MAUS StatusA. Dobbs, MPB Talk, 24th November 2014
MAUS Status, A. Dobbs, MPB Talk 2
Overview• Detectors
• TOF• CKOV• Tracker• KL• EMR
• Global tracking• MC• Geometry• Framework• Physics Block Challenge
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 3
Detectors
24/11/2014
CKOV – Threshold Cherenkov detectors (aerogel)TOF – Three Time of Flight detectors (scintillator bars)Tracker – Two high precision trackers with 5 detectors stations each (scintillating fibre)KL – KLOE Lite detector, part of downstream calorimeter (lead and scintillating fibre)EMR – Electron Muon Ranger, part of downstream calorimeter (scintillator bars)
MAUS Status, A. Dobbs, MPB Talk 4
TOFLead: D. Rajaram• Reconstruction works
and is stable• Calibrations in CDB
• MC is stable• Need to restructure
MCDigitiser code for MC trigger
• Online plots in place
24/11/2014
eµ
e
µ
MAUS Status, A. Dobbs, MPB Talk 5
CKOVLead: L. Cremaldi, D. Rajaram• Reconstruction:• Pedestal calibration and pulse
finding algorithm have been improved, needs to be updated in trunk
• MC:• Missing sensitive detector code• Missing digitiser code• Stems from resource issue. Will
transfer resource from recon to MC soon
24/11/2014
µ
e
MAUS Status, A. Dobbs, MPB Talk 6
TrackerLead: D. Adey• Reconstruction:
• Good position and momentum residuals observed• Used to reconstruction emittance, ~ 1.2% error bias vs MC• Looking at improving low pt performance, efficiency studies
underway...
• MC:• Recent improvements to noise algorithm, close to completion
• Unpacking• Broke during previous code updates (between MAUS 0.7.5 and 0.7.6),
fix work ongoing (D. Adey, Y. Karadzhov)
• Paper describing reconstruction and performance: first draft finished (A. Dobbs), see http://mice.iit.edu/micenotes/public/pdf/MICE0451/MICE0451.pdf
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 7
Tracker Position Residuals
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 824/11/2014
MAUS Status, A. Dobbs, MPB Talk 9
Tracker Momentum Residuals
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 1024/11/2014
MAUS Status, A. Dobbs, MPB Talk 11
MC Single Particle Analysis
24/11/2014
Upstream Tracker
DownstreamTracker
6mm transverse emittance, 200 MeV/c beam. Cuts: pt < 150, pz < 300, p value > 5%, no secondaries, only µ+ (cut uses MC data), no decays present, track appears in both trackers
MAUS Status, A. Dobbs, MPB Talk 12
KLLead: M. Bogomilov, J. Nugent• Reconstruction
• Works and stable• Calibrations are in CDB• Pileup in KL based on expected
rates from the beam is now included as part of the analysis package for the Step I PID study
• MC• Digitiser complete and
validated with Step 1 data• Conversion and smearing tuned
24/11/2014
KL ADC Product
Entr
ies
MAUS Status, A. Dobbs, MPB Talk 13
EMRLead: F. Drielsma• Reconstruction:• First pass now in MAUS trunk,
good results seen• Calibration files not yet in CDB
• MC:• Digitiser is complete
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 14
EMR Tracks Pre-Digitisation
24/11/2014
Plane ID -> Distance in z, Bar ID -> Distance in x
MAUS Status, A. Dobbs, MPB Talk 15
EMR Tracks Post Digitisation
24/11/2014
Plane ID -> Distance in z, Bar ID -> Distance in x
MAUS Status, A. Dobbs, MPB Talk 16
Global TrackingLead: M. Uchida• Steady progress following personnel
changes• Not yet ready to be used in anger• Solid progress on both and PID and track
matching and fitting, first results seen
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 17
MCLead: A. Dobbs• In place and works• Beam generation and propagation now
available from G4Beamline in addition to MAUS native (J. Nugent)• MC trigger progressing (D. Rajaram)
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 18
GeometryLead: R. Bayes• CDB geometry has been through vetting and found to be good (static since May)• Implementing a GDML
parser to increase performance
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 19
FrameworkLead: A. Dobbs• A number of memory leaks resolved, still some to
go (A. Dobbs, D. Rajaram)• Batch reconstruction on the GRID now working but
need to make a release with new code• Little less than 1% of jobs were cancelled ->
remaining leaks to be plugged• Test coverage reasonable, test server working well
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 20
Physics Block ChallengeLead: R. Bayes, C. Rogers• Falls under the purview of the Analysis group…• … but MAUS responsible for providing a
release version that works on the GRID. Currently have a version running not GRID, not yet a release• First physics block challenge run complete,
with the data made available to collaborators
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 21
Summary• TOF, KL, EMR in good shape and producing results• Tracker in good shape, able to measure emittance. Need to
implement online display, fix unpacking, look at low pt performance• CKOV work ongoing, producing results• Global tracking making steady progress now, but deadline very tight NB: We do not need Global to measure emittance, only TOF and Tracker• Geometry has been through vetting and found to be good• Framework: good, batch production now working, but need to plug
remaining memory leaks• General MAUS journal paper in production
24/11/2014
MAUS Status, A. Dobbs, MPB Talk 22
Step IV Readiness• Can reconstruct all detectors• Can perform PID and select muons• Can reconstruct emittance• Improvements ongoing
24/11/2014
Questions?