![Page 1: 20, 2018... · Sarasota, FL 34240 2017 CHANGE INFORMATION: Change Order Number: 002 Date: 03-16-2018 CONTRACTOR: (Name and address) Jon F. Swift, Inc. 2221 8th Street Florida 34237](https://reader035.vdocuments.us/reader035/viewer/2022071010/5fc8642205b3d77a062a98c4/html5/thumbnails/1.jpg)
Facilites Services Change Orders
CURRENTCONTRACTAMOUNT
REVISEDAMOUNT
SALES TAX SAVINGS *PROJECT EXPLANATION (see attached)
SUMMARY OF FACILITES SERVICES CHANGE ORDERS PRESENTED FOR APPROVAL AND/OR RATIFICATION AT THE 11/20/201 SCHOOL BOARD MEETINGCONTRACTOR CO# CHANGE
Bay Haven School of Basics Plus; Structural Repair/Painting/HVAC Classroom Study /Renovation Jon F. Swift, Inc. $119,585.001 $98,816.82 $218,401,82 Additional cost for preconstruction services $0.00 AVenice High School - TrackExpansion
Additional labor and equipment needed to remove unforeseen rock in way of track drainage systemJon F. Swift, Inc. $884,580.18 $13,964.611 $898,544,79 $0.00 R
$1,004,165.18 $112,781.43 $1,116,946.61 TOTAL IN TAX SAVINGS: 0.00
NOTE: The change orders ('identified above), for ratification, are the result of direct purchase of these items by the School Board to save sales tax.’A=Approval; R=Ratification
![Page 2: 20, 2018... · Sarasota, FL 34240 2017 CHANGE INFORMATION: Change Order Number: 002 Date: 03-16-2018 CONTRACTOR: (Name and address) Jon F. Swift, Inc. 2221 8th Street Florida 34237](https://reader035.vdocuments.us/reader035/viewer/2022071010/5fc8642205b3d77a062a98c4/html5/thumbnails/2.jpg)
![Page 3: 20, 2018... · Sarasota, FL 34240 2017 CHANGE INFORMATION: Change Order Number: 002 Date: 03-16-2018 CONTRACTOR: (Name and address) Jon F. Swift, Inc. 2221 8th Street Florida 34237](https://reader035.vdocuments.us/reader035/viewer/2022071010/5fc8642205b3d77a062a98c4/html5/thumbnails/3.jpg)
![Page 4: 20, 2018... · Sarasota, FL 34240 2017 CHANGE INFORMATION: Change Order Number: 002 Date: 03-16-2018 CONTRACTOR: (Name and address) Jon F. Swift, Inc. 2221 8th Street Florida 34237](https://reader035.vdocuments.us/reader035/viewer/2022071010/5fc8642205b3d77a062a98c4/html5/thumbnails/4.jpg)
![Page 5: 20, 2018... · Sarasota, FL 34240 2017 CHANGE INFORMATION: Change Order Number: 002 Date: 03-16-2018 CONTRACTOR: (Name and address) Jon F. Swift, Inc. 2221 8th Street Florida 34237](https://reader035.vdocuments.us/reader035/viewer/2022071010/5fc8642205b3d77a062a98c4/html5/thumbnails/5.jpg)