate
vertically proected sur!ace area:
mhr M1+
$amella upports %oncrete
Bottom ludge Removal%hain and !light scrapers or
hydraulic vacuumO material o!
construction to /e suita/le !or
sea(ater
%lari!ied (ater collection%oncrete troughs (ith
triangular FR, (eir plates
6.7 D(,,#*+)& A(" '*#-a-(#% DA'
-issolved air !loatation -#F: is a high rate process using micro5/u//les to !loat
coagulated and !locculated particles to the sur!ace o! a clari!ication /asin. #
portion o! the clari!ied (ater is dra(n o!! and passed through a pressure vessel
(here the (ater is saturated (ith air at high pressure. &he pressuri>ed (aterC
supersaturated (ith airC is released into the (ater as it enters the /ottom o! the
/asin. &he sudden release o! pressure causes the !ormation o! micro5/u//les
(hich attach to the pre!ormed !loc and carry it to the sur!ace (here it !orms a thick
!loating layer. &he !loat is skimmed o!!C and the clari!ied (ater passes to !iltration.
-#F in general ade?uately removes & o! 0+ mg$C /ut a/ove 1"" mg$ there is
likely to /e a higher carryover o! solids to the !iltersC resulting in shorter run times.
&he potential !or short !ilter runs can /e o!!set to some e
-
8/15/2019 26122013 Interim Report 150 MLD
45/112
Interim Report
permitsC pilot plant testing at siteC should /e carried out to provide data on the most
suita/le loading rate.
-#F a !orm o! physical treatment o! (ater that involves coagulating impurities then
removing these solids /y using dissolved air to !loat them to the sur!ace o! the(ater. Residual !ine particles that are not !loated o!! are removed /y the !iltration
do(nstream.
&he !lotation cell also re?uires occasional sludge removal to remove settled solids.
&he -#F process is proven across the glo/e !or a range o! (ater treatment
applications including as a pre5treatment process in sea (ater desalination plants
!or removal o! !ine solids and organics. It also copes (ell (ith algae /ecause it is
removed in the !lotation stepC eliminating the possi/ility o! !ilter /linding. #simpli!ied cross sectional schematic is as sho(n /elo(.
Flocculation
Flotation
Raw
water
Air saturated water
Filtered water
Sludge
Filtration
Flocculation
Flotation
Raw
water
Air saturated water
Filtered water
Sludge
Filtration
.
Ta;*) 123 D(,,#*+)& A(" '*#-a-(#% D),(!% Pa"a)-)",
Pa"a)-)" U%(-, a*$)
-esign sea(ater !lo( $- 39+ (ithout recycle$- 404 (ith recycle
um/er o! -#F %ells o. 22
-#F sur!ace loading
rate
#ll units online mhr 8 (ith recycle:
'ne unit o!!line mhr 8.+ (ith recycle:
-#F area per cell m2 9+
-#F Recycle Rate L 2"
-#F #ir -ose Rate mg$ 1"
,age 4+
-
8/15/2019 26122013 Interim Report 150 MLD
46/112
Interim Report
Pa"a)-)" U%(-, a*$)
#ir aturator =!!iciency L 9"
#ir aturator ,ressure Aauge: k,a 8"" nominal:
um/er o! air saturator o. 22
aturator volume $ 0C+"" at 9" s detention time 5
+"L !ull at 2"L recycle:
Float Removal &ype ydraulic !loat removal and (eir:
-#F recycle (ater (ill /e dra(n !rom the R' !ed tank i.e. ;F !iltered (ater.
6.8 U*-"a(*-"a-(#% U'
em/rane !iltration involves passing the (ater to /e treated through a thin polymer
!ilm called the Vmem/raneW. &he !iltration process is loosely re!erred to as
micro!iltration i! the si>e o! pores in the mem/rane is a/out ".2 micron.
I! the pores are smaller than approontal con!igurations are
,age 4
-
8/15/2019 26122013 Interim Report 150 MLD
47/112
Interim Report
possi/le in ;F like R'. ,ressure systems are typically supplied as modular skid
mounted systems (ith skids varying in si>e depending on the duty re?uirement.
Ta;*) 14 U*-"a '(*-"a-(#% D),(!% Pa"a)-)",
'*# -# S)*<
C*)a%,(%! (*-)",
MD 388
A,,$)& ")c#+)"/ "# (*-)", 99.5
'*# (%*)- -# U' MD 386
U' R)c#+)"/ Ra-) : 92.5
'*$> MH 50
T#-a* N$;)" #
,(&,
!os' 32
D$-/ !os' 30
S-a%&;/ !os' 2
'*# Ra-) -# RO MD 356
A")a # )ac ,(& m- 17.5 > 4.5
I%(-(a* TMP 8ar 0.5
6.9 U*-"a(*-"a-(#% Wa-)" S-#"a!)
Filtered (ater i.e. ;F permeate storage (ill /e located immediately do(nstream o!
the ;F unit. &his (ill serve as !eed tank to Reverse 'smosis.
&he tank has /een si>ed to provide t(enty minutes storage at a sea(ater !lo( o!
388 $-.&he /ack(ash (ater !or ;F shall also /e (ithdra(n !rom the same tank.
&he design parameters !or the Filtered ea(ater torage &anks are summarised in
&a/le /elo(.
'(*-)")& S)aa-)" S-#"a!) D),(!% Pa"a)-)",
Pa"a)-)" U%(-, a*$)
-esign sea(ater !lo( $- 388
,age 40
-
8/15/2019 26122013 Interim Report 150 MLD
48/112
Interim Report
um/er o! tanks o. 1
Fill time min 2"
%apacity $tank +.+
,age 48
-
8/15/2019 26122013 Interim Report 150 MLD
49/112
Interim Report
7. REVERSE OSMOSIS PLANT
7.1 O+)"+() # RO P*a%-
&he R' plant (ill /e a single stagesingle pass design (ith an overall recovery o!
4L.
&he plant (ill /e con!igured as si< num/ers o! individual trains. =ach o! the si< R'
trains (ill consist o! one R' rack eachC (ith dedicated pumping system and
=nergy Recover -evices =R-s:. &he plant is to /e designed such that !ull
production can /e achieved through si< trains. &he trains (ill /e con!igured to
allo( !or each individual train to /e isolated !or cleaningC maintenanceC or mem/rane replacement. o(ever 2 sets o! stand/y =R-C ,, and /ooster
pumps have /een proposed.
*R' mem/rane elements o! 85inch diameter have /een selected. =ach
pressure vessel (ill house eight mem/rane elements.
&he design treated (ater &- !or the R' plant is 3"" mg$. o allo(ance has
/een made in the R' plant layout !or a second pass R' system.
In si>ing the R' plant an average mem/rane !lu< o! appro
-
8/15/2019 26122013 Interim Report 150 MLD
50/112
Interim Report
;nder such design the R' Booster pumps (ould provide !eed pressure
adustments suita/le to cover the re?uired mem/rane pressures !or average to
ma
-
8/15/2019 26122013 Interim Report 150 MLD
51/112
Interim Report
,re!erence to have maority o! pumping capacity driven /y a !i
-
8/15/2019 26122013 Interim Report 150 MLD
52/112
Interim Report
Ta;*) 15 RO a%& ERD '))& B##,-)" P$, D),(!% Pa"a)-)",
Pa"a)-)" U%(- RO '))& B##,-)"
P$
ERD '))& B##,-)"
P$
um/er o! pumps per R' train o. 1 1
&otal num/er o! pumps !or 1+"
$- module
o. 8 8
a
-
8/15/2019 26122013 Interim Report 150 MLD
53/112
Interim Report
Ta;*) 16 (! P"),,$") P$, D),(!% Pa"a)-)",
Pa"a)-)" U%(- a*$)
um/er o! pumps per R' train o. 1
&otal num/er o! pumps o. 8
a
-
8/15/2019 26122013 Interim Report 150 MLD
54/112
Interim Report
Ta;*) 18 ERD B##,-)" P$, D),(!% Pa"a)-)",
Pa"a)-)" U%(- a*$)
um/er o! pumps per R' train o. 1
,age +4
Pa"a)-)" U%(- a*$)
um/er o! =R- systems per R' train o. 1
&otal num/er o! =R- systems o. 8
um/er o! =R- units per system o. +
&otal num/er o! units o. 4"
&ype o! system 5 Iso/aric ystem
&ype o! energy recovery device 5 -*==R
anu!acturer o! device 5 %alder #A
-esign !lo( rate Brine: $- ." per -*==R unit:
$s 9
a
-
8/15/2019 26122013 Interim Report 150 MLD
55/112
-
8/15/2019 26122013 Interim Report 150 MLD
56/112
Interim Report
um/er o! R' racks o.
