Download - 2 21-12 meeting
![Page 1: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/1.jpg)
Pinehurst Greens Committee MeetingTuesday, February 21, 2012
![Page 2: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/2.jpg)
Pinehurst Country Club Greens Committee Meeting
• Chairperson Report – Erich Tiepel– Update from the Board of Directors and approval of minutes– Master Plan implementation update/plans for 2012
• General Manager’s Report – Cheryl Rook and Loren Pippin• Grounds Report – Steve Sarro
– Dog Policy at Pinehurst Country Club:• Option 1: Denver Police involvement• Option 2: Postings and member/employee policing
– Construction Update:• Current: 5, 9 and 17 tees• Progress/plans for other tees (18, 15)• 9 Hole Diner
– On-course Recycling– DuPont Imprelis update– Water Update: Don DeSchepper and Dr. Paul Motzkus
• Schedule
![Page 3: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/3.jpg)
Pinehurst Dog PolicyOption 1
Police Involvement:
Pro: Sets an example and precedence
Con: Creates a bad relationship with member or neighbor
![Page 4: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/4.jpg)
Pinehurst Dog PolicyOption 2
Consistent and Persistent: • Write letter to members and neighbors.• Post letter to message boards in residential communities.• Members and staff police areas throughout each day.• Encourage members to police their own property and not allowdog owners to cut through yards.• Message to members through PCC newsletters, emails, blog, etc.
![Page 5: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/5.jpg)
Pinehurst Dog Policy
Goose Dogs: Lucy, Cirrus and Mick
![Page 6: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/6.jpg)
New Projects for 2012
• 9 Tee– New One Cone Tee– Adds 30 Yards
• 17 Tee– New One Cone Tee– Adds 7-10 Yards
• 5 Tee– New One Cone Tee– Adds 10-15 Yards
• Practice Bunker– Lower lip improves visual of shot– Used excess dirt on construction of 9 tee
![Page 7: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/7.jpg)
Site of new 1 Cone Tee
![Page 8: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/8.jpg)
Removed three trees and one shrub
![Page 9: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/9.jpg)
Dirt in place for teeing grounds
![Page 10: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/10.jpg)
Picture taken at eye-level. The site still needs a couple of more inches of fill. The fairway bunker on the right is currently visible.
![Page 11: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/11.jpg)
Adding 7-10 yards on this hole
![Page 12: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/12.jpg)
This is a separate tee, slightly higher in elevation than the tee in front.
![Page 13: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/13.jpg)
Large mounding from years of sand splashing.Players can not see how the ball releases
from the shot on the green.
![Page 14: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/14.jpg)
Green sod to be removed and replaced
Sandy soil removed
![Page 15: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/15.jpg)
Stacked greens sod to be replaced
![Page 16: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/16.jpg)
Till soil to promote proper rooting and plant health
![Page 17: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/17.jpg)
Replacing the green
![Page 18: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/18.jpg)
Sod replaced and new sod from the nurseryto be added in the spring.
![Page 19: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/19.jpg)
Lowered lip and the green surface can be seen by the golfer.
![Page 20: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/20.jpg)
Turf cover put on for winter health
![Page 21: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/21.jpg)
Projects for Consideration
• 18 Tee– Add 10-15 yards– 5:1 slope– Requires 6 feet of walls (or three 2 foot walls)– Aproximate price of project is $17,000
• 15 Tee– Increase up to 30 yards in length– Remove 4,500 cubic yards of material– Estimate is $67,000
![Page 22: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/22.jpg)
Extensive construction required
1:5 slope attee location
![Page 23: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/23.jpg)
Requires three 2 foot walls ($10K)
![Page 24: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/24.jpg)
Tee Renovation$67K from LUI
![Page 25: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/25.jpg)
Cut and remove 4,500 CY of materialto lower the teeing grounds. Adding
up to 30 yards in length.
![Page 26: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/26.jpg)
Remove Trip Hazards
![Page 27: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/27.jpg)
Add dirt to replace asphalt
![Page 28: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/28.jpg)
Improving our Recycling Efforts At Pinehurst Country Club
Installed at the clubhouse, tennis, pool9 hole diner and 1st tees
(proposed capital)
Installed on every ball washer on 27 holes (black)
![Page 29: 2 21-12 meeting](https://reader033.vdocuments.us/reader033/viewer/2022052619/55545e3cb4c905aa798b47f9/html5/thumbnails/29.jpg)
Water Update
• Harriman Reservoir:– Construction has begun– Contract talks have begun
• Ft. Logan Ditch Company Annual Meeting