![Page 1: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/1.jpg)
11
ETM5221 Engineering Teaming: Application and
Execution
Nicholas C. Romano, Jr.
Paul E. Rossler
![Page 2: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/2.jpg)
22
Week 1 April 2, 2002Challenges of Teaming
![Page 3: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/3.jpg)
33
Agenda
Class Overview
Introductions
Review the Questionnaire
Meeting Analysis
Teaming Challenges
![Page 4: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/4.jpg)
44
Class overview
1. Instructor Introductions
2. Class Introductions
3. Teaching and Learning Objectives
4. Course Syllabus and Policies
![Page 5: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/5.jpg)
55
Professors
Nicholas C. Romano, Jr. Ph.D.
Paul E. Rossler Ph.D , P.E.
![Page 6: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/6.jpg)
66
Class introductions
• Your Name
• Where you work
• What is your job
• Why interested in taking this class
• Kids? Pets? Describe them
• Favorite Food
• Favorite Color
![Page 7: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/7.jpg)
77
Teaching philosophy
If we only tell you, you might forget
If we also show you, you might remember
If you get yourself involved, you will understand
![Page 8: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/8.jpg)
88
Three steps to active student learning
1. Teach: We will explain and demonstrate concepts
2. Practice: Students must take advantage of opportunities to practice using these concepts
3. Evaluate: Assignments, participation & Exams allow Instructor evaluation
Students must also learn to evaluate themselves and prepare accordingly
![Page 9: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/9.jpg)
99
We are educators, professors, NOT trainers. We will…
1. Encourage
2. Provide opportunities
3. Offer useful real world perspectives
4. Prepare students for future
5. Take a small step preparing students to better lead and manage teams
![Page 10: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/10.jpg)
1010
Course syllabus detail review
![Page 11: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/11.jpg)
1111
Pre-class questionnaire results
![Page 12: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/12.jpg)
1212
Meeting analysis: Findings from research and practice
• Why consider meetings in teaming?
• Defining meetings
• Meeting productivity metrics
![Page 13: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/13.jpg)
1313
Why consider meetings in teaming?
• Are essential for accomplishing work
• Dominate workers’ and managers’ time
• Are considered costly, unproductive, dissatisfying
• Are steadily increasing in number and length
Research and practice illustrate that meetings:
![Page 14: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/14.jpg)
1414
Why consider meetings in teaming? (cont’d.)
"Almost every time there is a genuinely important decision to be made in an
organization, a group is assigned to make it -- or at least to counsel and advise the
individual who must make it."
-Hackman
![Page 15: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/15.jpg)
ETM5221 Engineering Teaming Spring 2002 1515
Why people meet
Surface PerspectivesSurface Perspectives Review
Share WorkShare Work
Share the VisionShare the Vision
SocializeSocializeBuild Consensus Solve ProblemsSolve Problems
Avoid DecisionsAvoid Decisions
Make Decisions
SynergySynergy Share Information
Build TrustBuild Trust
Allocate ResourcesAllocate Resources
Develop Project PlansDevelop Project Plans
Monitor Project ProgressMonitor Project Progress
Prioritize TasksPrioritize Tasks
![Page 16: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/16.jpg)
1616
Why people meet (cont’d.)
"We meet because people holding different jobs have to cooperate to get a specific task done.
We meet because the knowledge and experience needed in a specific situation
are not available in one head, but have to be pieced together out of the knowledge and
experience of several people.”
- Peter Drucker (1967)
![Page 17: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/17.jpg)
1717
Today we collaborate through meetings
We need to understand today’s meetings as thoroughly as possible in order to move to toward collaborating in a virtual world
One way to do this is through Meeting Productivity Metrics
![Page 18: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/18.jpg)
1818
A big change is occurring. Why is this happening?
• Downsizing/Rightsizing
• Flattening
• Telecommuting
• Increased Competition
• Globalization
• Etc....
![Page 19: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/19.jpg)
1919
A shift is taking place with respect to the critical resource
Revolutionary Age Critical Resource
AgriculturalPhysical capital (manpower, horsepower)
IndustrialFinancial capital (purchasing power)
Information What do you think it is?
![Page 20: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/20.jpg)
ETM5221 Engineering Teaming Spring 2002 2020
The Information Age
Manage routine transactions (50s-60s) Integrated business operations (70s) Enterprise-wide communication (80s) Collaborative technology (90s) Ubiquitous computing 2000-??? Manage and leverage intellectual
capital
![Page 21: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/21.jpg)
2121
Intellectual capital
• Companies typically value tangible assets, such as buildings, machinery, cash but such measures do not include the value of the work force, their knowledge, and the way they use information technology to increase productivity.
• In the information society intangible assets may represent significant competitive advantage.
![Page 22: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/22.jpg)
2222
Intellectual capital: Categories of intangible assets
• Human Centered Assets
• Intellectual Property Assets
• Infrastructure Assets
• Market Assets
![Page 23: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/23.jpg)
2323
Meeting intellectual capital
The Gottlieb Duttweiler Foundation has estimated that organizations use only
20% of available intellectual capacity on a day to day basis.