R' ,lant Recovery L 4
aterial o! mem/ranes ,olyamide
&ype o! mem/ranemodule 8 inch spiral (ound
em/rane manu!acturer ydranauticsC -o(
#ctive area per mem/rane element m2 41 44" !t2:
R' mem/rane !lu< rate ormal $ 13.+
a
-
8/15/2019 26122013 Interim Report 150 MLD
57/112
Interim Report
&he piping material !or the R' system is as sho(n in &a/le 2"
Ta;*) 20 P((%! a-)"(a*,
P((%! Ma-)"(a*
igh pressure !eed piping tainless steelC super
duple
-
8/15/2019 26122013 Interim Report 150 MLD
58/112
Interim Report
same time. &he amount and type o! cleaning chemical re?uired (ould vary
depending upon the degree o! mem/rane !ouling and the nature o! the !ouling.
-epending on the mem/rane selectedC the system may /e designed to ena/le
cleaning o! the R' system !rom /oth directionsC i.e. !rom the !ront to the /ack and
!rom the /ack to the !ront. &his (ould allo( employing speci!ic cleaning
procedures !or a particular type o! !ouling scaling. &he %I, system (ill /e si>ed
to clean each individual R' rack separately. &he systemC including the chemicals
!or the %I, (ill /e located in a dedicated /uilding located ne
-
8/15/2019 26122013 Interim Report 150 MLD
59/112
Interim Report
Pa"a)-)" U%(- a*$)
um/er o! pumps o. 2*1
Flo( capacity o! each pump $s 3""
,umping head /ar 1"
um/er o! stages o. 1
-esign parameters !or the !lushing pumps are sho(n in &a/le 23.
Ta;*) 23 '*$,(%! P$, D),(!% Pa"a)-)",
Pa"a)-)" U%(- a*$)
um/er o! pumps o. 1*1
Flo( capacity o! each pump $s 29+
,umping head m 3
um/er o! stages o. 1
7.9 P)")a-) S-#"a!)
'ne permeate storage tanks (ill /e located immediately do(nstream o! the R'
plant. &he tanks have /een si>ed !or at least 2" min storage at the ma
-
8/15/2019 26122013 Interim Report 150 MLD
60/112
Interim Report
,age "
-
8/15/2019 26122013 Interim Report 150 MLD
61/112
Interim Report
8. POST TREATMENT
,ost treatment o! permeate is re?uired to meet the statutory product (ater ?ualityre?uirements. ,ost treatment (ill consist o! remineralisationsta/ilisation and
disin!ection o! the (ater.
8.1 R)
-
8/15/2019 26122013 Interim Report 150 MLD
62/112
Interim Report
8.1.2 /&"a-)& () G Ca";#% D(#>(&)
*ater shall /e sta/ilised /y the addition o! car/on dioation.
=?uipment typically re?uired !or dosing o! lime (ould consist o!G lime storage silosC
mi
-
8/15/2019 26122013 Interim Report 150 MLD
63/112
Interim Report
and alkalinity /y 1." mg$ as %a%'3: each. &here!oreC !or a target
recommended dosage o! alkalinity and hardness in the product (ater o! 1"" mg$C
the (ater produced /y the desalination system (ill need to /e treated (ith 04 mg$
o! lime and 88 mg$ o! car/on dio
-
8/15/2019 26122013 Interim Report 150 MLD
64/112
Interim Report
%ar/on dioer
&ype =lectric
%apacityC horsepo(erkg
%'2.day
"."37"."+
-elivery pressuretemperatureC
/arsH%
3 /ars12H%
apor eater
&ype =lectric
%apacityC horsepo(erkg
%'2.day
"."17"."2
K)/ &),(!% C"(-)"(a Ca";#% D(#>(&) a%& '))& S/,-)
&he dosage o! car/on dio
-
8/15/2019 26122013 Interim Report 150 MLD
65/112
Interim Report
proportionally to the desalinated (ater !lo( rate /y !lo( control valves installed on
the gas !eed lines !rom the vapori>er to the point o! chlorine dioone slo(ly /ecoming more popular. %hlorine dio
-
8/15/2019 26122013 Interim Report 150 MLD
66/112
Interim Report
micro/iological contamination. &he reverse osmosis treatment process (ill remove
the maority o! organic matter present. &his results in a limited amount o! short
chain car/on compounds availa/le as a !ood source !or micro5organism gro(th.
o(ever to have a residual chlorine in the distri/ution net(ork chlorination isenvisaged !or the treated (ater out o! the proposed plant.
Theory of disinfection and 'hlorination
&he rate o! change in the num/er o! via/le organisms is the product o! the reaction
rate constant !or particular disin!ectants and the num/er o! via/le organisms
&e//uttC 1992:. It is e
-
8/15/2019 26122013 Interim Report 150 MLD
67/112
Interim Report
Rearranging the !ormula to determine the time re?uired !or the ade?uate disin!ection is
eero no matter ho( much
disin!ected the (ater isC the percentage o! removing micro5organisms can never /e 1""L.
o(everC maority o! the (ater treatment plants must /e a/le to remove or inactivate
99.9L 35log: o! Aiardia cysts and 99.99L 45log: o! viruses %ritttenden et al.C 2""+:.
ome micro5organisms are more vulnera/le and have less resistance to certain
disin!ectants there!ore only 9"L 15log: reduction is re?uired.
For e!!ective disin!ection there are numerous parameters that are re?uired !or killing
or inactivating micro5organisms. &his includes the residual concentrationC the time at
(hich the (ater is in contact (ith the disin!ectantC the (ater temperatureC the p /alanceC
and the type o! disin!ection used.
I! the concentration o! disin!ectantC %C measured in milligrams per litre mgl:C and
the contact timeC &C measured in minutesC are multiplied together it (ill produce a
value kno(n as the %& value. &his value is re?uired to produce ade?uate parameters in
order to achieve the re?uired log re?uirements. -i!!erent micro5organisms (ill re?uire
di!!erent %& values there!oreC in generalC the contact time and the concentration o! the
disin!ectant must /e a/le to remove the most resistant o! the micro5organisms. It is
important !or the (ater system to have an ade?uate %& value so that the (ater is treated
properly /e!ore /eing distri/uted.
In alkaline conditionsC chlorine is more
e!!ective and in acid conditionsC the
hypochlorous acid is more e!!ective.
&here!ore it is recommended that the
typical p !or disin!ection should /e
lessmthan 8 and i! chlorine is usedC
then a lo(er p is /etter.
%hloramineC (hich can /e !ormed
during a chlorine and ammonia
-
8/15/2019 26122013 Interim Report 150 MLD
68/112
Interim Report
chemical reactionC is a com/ined residual chlorine and is also an use!ul disin!ectant.
Break point occurs once all the ammonia is reacted and the com/ined residual
chlorine is converted /ack to !ree chlorine Re!er !igure a/ove:. Increasing the chlorine
concentration also increases the !ree5chlorine residualC ho(ever increasing it /eyond the
/reak point is counterproductive due to the production o! nitrogen and nitrogen tri5
chlorideC chemicals that have a strong unpleasant odour.
