INDUSTRIAL
Goya headquarters consists of an approximately 615,000-square-foot warehouse on a 40-acre site. Langan’s multidiscipline approach greatly simplified a complex development process and brought great value to Goya, one of America’s most beloved food brands.
Jersey City, NJ
GOYA FOODS HEADQUARTERSGoya 75th Urban Renewal Co., LLCRockefeller GroupM+H ArchitectsRC Andersen
Team
160
The Cranbury Logistics Center is an industrial redevelopment project on a 395-acre parcel adjacent to the New Jersey Turnpike. Formerly a Department of Defense munitions manufacturing facility, the site is now home to three e-commerce fulfillment centers totaling 2.8 million square feet.
Cranbury, NJCRANBURY LOGISTICS CENTER
Clarion PartnersViridian PartnersRGA ArchitectsRC Andersen
Team
162
Porsche Northeast, Palmer, PA
Trammell Crow CompanyClarion PartnersPrologisMacgregor Associates ArchitectsFord & Associates ArchitectsRC Andersen
TeamLangan provided multidisciplinary engineering and permitting services for two e-commerce centers totaling 1.9 million square feet in Colorado. NAIOP recognized these state-of-the-art facilities as Colorado’s Industrial Project of the Year in 2018 and 2019.
Aurora and Thornton, COCOLORADO E-COMMERCE CENTERS
Thornton, CO
Aurora, CO164
TeamLangan provided site/civil engineering, landscape architecture, and geotechnical engineering services for this approximately 950,000-square-foot distribution center and outlet store.
Cranbury, NJ
CRATE & BARREL DISTRIBUTION CENTER
Rockefeller Group
166
Langan provided site/civil, geotechnical, environmental, surveying, and landscape architecture services for this 21-acre proposed technology park. Upon completion, the site will include 660,000 square feet of data center space.
Reston, VACoreSiteNORR
CORESITE VA3 DATA CENTER
168
Team
Matrix Global Logistics Park, Staten Island, NY
Fulfillment Center, Fall River, MA
Blackhawk Warehouse Facility, Town of Hamptonburgh, NY
Porsche Northeast, Palmer, PA
INDUS
TRIAL
Fulfillment Center, Windsor, CT
Fulfillment Center, Opa-locka, FL
First 290 @ Guhn Road, Houston, TX Best Buy Distribution Center, Piscataway, NJ170 171
Page
169: CoreSite VA3 Data Center, Reston, VA | NORR