This is most likely a high estimate.
![Page 24: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/24.jpg)
2424
Existing meeting productivity metrics
• Types
• Purposes
• Time
• Number
• Cost
• Efficiency
• Problems
![Page 25: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/25.jpg)
2525
Types of meetings in Corporate America
45% Staff
22% Task
21% Information Sharing
5% Brainstorming
2% Ceremonial
5% Other
Based on 903 meetings (Monge, P. R., McSween, C., & Wyer, J. 1989)
![Page 26: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/26.jpg)
2626
Meeting purposes: 66% involve complex group processes
2%
2%
4%
4%
5%
11%
11%
26%
29%
0% 10% 20% 30% 40% 50% 60%
Demonstrate a project or system
Accept Reports
Explore new ideas and concepts
Gain support for a program
Facilitate staff communicaiton
Ensure that everyone understands
Solve a Problem
Reach group decision or judgement
Reconcile conflict
(Monge, P. R., McSween, C., & Wyer, J. 1989)
![Page 27: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/27.jpg)
2727
Time spent in meetingsshows an upward trend
1960’s: Average Exec. 3 1/2 hrs/wk (~3-4 Meetings) Additional time in informal meetings (Tillman, 1960)
1970’s: Average Exec. 6-7/wk (~2x 1960’s Study - Rice, 1973) Managers up to 60% of their time. (Mintzberg, 1973)Program managers up to 80% of their time. Middle managers 3 or 4 full days a week. Some 8 straight hours in one meeting. (Van de Ven, 1973)
![Page 28: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/28.jpg)
2828
Time spent in meetingsshows an upward trend (cont’d.)1980’s: Typical middle managers ~35% of their work week. Top mangers 50% of their time. (Doyle, 1982) Typical managers up to 80 % of their time. (Monge, 1989)Average technical professional/manager 1/4 work week.Top and middle managers 2 days/week.Executive managers 4 days/week. (Mosvick, 1987)
![Page 29: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/29.jpg)
2929
Time spent in meetingsshows an upward trend (cont’d.)Mosvick (1982, 1986) in 2 studies over a 5 year period of 950 junior-senior managers and technical professionals in large-scale technology-intensive industries U.S. and abroad
Major finding: "a notable shift toward an increase in the number and length of meetings with an increasingly high level of dissatisfaction with meetings."
![Page 30: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/30.jpg)
3030
Reported length of meetings: 51% between 30 and 90 minutes
10%
13%
16%
25%26%
0.9%
0
5
10
15
20
25
30
0-30min.
31-60min.
1-1.5hrs.
1.5-2hrs.
2-4hrs.
>4hrs.
%
(Monge, P. R., McSween, C., & Wyer, J. (Monge, P. R., McSween, C., & Wyer, J. 1989) 1989)
![Page 31: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/31.jpg)
3131
Time spent in meetingsshows an upward trend (cont’d.)Up to 20% of a manager’s work day is spent in conference room meetings. (Panko, 1992)
Managers spend ~ 20% of their work day in 5 person or larger formal meetings and as much as 85% of their time communicating. (Panko, 1994)
![Page 32: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/32.jpg)
3232
Meeting frequency is increasing
Fortune 500 companies hold between 11 to 15 million formal meetings/day and 3 to 4 billion meetings/year (Doyle, 1982; Monge, 1989)
A 1997 survey found that in 1998…24% of respondents expect to hold more meetings 85% predict the same length or longer meetings
![Page 33: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/33.jpg)
3333
Meeting costs
• 11-15 Million formal meetings / day• ? Million informal meetings / day• 3-4 Billion meetings / year• 30-80% Manager’s time in Teamwork• 7-15% of personnel budgets on teamwork• $ billions of spent each year
The 3M Meeting Productivity Study and Harrison Hofstra Study found that…
![Page 34: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/34.jpg)
3434
Meeting efficiency
On average, by managerial function,
33% of meeting time is unproductive (Sheridan, 1989)
![Page 35: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/35.jpg)
3535
(N= 1305)
Rank Type of Problem Number ofReferences
1 Getting off the subject 204 2 No goals or agenda 190 3 Too lengthy 187 4 Poor or inadequate preparation 94 5 Inconclusive 88 6 Disorganized 86 7 Ineffective leadership/lack of control 38 8 Irrelevance of information discussed 37 9 Time wasted during meetings 37 10 Starting late 36 11 Not effective for making decisions 31 12 Interruptions from within and without 30 13 Individuals dominate/aggrandize discussion 29 14 Rambling, redundant, or digressive discussion 27 15 No published results or follow up actions 25 16 No pre-meeting orientation/cancelled or postponed meetings 20 17 Meetings too large/too many people 13 18 Ineffective speakers/communication problems 13 19 Too much information presented 12 20 Poor attitudes or effort by participants 10 21 Lack of participation 8 22 Participants have no decision authority 8
Source: Data combined from [Mosvick, 1982 #876; Mosvick, 1986 #877]
![Page 36: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/36.jpg)
3636
Meeting problems: Agenda (or lack thereof)
No goals or agenda – 2nd most commonly reported problem (Mosvick, 1987)
~ 50% had no written agenda; However 73% of respondents felt an agenda is "essential" for a productive meeting. (Burleson, 1990; Sheridan, 1989 - Harrison-Hofstra Survey)
![Page 37: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/37.jpg)
3737
Meeting problems: Agenda (or lack thereof) (cont’d.)