&he /reak point is a good indicator (hen to supply su!!icient amounts o! chlorine to remove
any eardous properties o! chlorine and should have a
good grasp o! the /asis o! preventive measures. &his (ill make them more conscious
a/out sa!ety (hich (ould not /e achieved i! they are trained to !ollo( certain instructions
mechanically. In IndiaC %hlorine is deemed to /e^ an e
-
8/15/2019 26122013 Interim Report 150 MLD
69/112
Interim Report
Aovernment o! IndiaC it is necessary to o/tain a storage license (hen !ive or more
containers are to /e stored. For o/taining the storage license sa!ety e?uipments are
essential along (ith scru//er system. #lso the /uilding has to /e constructed as per
norms suita/le !or storing toardous
%hemicals RulesC 1989 ma
-
8/15/2019 26122013 Interim Report 150 MLD
70/112
Interim Report
S)c((ca-(#% # C*#"(%) T#%%)"
*ater %apacity appro
-
8/15/2019 26122013 Interim Report 150 MLD
71/112
Interim Report
%hlorine Aas ,ost treatment !or disin!ection
process @ pota/le product (aters:
Ferric %hloride %oagulant
ydrated $ime ,ost treatment !or (ater sta/ilisation
Flotation #id 5 ,olyelectrolyte -#F !locculation aid
%lari!icationFiltration #id 5
,olyelectrolyte
$ime(ater clari!ication aid
odium ydro
-
8/15/2019 26122013 Interim Report 150 MLD
72/112
Interim Report
*# "a-)
A%-(,ca*a%- c#%c)%-"a-(#% 100
'#" # ,$*/ 1000 IBCD#,) "a-) ! 0.7
D#,(%! #(%- RO (! P"),,$")
P$ ,$c-(#% a(%
A%-(,ca*a%- c#%,$-(#% !&a/ 250
S)c((c !"a+(-/ # ,(%!
,#*$-(#%
1.2
D#,(%! *# "a-) #
a%-(,ca*a%-
" 9
N$;)" # ,(%! $, D$-/ N#. 5
S-a%&;/ N#. 3
D#,(%! $ caac(-/ " 2
N$;)" # a%-(,ca*a%- ,-#"a!) -a%, N#. N#%) = &(")c- ))&
"# IBC
It is not proposed to dilute the antiscalant as the !lo( rates involved can /e easily
dosed accurately and dilution can lead to degradation o! the antiscalant. #de?uate
mi(&) D#,(%! U%(-, a*$)
-
8/15/2019 26122013 Interim Report 150 MLD
73/112
Interim Report
%ar/on -io
-
8/15/2019 26122013 Interim Report 150 MLD
74/112
Interim Report
&otal %hlorine %onsumption ae kg 9""
a
-
8/15/2019 26122013 Interim Report 150 MLD
75/112
Interim Report
lime (ater /e!ore dosing to permeate upstream o! product (ater. $ime does not
dissolve ?uickly in (ater and is di!!icult to handle. $ime is mi
-
8/15/2019 26122013 Interim Report 150 MLD
76/112
Interim Report
!locculation tank. &he speci!ic polymer to /e used (ill /e determined during a later
design stage. &he dosing design parameters are summarised in ta/le 34
Ta;*) 34 '*#-a-(#% A(& P#*/)*)c-"#*/-) D#,(%! D),(!% Pa"a)-)",
Pa"a)-)", U%(-, a*$)
-esign sea(ater !lo( $d 39+
,oly olution trength ominal L (v ".1 7 ".+
-osing $ocation ;s o! $amella
;s o! -#F
-ose Rate per dosing
point:
inimum mg$ "."+
a(&) D#,(%!
Pa"a)-)" U%(-, a*$)
ydro
-
8/15/2019 26122013 Interim Report 150 MLD
77/112
Interim Report
o. o! &anks o 2
&ank olume 6$tank 1+"
-osage location Inlet o! %artridge !ilter -osage 2+ ml average
9.8 S#&($ M)-a;(,$*(-)
odium /isulphite B: a'3: (ill /e prepared /y dissolving sodium
meta/isulphite B: a22'+: in (ater. -osing o! /isulphite is re?uired to
remove residual chlorine !rom the system resulting !rom intake shock dosing as
(ell as to neutralise o
-
8/15/2019 26122013 Interim Report 150 MLD
78/112
Interim Report
o o! -osing pump 9 *4
%apacity o! each pump 12+ $hr
9.9 S$*$"(c Ac(&
&he sulphuric acid (ill /e used to provide p correction !or optimum sea(ater
coagulation. In addition sulphuric acid is re?uired !or chemical enhanced
/ack(ashing and cleaning o! the ;F mem/ranes. &he design parameters are
summarised in &a/le 30.
Ta;*) 37 S$*$"(c Ac(& S/,-) D),(!% Pa"a)-)",
Pa"a)-)" a*$)
ulphuric acid concentration L (( 98
peci!ic gravity o! dosing
solution
1.84
S)aa-)" C#"")c-(#%
-esign sea(ater !lo( 39+
-ose rate &ypical 3+
-osing !lo( rate o! chemical &ypical 3+" $hr.
-osing point ea(ater intake pipeline
upstream o! coagulant dosing
-
8/15/2019 26122013 Interim Report 150 MLD
79/112
Interim Report
9.10 U*-"a '(*-"a-(#% C)(ca*,
Ta;*) 38 U*-"a '(*-"a-(#% c)(ca* U,a!),
Pa"a)-)" a*$)
'
-
8/15/2019 26122013 Interim Report 150 MLD
80/112
Interim Report
Aeneral storage space only has /een included !or these chemicals /ecauseG
It (ill not /e kno(n until the !irst year or t(o: o! operation (hich o! the
chemicals are re?uiredO
&he chemicals are used in!re?uently say once per year:O and
*hen usedC only small volume o! chemical is used each time.
&he !acility (ill /e designed to meet the re?uirements o! all o! the chemicals that
may /e used. Bet(een usesC the !acility (ill need to /e drained and !lushed.
-esign details are provided in the !ollo(ing ta/le.
Ta;*) 39 M(,c)**a%)#$, CIP C)(ca* D#,(%! S/,-) D),(!% Pa"a)-)",
Pa"a)-)" U%(-, a*$)
-osing point R' %I, &ank
peci!ic gravity o! dosing solution varies
um/er o! dosing pumps -uty o. 1
tand/y o. 1
-osing pump capacity k$hr 2
um/er o! tanks o. 2
&ank volume k$tank 3
%hemical delivery volumes ultiple 1"""$ IB%s
9.11.1 C*)a%(%!
-
8/15/2019 26122013 Interim Report 150 MLD
81/112
Interim Report
!eaturesG
• ake5up tankO
•
%hemical storage and dosing !acilities !or the preparation o! various cleaningsolutions typically includes %austic odaC %itric #cidC a--C odium
Bisulphite:O
• Recycling pumpsO
• %artridge !ilter typically + micron:O
• ,ipe(ork allo(ing each R' train to /e cleaned individuallyO and
•
I! re?uiredC holding tank to neutralise spent cleaning solution and ena/ledischarge to environment.
9.11.2 '*$,(%!
#!ter chemical cleaning and prior shutdo(n o! mem/rane trains the /rine and
spent cleaning solution should /e !lushed out o! the R' and =R- racks using R'
permeate. Flushing prior train shutdo(n (ill reduce potential !or scale /uild up and
corrosion.
&he !lushing system (ould consist o! !lushing pumps and pipe(ork allo(ing each
R' train to /e !lushed individually.
-
8/15/2019 26122013 Interim Report 150 MLD
82/112
Interim Report
% WATER STORAGE AND TRANSFER
10.1 P"#c),, a-)" ,-#"a!)
&reated process (ater (ill /e stored on site prior to /eing trans!erred to the city !or
consumption. &he criteria !or the storage tank are summarised /elo(O
&otal usa/le storage volume 2+" 3
um/er o! units G 1 < .2+$ 1 hours storage !or 1+" $- average !lo(:C
aterial o! construction G R%% epo
-
8/15/2019 26122013 Interim Report 150 MLD
83/112
Interim Report
• ,eak Flo( G 242 $-C
• -iameterG 14"" mm I- R%% pipe
• a< (orking pressure including (ater hammer allo(ance:G
2"m headC
ote Q
&he head re?uired to discharge sea(ater concentrate is provided /y the residual sea(ater
concentrate pressure a!ter the reverse osmosis process. &his pressure (ould other(ise /e !ully
recovered and there!ore has to /e supplemented to make up !or the loss o! head to the outlet
pipeline. &he out!all pipeline can there!ore /e considered as consuming energy as (ith a pump
station: (ith an associated operating cost.
11.2 D($,)",
&he outlet pipeline (ill discharge sea(ater concentrate and other (aste !lo(s into
the ocean via a system o! di!!users. &hese comprise a large num/er o! small
diameter no>>les discharging ets o! sea(ater concentrate !rom the sea/ed into
the (ater /ody to entrain dilution !lo(s. *ider dispersion o! the saline plume is
achieved through the action o! (indC (aves and currents. Both the sea(ater
concentrate ets and the dispersion (ill /e modelled using appropriate computer models. &he adopted criteria !or the di!!user design is summarised as !ollo(sO
• Flo( range ` peak G 242 $-C
• -ischarge temperature rangeG "% U 3% a/ove am/ientC
• -ischarge salinity rangeG 32C+""mgl 534C+""mgl a/ove
am/ientC
• &arget dilutionG +L a/ove am/ient salinityC
• *ater depthG U +m (ith no sur!ace e
-
8/15/2019 26122013 Interim Report 150 MLD
84/112
Interim Report
12.1.1 Bac!"#$%&
&he po(er supply arrangement !or the desalination plant is /ased on provision o!
one nos 1 no.: 11" k !eeders !rom a su/station ne
-
8/15/2019 26122013 Interim Report 150 MLD
85/112
Interim Report
=arthing
,rotection
(itchgearC etc.
I=% Rules re?uirements (ill also /e considered in the design.
12.1.3 110 11 S$;,-a-(#% (-(% -) P*a%- ")(,),
# 11" k 11 k trans!ormer shall /e provided !or the electrical supply to the
sea(ater intake pumpsC the reverse osmosis high pressure pumps and the
process (ater trans!er pumps. &he $.& supply shall /e !rom & ,anels. &his
su/station (ill /e a dou/le /us /ar Aas Insulated ystem type AI: /uilt (ith the
latest technologiesC ma
-
8/15/2019 26122013 Interim Report 150 MLD
86/112
Interim Report
inimum cross sectionG po(er 2C+ mm
,o(er !actor measured in 11k (ill /e more than ".9+ (ith !ilters i! necessary.
12.1.5 E)"!)%c/ #)" !)%)"a-(#%
Battery /acked ;, systems (ill /e provided !or instrumentationC telemetryC
emergency lighting and communication systems.
&he -% and ;, system shall /e redundant 2 < 1""L /atteriesC 2 < 1""L
22"-% recti!iersC 2 < 1""L 24-% convertersC 2 < 1""L 23"# inverters:C -%
system shall /e si>ed !or a minimum period o! 2 hour o! stand/y operation.
'ne emergency diesel generator =-A: set shall /e provided. &he =-A shall /e
mounted in an outdoor soundproo! metallic canopy (ith anti5vi/ration supports and
a high grade eardC ca/le trays (ill /e
protected /y sheet steel covers. &he ca/le inlet to the e?uipment (ill /e protected
(ith tight stu!!ing /o
-
8/15/2019 26122013 Interim Report 150 MLD
87/112
Interim Report
control system and the design (ill take into account the !ollo(ing re?uirementsG
&he ,rocess %ontrol ystem ,%: architecture covering the connection o! !ield
instrumentsC controllers and associated inputoutput I':C uman achine
Inter!aces I:C communication net(orks and net(ork e?uipment (ill /e
designed !or a process plant availa/ility o! at least 98L. &his implies that that
the control system itsel! (ill have a system availa/ility o! at least 99.9LO
;se o! e?uipment (ith a proven track recordO
,rovision o! redundancy !or critical itemsO
Redundant controllersC net(orksC po(er supplies in all locationsO
=nsuring maintaina/ility o! selected e?uipment and standardisation o! e?uipment
and sparesO
Fi/re optic (ill /e provided as the primary /earer to link all units.
,rocess controls and e?uipment designed to !ail to the sa!est conditionO
I' @ instrument voltages selected to suit e?uipment and provided (ith /attery
/ackup.
#ll on site po(erC control and communication ca/les to /e run in accordance (ith
current industry practicesC codesC standards and regulationsO
;ninterrupti/le po(er supply ;,: provided to all critical items instrumentsC
control systems and telecommunications systems (ith a one hour /attery /ack5
up (ith emergency po(er supply to ;,Es (ithin 1+ minutes:.
Field instrumentation (ill /e rated I,+ and (ill have outdoor housing protection
!rom (eather.
$ightning protection (ill /e provided !or all !acilities. urge protection is to /e
considered !or all !acilities to provide protection to communications and other
electronic /ased e?uipment.
12.2.2 P*a%- O)"a-(#% M)-#&,
&he !ollo(ing aspects o! the plant operation (ill /e taken into account in the design
o! the control systemC alarm systemC supervisory system and system
communications.
-
8/15/2019 26122013 Interim Report 150 MLD
88/112
Interim Report
#ll plant operations (ill /e designed !or automatic operation and minimal
re?uirement !or manual interventionO
&he desalination plant and process (ater pump station (ill /e monitored 24
hours per dayO
'utside o! the manned hours o! the desalination plant and pump stationC
operations or maintenance (ill only /e in response to automated alarm
noti!ication to nominated personnel on callO
For /ackup to the automated alarm noti!ication outside o! manned hoursC the site
(ill also have 24 hour monitoring o! all operating parameters and alarmsO
'perating protocols (ill /e esta/lished such that only the desalination plant (ill
have control Vo(nershipW o! the complete (ater supply system.
12.2.3 C#%-"#* S/,-) A"c(-)c-$")
&he !ollo(ing are the minimum re?uirements o! the control systemG
&he desalination plant (ill /e controlled /y its o(n stand alone control system.
&his (ill include all e?uipmentC ca/lingC /uildings and services necessary !or a
complete systemO
&he ,rocess %ontrol ystem ,%: (ill /e o! the same manu!acturerC makeC
modelC !irm(are as that used !or the magnetite process plant and (ill !ollo( the
same con!iguration programming criteria and standardsO
&he %ontroller architectureC communication protocol and ca/ling selected (ill /e
suita/le !or the application and control system re?uirements in terms o!