32% No stated agenda 17% Prior Verbal agendas 9% Written agendas distributed at start 29% Prior written agendas (Monge, 1989)
![Page 38: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/38.jpg)
3838
Workers express the desire to work in groups
3 year survey of 10,277 U.S. workers from all levels of employment that 97% reported they needed conditions that encourage collaboration to do their best work. (Hall, 1994)
![Page 39: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/39.jpg)
3939
A recent survey of executives found that…
43% of them admitted dozing off at least once during a meeting
The majority concluded that 20-30% of meetings were unnecessary
(Erickson, 1998)
![Page 40: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/40.jpg)
4040
Findings
Decades of study show that meetings dominate workers’ and managers’ time and yet are considered to be costly, unproductive and dissatisfying.
Yet meetings are essential, because no one person has the knowledge, insight, skills and experience to do the job alone. (Erickson, 1998)
![Page 41: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/41.jpg)
4141
Steps to move toward understanding
• Develop better Collaboration Productivity Metrics
• Develop a Collaboration Productivity Maturity Model
• Develop and Test Guidelines and Interventions to improve Collaboration Productivity via Procedures, Facilitation, and Technology (Erickson, 1998)
![Page 42: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/42.jpg)
4242
Why do some demonstrate teamwork, others don’t?
• Why did the same teamwork approach lead to such widely varying results?
• If the pilot effort was such a success, why are other applications of teamwork failing?
• Why is the probability of effective teamwork over there higher than it is here?
![Page 43: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/43.jpg)
4343
The underlying theory or logic is probably not to blame
• An idea is deemed good, in part, because it makes logical sense– Install Teams A B C Improvement
• This logic is easily transferred to – and makes sense in – a lot of different settings
• And, more often than not, a success story exists that provides support for this logic
![Page 44: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/44.jpg)
4444
For example…
TeamTraining
TeamSkills
Teamwork Innovation Improvement
Form Cross-Functional
Teams
Integration ofDiverse Skills
Creativity
Cost Reduction
AcceleratedNew ProductDevelopment
![Page 45: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/45.jpg)
4545
Unfortunately, the real world has its own logic (at times)
• Potential sources of slippage are found at each step of a train-of-logic
• These sources vary from setting-to-setting with respect to direction, magnitude, and pliability
• They influence the degree to which the logic train plays itself out or derails– In other words, they influence probability of
effective implementation
![Page 46: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/46.jpg)
4646
Implementation often takes on a field of dreams approach
• Install the good idea, make it operational, and the desired results will come
• Installation – or solving the Stage 1 Problem - is one thing, what happens next is another
• Where installation (more or less) ends, the Stage 2 Problem begins– Effective use to the point of functionality
(optimality)– Given a good idea’s installation, what must be
done to increase the probability of success?
![Page 47: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/47.jpg)
4747
For example, assume training has been done. What next?
TeamTraining
TeamSkills
Teamwork Innovation Improvement
Budget
Individual Working Styles Reward System
Decision Authority
Perceived Need to Know
Leadership
Team Focus or Purpose
Meeting ProcessMgmt. Support
![Page 48: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/48.jpg)
4848
Another example
Form Cross-Functional
Teams
Integration ofDiverse Skills
Based on Jassawalla, A.R. and H.C. Sashittal, Building collaborative cross-functional product teams. Academy of Management Executive, 1999. 13(3): p. 50-63.
Willingness toCooperate
Access to Informationand Resources
Top Management’sTolerance for Delays
and Failures
Level of Interpersonal Trust
Comfort LevelWith Changes
Team LeadershipCulture
Propensity to Experiment and Adapt
![Page 49: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/49.jpg)
4949
And one more (simplistic) example
InstallTeams
Teamwork
Job Security Politics
Pay and Reward
Level ofTraining
Based on Tudor, T.R. and R.R. Trumble, Work-teams: Why do they often fail? S.A.M. Advanced Management Journal, 1996. 61(4): p. 31-41.
![Page 50: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/50.jpg)
5050
Sources of slippage suggest ways to increase probability of change
![Page 51: 1ETM5221 Engineering Teaming Spring 2002 ETM5221 Engineering Teaming: Application and Execution Nicholas C. Romano, Jr. Nicholas-Romano@mstm.okstate.edu](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649e395503460f94b2a39b/html5/thumbnails/51.jpg)
5151
Good ideas are good only to the degree they achieve good
results• The trains-of-logic that underlying teamwork
are hard to argue against• However, it’s sources of slippage that influence
whether that logic train plays out or derails• The probability of success can be increased by
paying attention to these sources of slippage• The Stage 2 Problem, therefore, should be the
centerpiece of implementation planning