!unctionalityC speedC dura/ilityC o!! site monitoring and control re?uirementsC
servicea/ilityC and local supportO
&he I inter!ace system on site (ill /e suita/le !or the applicationC control
system re?uirements in terms o! !unctionalityC speedC dura/ilityC local supportO
#ll I systems (ill display alarmsC alarm histories and trends. #ll data must /e
stored !or more than t(elve monthsO
#ll ,% and communication systems (ill have at least 2"L spare memoryC I'
and communication capacityO
=ach controlla/le drive (ill have a local control station comprising an emergency
-
8/15/2019 26122013 Interim Report 150 MLD
89/112
Interim Report
stop hard (ired in the emergency stop circuitry !or the drive (hich is not
disa/led in auto mode:C a local stop /utton and a local start /utton !or starting
the motor under maintenance manual mode o! operation:. &his local control
station (ill include a og /utton (hen appropriate !or some mechanical
e?uipmentO
&he ,% (ill incorporate monitoring o! key alarms !or other plant au
-
8/15/2019 26122013 Interim Report 150 MLD
90/112
Interim Report
%"# CIVIL, BUILDING AND STRUCTURAL WORKS
13.1 P*a%- B$(*&(%!,
13.1.1 F)%)"a*
&he desalination plant (ill include the !ollo(ing /uildingsG
Intake ,ump ouse
-#F -issolved air !lotation: /uilding
;F Building inc. ;F !ed ,umps and el!5%leaning !ilters
R' ,lant Building inclusive o! %artridge Filters pressure vesselsC /ooster and
, pumps and energy recovery:O
#dministration and %ontrol BuildingO
%hemical -osing BuildingsO
%hlorine BuildingO
=lectrical (itchgear Buildings u/station.
Buildings (ill generally /e o! concrete !oundation sla/sC sheet metal cladC insulated
and suita/le !or cyclonic conditions (ith a design li!e o! 3" years. Buildings shall
comply (ith the relevant Indian Building %ode.
Buildings (ill /e provided (ith internal po(erC communicationsC lightsC air
conditioningC ventilationC (aterC air and se(erage disposal !acilities as (ell as
e?uipment and !urnishings to provide !ully !unctional !acilities.
&he Finished Floor $evel FF$: shall /e a minimum o! 3"" mm a/ove the e
-
8/15/2019 26122013 Interim Report 150 MLD
91/112
Interim Report
=?uipment /uildings (ill /e provided (ith appropriate doors to suit the operation o!
the plant including removal and replacement o! all e?uipment. ome /uildings (ill
/e provided (ith precast concrete (alls to reduce noise levels and provide heat
insulation.
13.1.2 P*a-#",: Acc),, Wa/, a%& S-a("a/,
,lat!ormsC access (ays and stair(ays (ill /e included in the design to allo(
su!!icient access !or operations and maintenance. $adders (ill /e avoided
(herever possi/le.
13.1.3 (-(%! D)+(c),
$i!ting devices (ill /e included in the design (here necessary. &hese (ill include
electrically operated %ranes ='&Es: !or removal o! pumps and air /lo(ers etc.
Aantry cranes (ill /e provided R' /uildings and the %hlorine /uilding. o/ile
cranes (ill /e re?uired to move pumping and other e?uipment to a suita/le truck
loading area.
13.2 R#a& #",
&he desalination plant area (ill /e designed as a largeC evenly graded area (ith
provision !or ade?uate access to the plant such that vehicles (ill not need to cross
open drains. Arading around the plant (ill /e arranged to ensure drainage a(ay
!rom the plant at an appropriate grade to minimise the potential !or ponding or
!looding.
*orking areas around the desalination plant (ill /e sur!aced in a road /ase or
appropriate capping layer to provide all5(eather hard standing areas !or
maintenance tra!!ic. #reas o! signi!icant tra!!icC such as around (orkshops and
o!!ices and roads /et(een !acilities plus roads surrounding and internal to the
process plant shall /e /itumen sealed. #ny areas that are sensitive to vehicle
impactC in particular /uilding edgesC (orkshop door openings etcC e
-
8/15/2019 26122013 Interim Report 150 MLD
92/112
Interim Report
#ll underground electrical ca/le in ducts conduit (ill have concrete ca/le pits at
changes o! direction. &hese pits (ill /e provided (ith remova/le concrete covers at
plate level capa/le o! taking the load !rom the outrigger o! a +" t rough terrain
crane. &he covers (ill /e levelled to the !ished road level.
#ll Internal roads shall have a minimum carriage (idth o! ." m. Roads (ill /e
(ider in areas adacent to chemical storage !acilities to allo( a chemical truck to /e
unloading (ithout restricting through tra!!ic. Road (idening (ill also /e re?uired at
/ends to provide su!!icient room !or turning o! a trailer. Road cross !all shall
generally /e designed at 2L !or sealed pavements and +L !or unsealed (ith
vertical and hori>ontal alignment to /e designed in accordance (ith 'R&pu/lications.
13.3 S(-) S)"+(c),
#ll electrical and communication services (ill /e located in suita/le underground.
ite pipe(ork (ill /e /uried (here !easi/le.
13.4 S-#" a-)" D"a(%a!)
$ocal drainage design around /uildings (ill /e /ased on a 1 in + year average
recurrence interval. %ollector drains (ill /e /ased on a 1 in 2" year return period
and over5all site drains (ill /e designed !or 1 in 1"" year rain!all intensity. -rainage
!lo(s (ill generally /e handled /y drains mostly covered. &he drainage design (ill
/e checked !or a 1 in 1"" year average recurrence interval rain!all event to ensure
that no !acilities including electrical e?uipment: su!!er any permanent damage
!rom such a storm.
torm (ater drainage !rom all !acilities shall /e contained and directed into run5o!!
channels. -rainage !rom process over!lo(s (ill /e returned /ack to the process.
13.5 '(") S/,-),
Fire services (ill /e compati/le (ith the re?uirements o! ealthC a!ety and
=nvironment and relevant standards.
-
8/15/2019 26122013 Interim Report 150 MLD
93/112
Interim Report
14. PRODUCT WATER MAIN
ound planning dictates the standard design criteria in the planning and design o!
pumping transmission mains. ,ipelines are designed in accordance (ith the
maed to carry
(ater during these events (ithout e
-
8/15/2019 26122013 Interim Report 150 MLD
94/112
Interim Report
maintained in the pipe. enceC !or closed conduits the hydraulic grade line slopes
according to the head loss.
&here!oreC pipe si>ing is /ased upon taking consideration o! !ollo(ing !actorsG5 )uantum o! !lo( ) in mYs:
Fluid velocity in ms:
,ressure m in terms o! (ater column:
ead loss m in terms o! (ater column:,ipe material
%5!actor a>en5*illiams coe!!icient o! !riction dependent on pipe material:
&he governing e?uation is given /yC
-T [4Q)bQ:\ 12
*hereC
-T Internal -ia. '! pipe m:
)T !lo( mYs:
T velocity o! !luid ms:
&ransmission /y pumping is applied in cases (hen the (ater has to /e transported
over large distances andor to higher elevations. &he pumping head is the total
headC and comprises the static head plus the !riction head loss !or the design !lo(
rate. &he pump to /e selected must /e a/le to provide this head at rated !lo(.
&he head loss corresponding to the design !lo( rate can /e computed !or several
pipe diameters using odi!ied a>en *illiam =?uation.
h T [$ ) %R: 1.81\ 994.2Q-4.81\
%R T pipe roughness coe!!icient
- T internal diameter o! pipe in mO
h T !riction head loss in mO
$ T length o! pipe in mO and
) T !lo( in pipe in m3 s
=ach com/ination o! the pumping head and corresponding pipe diameter should
/e capa/le o! supplying the re?uired !lo( rate over the re?uired distanceC and up to
the service reservoir. maller pipe diameters (ill re?uire a higher pumping head to
-
8/15/2019 26122013 Interim Report 150 MLD
95/112
Interim Report
overcome the increase in head lossesC and the other (ay round. #s a resultC one
pipe diameter (ill represent the least cost choice taking into account the initial
costs capital investment:C maintenance costs and the energy costs !or pumping.
&he total costC i.e. the capitali>ed taking /oth capital and operational cost as the
least and economicalC shall /e the /asis !or selecting the most economical pipe
diameter. &here!oreC pipe si>ing is /ased upon engineering standards !or
accepta/le energy i.e. !riction loss T loss o! pressure: loss related to the intended
use o! the pipe transmission main.
For this analysisC the
calculated costs !or
di!!erent pipe si>es
shall /e are plotted
as in a graph sho(n
as side. &here!oreC
(hen the capital cost
and the operation
cost are added the
concave up curve is
derived. &he point o! in!lection indicates the minimum total %ost. From this point
dra( a vertical line that (ill intersect the D5a
-
8/15/2019 26122013 Interim Report 150 MLD
96/112
Interim Report
Based on historical per!ormanceC li!e e
-
8/15/2019 26122013 Interim Report 150 MLD
97/112
Interim Report
resistant due to coatings applied inside and outside. oreoverC this pipe material
may /e su/ect to scale /ursts (hen tapped (ithout su!!icient skill. #lternative
materials are in this case igh5density polyethylene ,=:.
igh5density polyethylene ,=: is a very suita/le pipe material !or small5diameter
mains /ecause it can /e supplied in coil. &he potential o! laying this pipe in longer
lengths reduces the num/er o! necessary oints. ,articularly in cases (here rigid
pipe materials (ould necessitate a considera/le num/er o! special parts such as
el/o(s and /endsC the !le
-
8/15/2019 26122013 Interim Report 150 MLD
98/112
Interim Report
e?ual to 1.1 m shall /e -I (ith internal %% lining and outside !usion /onded epo
-
8/15/2019 26122013 Interim Report 150 MLD
99/112
Interim Report
14.1 A%%)>$")
14.1 .1 P() ,((%! a%& $ caac(-/ #" 550 MD
Caac(-/ 550.00 MD
6.37 MHS
ENFT 60000 M
C 0.8 <
TOTA STATIC EAD 6 M
PIPE MATERIA MS IS 2062
DESIFN EOCITY UNITCACUATED DIA
J MSEECTEDDIA J M
ACTUAEOCITY
MSC1.81 99 4.62 D4.81
STATICEAD
REUIRED PUMPEAD INCUDINF
MINOR OSS 10 IN LML
SEECTEDPUMP EAD M
EAD INK!C
1 2.84940980 2.9 ".9 42.9 994.2 10.+41 1+.30 22.91 23."" 2.34
1.1 2.0144+8399 2.8 1."3 42.9 994.2 141.+24 18.2" 2."2 20."" 2.0+4
1.2 2.+9889"+4 2. 1.2" 42.9 994.2 99."8810 2+.99 34.+9 3+."" 3.+0
1.3 2.49938+3 2.+ 1.3" 42.9 994.2 82."+243 31.39 4".+3 41."" 4.182
1.4 2.4"11"2"4 2.+ 1.3" 42.9 994.2 82."+243 31.39 4".+3 41."" 4.182
1.+ 2.324+23298 2.4 1.41 42.9 994.2 0.42424 38.2" 48."2 49."" 4.998
1. 2.2+"01"""+ 2.3 1.+3 42.9 994.2 +4.94281 4.88 +0.+ +8."" +.91
1.0 2.183+"9431 2.2 1.0 42.9 994.2 44.329 +8."+ 9.8 0"."" 0.14
1.8 2.121989043 2.2 1.0 42.9 994.2 44.329 +8."+ 9.8 0"."" 0.14
1.9 2."+3931+ 2.1 1.84 42.9 994.2 3+.40111 02.1 8+.80 8."" 8.002
2 2."13"9220 2.1 1.84 42.9 994.2 3+.40111 02.1 8+.80 8."" 8.002
2.1 1.94+8"0++ 2 2."3 42.9 994.2 28."+138 91.81 1"0."" 1"0."" 1".9142.2 1.919411941 2 2."3 42.9 994.2 28."+138 91.81 1"0."" 1"0."" 1".914
2.3 1.800221912 1.9 2.2+ 42.9 994.2 21.9182 110.+1 13+.2 13."" 13.802
2.4 1.83090"24 1.9 2.2+ 42.9 994.2 21.9182 110.+1 13+.2 13."" 13.802
,age 99
-
8/15/2019 26122013 Interim Report 150 MLD
100/112
Interim Report
S.N#. Pa"-(c$*a", '#"$*aS/;#* U%(- #-(#%(((
#-(#%<>(+
#-(#%<>+
A P() ,((%! ;a,)& #% (%-) "%a* & ), (!% "), ,$")
#.1 S)*)c-)& () ID ID 29"" 28"" 2"" 2+"" 2+"" 24"" 23"" 22"" 22"" 21"" 21"" 2""" 2""" 19"" 19""
#.2 P() OD OD 294" 284" 234.4 2+34.4 2+34.4 2434.4 2332 2232 2232 2132 2132 2"32 2"32 1928.4 1928.4
#.3 D),(!% P"),,$") Dp !,?c 2.34 2.0+4 3.+0 4.182 4.182 4.998 +.91 0.14 0.14 8.002 8.002 1".914 1".914 13.802 13.802
#.4D),(!%
T))"a-$")Td &)!.C +" +" +" +" +" +" +" +" +" +" +" +" +" +" +"
#.+ A**#a;*) ,-"),, Sa!,?c
!1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43
#.C#""#,(#%
a**#a%c) #" ca";#% ,-))*
C c ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1
#.0W)*& #(%-
)(c()%c/ #" ERW (),
@ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+
#.8/ ac-#" a, )"
ASME B31.1 -a;*)104.1.2A
/ ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4
#.9M(%($
ca*c$*a-)& ()-(c%),,
Tc D > OD >0.12 > / > D Sa > @ C > 10
8.19 0.9 0.+" 0.28 0.28 0."+ .82 .+9 .+9 .30 .30 .14 .14 +.9" +.9"
#.1"M(** %)!a-(+)
-#*)"a%c) #" ()-(c%),,
M 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+
#.11
M(%($ ")?$(")&a** -(c%),,
a-)" c#%,(&)"(%!(** -#*)"a%c)
T Tc 1 <M100
9.3 9.1" 8.+0 8.31 8.31 8." 0.09 0.+3 0.+3 0.28 0.28 0."2 0."2 .0+ .0+
A.12
S)*)c-)&-(c%),, # ();a,)& #% (%-)"%a*
*#a& -(c%),,ca*c$*a-(#%
Ts 20 20 17.2 17.2 17.2 17.2 16 16 16 16 16 16 16 14.2 14.2
,age 1""
-
8/15/2019 26122013 Interim Report 150 MLD
101/112
Interim Report
,age 1"1
-
8/15/2019 26122013 Interim Report 150 MLD
102/112
Interim Report
14.1.2 P() ,((%! a%& $ caac(-/ #" 2 Q 275 MD
Caac(-/ 275.00 MD
3.18 MHS
ENFT 60000 M NOTE
C 0.8 < 1 TWO PIPES EAC ACCOMODATINF 275 MD : TE ENTIRE SYSTEM 2 > 275 MD COMPRISINF 4W 2SPUMPS. RE'ER SCEMATIC DIAFRAM PROIDED IN TE SEET.TOTA STATIC EAD 6 M
PIPE MATERIA MS IS 2062
DESIFN EOCITY UNITCACUATED
DIA J MSEECTEDDIA J M
ACTUAEOCITY
MSC1.81 994.62 D4.81
STATICEAD
REUIRED PUMPEAD INCUDINFMINOR OSS 10
IN LML
SEECTEDPUMP
EAD M
EADIN
K!C
1 2."13"9220 2.1 ".92 12.18 994.2 3+.40111 2".01 28.08 29."" 2.9+8
1.1 1.919411941 2 1."1 12.18 994.2 28."+138 2.18 34.8" 3+."" 3.+0
1.2 1.83090"24 1.9 1.12 12.18 994.2 21.9182 33.+1 42.8 43."" 4.38
1.3 1.0+"219 1.8 1.2+ 12.18 994.2 1.89899 43.40 +3.81 +4."" +.+"8
1.4 1.0"130842 1.8 1.2+ 12.18 994.2 1.89899 43.40 +3.81 +4."" +.+"8
1.+ 1.438180 1.0 1.4" 12.18 994.2 12.8380 +0.22 8.94 9."" 0."38
1. 1.+914923"0 1. 1.+8 12.18 994.2 9.+8990 0.+9 9".2+ 91."" 9.282
1.0 1.+4390432 1. 1.+8 12.18 994.2 9.+8990 0.+9 9".2+ 91."" 9.282
1.8 1.+""403330 1. 1.+8 12.18 994.2 9.+8990 0.+9 9".2+ 91."" 9.282
1.9 1.4"4+3+"2 1.+ 1.8" 12.18 994.2 0."3"0" 1"4.40 12".92 121."" 12.342
2 1.423403994 1.+ 1.8" 12.18 994.2 0."3"0" 1"4.40 12".92 121."" 12.342
2.1 1.38918304 1.4 2."0 12.18 994.2 +."4+101 14+.+9 1.1+ 10."" 10."34
2.2 1.3+02292 1.4 2."0 12.18 994.2 +."4+101 14+.+9 1.1+ 10."" 10."34
2.3 1.32039343 1.4 2."0 12.18 994.2 +."4+101 14+.+9 1.1+ 10."" 10."34
2.4 1.299448"20 1.3 2.4" 12.18 994.2 3.+32381 2"0.94 234.03 23+."" 23.90
,age 1"2
-
8/15/2019 26122013 Interim Report 150 MLD
103/112
Interim Report
S.N#. Pa"-(c$*a", '#"$*aS/;#* U%(- #-(#%
#-(#%<>(
#-(#%<>((
#-(#%<>(((
#-(#%<>(+
#-(#%<>+
A P() ,((%! ;a,)& #% (%-)"%a* &),(!% "),,$")
#.1 S)*)c-)& () ID ID 21"" 2""" 19"" 18"" 18"" 10"" 1"" 1"" 1"" 1+"" 1+"" 14"" 14"" 14"" 13""
#.2 P() OD OD 214" 2"4" 1934.4 1834.4 1834.4 1034.4 132 132 132 1+32 1+32 1432 1432 1428.4 1328.4
#.3 D),(!% P"),,$") Dp !,?c 2.9+8 3.+0 4.38 +.+"8 +.+"8 0."38 9.282 9.282 9.282 12.342 12.342 10."34 10."34 10."34 23.90
#.4D),(!%
T))"a-$")Td &)!.C +" +" +" +" +" +" +" +" +" +" +" +" +" +" +"
#.+ A**#a;*) ,-"),, Sa!,?c
!1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43
#.C#""#,(#%
a**#a%c) #" ca";#% ,-))*
C c ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1
#.0W)*& #(%-
)(c()%c/ #" ERW (),
@ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+
#.8/ ac-#" a, )"
ASME B31.1-a;*) 104.1.2A
/ ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4
#.9M(%($
ca*c$*a-)& ()-(c%),,
Tc D > OD >0.12 > / > D Sa > @ C >
10
.39 .10 +.93 +.01 +.01 +.48 +.2+ +.2+ +.2+ +."2 +."2 4.09 4.09 4.08 4.++
#.1"M(** %)!a-(+)-#*)"a%c) #"
() -(c%),,M 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+
#.11
M(%($")?$(")& a**
-(c%),, a-)" c#%,(&)"(%! (**
-#*)"a%c)
T Tc 1 <M100
0.31 0."+ .08 .+2 .+2 .2 ."" ."" ."" +.04 +.04 +.48 +.48 +.40 +.2"
A.12
S)*)c-)&-(c%),, #
() ;a,)& #%(%-)"%a* *#a&
-(c%),,
ca*c$*a-(#%
Ts 20 20 17.2 17.2 17.2 17.2 16 16 16 16 16 16 16 14.2 14.2
,age 1"3
-
8/15/2019 26122013 Interim Report 150 MLD
104/112
Interim Report
14.1.3 P() ,() a%& $ caac(-/ #" 400 MD
,age 1"4
-
8/15/2019 26122013 Interim Report 150 MLD
105/112
Interim Report
Caac(-/ 400.00 MD
4.63 MHS
ENFT 60000 M
C 0.8 <
TOTA STATIC EAD 6 M
,I,= #&=RI#$: I 2"2
DESIFN EOCITY UNITCACUATED DIA
J MSEECTEDDIA J M
ACTUAEOCITY
MSC1.81 994.62 D4.81
STATICEAD
REUIREDPUMP EADINCUDINF
MINOR OSS10 IN LML
SEECTEDPUMP
EAD M
EAD INK!C
1 2.42088+4"1 2.+ ".94 23.99 994.2 82."+2429 10.4 2+.4" 2."" 2.+2
1.1 2.3148909"1 2.4 1."2 23.99 994.2 0.424242 21.4 29.1 3"."" 3."
1.2 2.2134""2 2.3 1.11 23.99 994.2 +4.942813 2.34 34.90 3+."" 3.+0
1.3 2.1293931 2.2 1.22 23.99 994.2 44.3288 32.2 41.88 42."" 4.284
1.4 2."+193000 2.1 1.34 23.99 994.2 3+.401112 4".8" +".88 +1."" +.2"2
1.+ 1.9823"129 2 1.40 23.99 994.2 28."+1383 +1.+9 2.0+ 3."" .42
1. 1.919411941 2 1.40 23.99 994.2 28."+1383 +1.+9 2.0+ 3."" .42
1.0 1.821"31 1.9 1.3 23.99 994.2 21.918190 ."3 08.3 09."" 8."+8
1.8 1.8"938933 1.9 1.3 23.99 994.2 21.918190 ."3 08.3 09."" 8."+8
1.9 1.01303190 1.8 1.82 23.99 994.2 1.89899 8+.4 1"".2" 1"1."" 1".3"2
2 1.01004231 1.8 1.82 23.99 994.2 1.89899 8+.4 1"".2" 1"1."" 1".3"2
2.1 1.0+4"""90 1.0 2."4 23.99 994.2 12.8380+ 112.04 13"."1 131."" 13.32
2.2 1.388"""4 1.0 2."4 23.99 994.2 12.8380+ 112.04 13"."1 131."" 13.32
2.3 1.""9""22+ 1.0 2."4 23.99 994.2 12.8380+ 112.04 13"."1 131."" 13.32
2.4 1.+0193288 1. 2.3" 23.99 994.2 9.+89901 1+".91 102."" 103."" 10.4
,age 1"+
-
8/15/2019 26122013 Interim Report 150 MLD
106/112
Interim Report
S.N#. Pa"-(c$*a", '#"$*aS/;#* U%(- #-(#%(+
#-(#%+
A P() ,((%! ;a,)& #% (%-) "%a* & ), (!% "),,$")
#.1 S)*)c-)& () ID ID 2+"" 24"" 23"" 22"" 21"" 2""" 2""" 19"" 19"" 18"" 18"" 10"" 10"" 10"" 1""
#.2 P() OD OD 2+34.4 2434.4 2334.4 2232 2132 2"32 2"32 1932 1932 1832 1832 1028.4 1028.4 1028.4 128.4
#.3 D),(!% P"),,$") Dp !,?c 2.+2 3." 3.+0 4.284 +.2"2 .42 .42 8."+8 8."+8 1".3"2 1".3"2 13.32 13.32 13.32 10.4
#.4D),(!%
T))"a-$")Td &)!.C +" +" +" +" +" +" +" +" +" +" +" +" +" +" +"
#.+ A**#a;*) ,-"),, Sa!,?c
!1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43
#.C#""#,(#%
a**#a%c) #" ca";#% ,-))*
C c ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1
#.0W)*& #(%-
)(c()%c/ #" ERW(),
@ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+
#.8/ ac-#" a, )"
ASME B31.1 -a;*)104.1.2A
/ ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4
#.9M(%($
ca*c$*a-)& ()-(c%),,
Tc D > OD >0.12 > / > D Sa > @ C >
10
0.28 0."+ .83 ." .30 .1+ .1+ +.92 +.92 +.9 +.9 +.4 +.4 +.4 +.23
#.1"M(** %)!a-(+)
-#*)"a%c) #" ()-(c%),,
M 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+
#.11
M(%($ ")?$(")&a** -(c%),,
a-)" c#%,(&)"(%!(** -#*)"a%c)
T Tc 1 <M100
8.32 8." 0.8" 0.+4 0.28 0."2 0."2 .00 .00 .+1 .+1 .24 .24 .24 +.98
A.12
S)*)c-)& -(c%),,# () ;a,)& #%
(%-)"%a* *#a&-(c%),,
ca*c$*a-(#%
Ts 17.2 17.2 17.2 16 16 16 16 16 16 16 16 14.2 14.2 14.2 14.2
,age 1"
-
8/15/2019 26122013 Interim Report 150 MLD
107/112
Interim Report
,age 1"0
-
8/15/2019 26122013 Interim Report 150 MLD
108/112
Interim Report
14.1.4 P() ,() a%& $ caac(-/ #" 150 MD
Caac(-/ 150.00 MD
1.74 MHS
ENFT """" NOTE
C ".8 5 1 ONE PIPE ACCOMODATINF 150 MD : TE ENTIRE SYSTEM WI COMPRISE 3W 2S PUMPS. RE'ERSCEMATIC DIAFRAM PROIDED IN TE SEET.TOTA STATIC EAD
PIPE MATERIA MS I 2"2
DESIFN EOCITY UNIT
CACUATED DIA
J M
SEECTED DIA
J M
ACTUA
EOCITYMS
C1.81 994.62 D4.81
STATIC
EAD
REUIREDPUMP EAD
INCUDINFMINOR OSS10 IN LML
SEECTED
PUMPEAD M
EAD INK!C
1 1.4800""90 1.+ ".98 4." 994.2 0."3"0"299 34.88 44.3 4+."" 4.+9
1.1 1.410+09 1.+ ".98 4." 994.2 0."3"0"299 34.88 44.3 4+."" 4.+9
1.2 1.3+02292 1.4 1.13 4." 994.2 + ."4+10"+4 48." +9.4 "."" .12
1.3 1.3"39833 1.4 1.13 4." 994.2 +."4+10"+4 48." +9.4 "."" .12
1.4 1.2+++""03 1.3 1.31 4." 994.2 3.+3238"804 9.42 82.3 83."" 8.4
1.+ 1.2139420"1 1.3 1.31 4." 994.2 3.+3238"804 9.42 82.3 83."" 8.4
1. 1.10+3949 1.2 1.+4 4." 994.2 2.4"3+9000 1"2."2 118.22 119."" 12.138
1.0 1.14"3""11 1.2 1.+4 4." 994.2 2.4"3+9000 1"2."2 118.22 119."" 12.138
1.8 1.1"8103""1 1.2 1.+4 4." 994.2 2.4"3+9000 1"2."2 118.22 119."" 12.138
1.9 1."08139+ 1.1 1.83 4." 994.2 1.+81"084 1++."4 10.+4 100."" 18."+4
2 1."+13"+210 1.1 1.83 4." 994.2 1.+81"084 1++."4 10.+4 100."" 18."+4
2.1 1."2+98838 1.1 1.83 4." 994.2 1.+81"084 1++."4 10.+4 100."" 18."+4
2.2 1.""238"19+ 1.1 1.83 4." 994.2 1.+81"084 1++."4 10.+4 100."" 18."+4
2.3 ".98"34010 1 2.21 4." 994.2 1 24+.21 20+.03 20."" 28.1+2
2.4 ".9+90"+901 1 2.21 4." 994.2 1 24+.21 20+.03 20."" 28.1+2
,age 1"8
-
8/15/2019 26122013 Interim Report 150 MLD
109/112
Interim Report
S.N#. Pa"-(c$*a", '#"$*aS/;#* U%(- #-(#%(((#-(#%<
>(+#-(#%<
>+
A P() ,((%! ;a,)& #% (%-)"%a* &),(!% "),,$")
#.1 S)*)c-)& () ID ID 1+"" 1+"" 14"" 14"" 13"" 13"" 12"" 12"" 12"" 11"" 11"" 11"" 11"" 1""" 1"""
#.2 P() OD OD 1+4" 1+4" 1434.4 1434.4 1334.4 1334.4 1232 1232 1232 1132 1132 1132 1132 1"28.4 1"28.4
#.3 D),(!% P"),,$") Dp !,?c 4.+9 4.+9 .12 .12 8.4 8.4 12.138 12.138 12.138 18."+4 18."+4 18."+4 18."+4 28.1+2 28.1+2
#.4D),(!%
T))"a-$")Td &)!.C +" +" +" +" +" +" +" +" +" +" +" +" +" +" +"
#.+ A**#a;*) ,-"),, Sa!,?c
!1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43 1311.43
#.C#""#,(#%
a**#a%c) #" ca";#% ,-))*
C c ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1 ".1
#.0W)*& #(%-
)(c()%c/ #" ERW(),
@ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+ ".8+
#.8/ ac-#" a, )"
ASME B31.1 -a;*)104.1.2A
/ ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4 ".4
#.9M(%($
ca*c$*a-)& ()-(c%),,
Tc D > OD >0.12 > / > D Sa > @ C > 10
+."+ +."+ 4.81 4.81 4.+8 4.+8 4.3+ 4.3+ 4.3+ 4.12 4.12 4.12 4.12 3.88 3.88
#.1"M(** %)!a-(+)
-#*)"a%c) #" ()-(c%),,
M 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+ 12.+
#.11
M(%($ ")?$(")&a** -(c%),,
a-)" c#%,(&)"(%!(** -#*)"a%c)
T Tc 1 <M100
+.00 +.00 +.+" +.+" +.24 +.24 4.90 4.90 4.90 4.01 4.01 4.01 4.01 4.44 4.44
A.12
S)*)c-)&-(c%),, # ();a,)& #% (%-)"%a*
*#a& -(c%),,ca*c$*a-(#%
Ts 20 20 17.2 17.2 17.2 17.2 16 16 16 16 16 16 16 14.2 14.2
,age 1"9
-
8/15/2019 26122013 Interim Report 150 MLD
110/112
Interim Report
,age 11"
-
8/15/2019 26122013 Interim Report 150 MLD
111/112
Interim Report
15. BENEIFTS OF LONGTERM O!M CONTRACT
unicipalitiesutilities enter into long5term '@ %ontract services to achieve a num/er o!
goalsC includingG
• Reducing costsC /oth capital and '@ costsO
• Increasing e!!iciencyO
• =nhancing risk managementO
• eeting capital investment needsO
• #chieving regulatory complianceO
• 'vercoming lack o! local e
-
8/15/2019 26122013 Interim Report 150 MLD
112/112
Interim Report
In addition to direct costC complianceC per!ormanceC and !inancial /ene!itsC long5term
contracts !or (ater services can ena/le local leaders to concentrate their energies on other
programs and !unctions. &he day5to5day management o! utility systems has /ecome a/urden in many communitiesC draining pro!essional and management resources that can
/e /etter !ocused on other municipal and community needs. In additionC partnerships lead
to increased accounta/ilityC improved service levelsC capital improvementsC and additional
/ene!its to the community.
&he /asic main o! having long term '@ contracts have %ost aving and #ccounta/ility
#s long5term agreements shi!t responsi/ility !or compliance (ith all regulations to private
providersC many municipal o!!icials !eel a Jpeace o! mindJ kno(ing an ee operations.
FurtherC $ong5term contracts o!ten result in improved per!ormance and more
e!!icient services. ,rivate !irms make greater up5!ront investments in advanced
computers and cutting5edge technologyC kno(ing the costs can /e amorti>ed over a
longer period.