Goal and Outline
Main Goal: Suggest practices, values, and some process for
completing a final project on time that is better than any one could do it in in four times the time.
Outline Distinguish Waterfall (plan driven) from Agile 11 Practices of quality software development Four values of Extreme Programming (XP) Process considerations adapted from Scrum
![Page 3: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/3.jpg)
April 10, 2023 3
Waterfall Model
Waterfall was described by 1970 Understood as
finish each phase don’t proceed till done
W. W. Royce criticized this proposed an iterative approach
![Page 4: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/4.jpg)
April 10, 2023 4
Became Popular
Management liked phases to easily set deadlines Customers provide all requirements Analysts translate requirements into specification Coders implement the specification Reviews ensure the specification is met Testing is performed by others (QA) Maintenance means modifying as little as possible
old code is good code Change is hard (and costly)
![Page 5: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/5.jpg)
April 10, 2023 5
Sprial
Dr Barry Boehm proposed a spiral approach
![Page 6: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/6.jpg)
April 10, 2023 6
Waterfall
It became popular This process is still is used a lot
Craig Larman's book [1] provides proof that waterfall has proved to be a terrible way to develop software. In his study, 87% of all projects failed. The waterfall process was the "single largest contributing factor
for failure, being cited in 81% of the projects as the number one problem."
[1] Agile and Iterative Development: a Manager's Guide, Addison-Wesley Professional, 2003
![Page 7: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/7.jpg)
April 10, 2023 7
Extreme Programming (XP)
As of 2007, about 12 years of growth About 25% of new project are Agile
Set of SE practices that produce high-quality
software with limited effort Many books, first by Kent Beck:
Extreme Programming–Embrace Change,
Addison-Wesley, 2000,
ISBN 0-201-61641-6 http://www.extremeprogramming.org/
![Page 8: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/8.jpg)
April 10, 2023 8
Extreme Programming
XP is a disciplined approach to software development code centric: no reckless coding, test-first successful because it emphasizes customer involvement
and promotes team work not a solution looking for a problem One of several "agile" (can adapt to change) software
development processeshttp://www.agilealliance.org/
![Page 9: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/9.jpg)
April 10, 2023 9
Essence of XP
Four variables in software development: Cost, Time, Quality, Scope (# features)
Four Values Communication, Simplicity, Feedback, Courage
Five Principles Provide feedback, assume simplicity, make incremental changes,
embrace change, quality work Practices (or fewer, or more, or subject to change)
Planning game, small releases, simple designs, automated testing, continuous integration, refactoring, pair programming, collective ownership, Continuous Integration, on-site customer, coding standard
![Page 10: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/10.jpg)
April 10, 2023 10
Cost of change
Costof
change
time
Waterfall
XP
![Page 11: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/11.jpg)
April 10, 2023 11
Cost of the Project
Paraphrasing two companies from Agile 2007 (one is published) When we bid projects, we charge x for doing it
Waterfall and x / 2 for doing it Agile
![Page 12: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/12.jpg)
April 10, 2023 12
Goal and Outline
Main Goal: Suggest practices, values, and some process for completing a final
project on time that is better than any one could do it in in four times the time.
Outline Distinguish Waterfall (plan driven) from Agile 11 Practices of quality software development to use on your final
project Four values of Extreme Programming (XP) Process considerations adapted from Scrum
![Page 13: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/13.jpg)
April 10, 2023 13
Practices: Planning Game
The planning game involves story cards, which are short descriptions of a feature Provide value to customer Independent of each other Testable
Customer writes story cards and prioritizes them Developers estimate how long a story takes
![Page 14: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/14.jpg)
April 10, 2023 14
Practices: The planning game
Business decisions (customer) Scope: which “stories” should be developed Priority of stories (features) Release dates
Technical decisions (developers) Time estimates for features/stories Elaborate consequences of business decisions Team organization and process Scheduling
![Page 15: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/15.jpg)
April 10, 2023 15
Practices: Estimation
Based on similar stories from the past (“yesterday’s weather”)
Team effort Get good at estimation simply by doing it Ideal Engineering Time (IET)
could be points Velocity = IET/Calendar Time
we can do 20 points each week "Customer, which 20 points do you want next week?"
![Page 16: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/16.jpg)
April 10, 2023 16
Practices: Small Releases
Releases should be as small as possible Should make sense as a whole Put system into production ASAP
Fast feedback Deliver valuable features first Short cycle time
Planning 1-2 months rather than 6-12 months Or in our case, 1-2 weeks rather than 6 weeks
![Page 17: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/17.jpg)
April 10, 2023 17
Practices: Simple design
The “right” design Runs all tests No code duplication, No code duplication Fewest possible classes Short methods Fulfills all current business requirements
Design for today not the future But design so the system can change
![Page 18: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/18.jpg)
April 10, 2023 18
Practices: Testing
Software should be tested, but it is often spotty or overlooked
Automatic testing (JUnit, for example) help us know that a feature works and it will work after refactoring, additional code, and other changes
Provides confidence in the program
![Page 19: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/19.jpg)
April 10, 2023 19
Testing
Write tests at the same time as production code Unit tests developer Feature/acceptance tests customer
Don't need a test for every method Testing can be used to drive development and
design of code Allows for regression testing
Do changes break previously working code
![Page 20: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/20.jpg)
April 10, 2023 20
SIM/SQS http://www.simgroup.com/Consultancy/regression.html
Regression Testing re-testing of a previously tested program following
modification to ensure that faults have not been introduced or uncovered as a result of changes.
Regression tests are designed for repeatability, and are often used when testing a second or later version of the system under test.
Regression testing can be carried out on all applications, including e-Commerce and web-based systems .
![Page 21: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/21.jpg)
April 10, 2023 21
Testing
Strong emphasis on regression testing Unit tests need to execute all the time
Unit tests pass 100% Acceptance tests (we haven't seen these) show
progress on which user stories are working Other testing frameworks include
JMeter, HttpUnit, JProbe, OptimizeIt, CPPUnit
![Page 22: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/22.jpg)
April 10, 2023 22
Can't unit test always
Won’t have unit tests for GUIS: There are testing frameworks to simulate and
test user interaction, but not this course JPaint: Visual inspection, few unit tests Randomness: Some strategies might have some
randomness, which can be hard to work with
![Page 23: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/23.jpg)
April 10, 2023 23
Practices: Refactoring
Restructure code without changing the functionality
Goal: Keep design simple Change bad design when you find it Remove dead code
Examples at Martin Fowler's Web site: http://www.refactoring.com/ see online catalog
![Page 24: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/24.jpg)
April 10, 2023 24
Practices: Pair programming
Write production code with 2 people on one machine Person 1: Implements the method Person 2: Thinks strategically about potential improvements, test
cases, issues Pairs change all the time. Has advantages such as
No single expert on any part of the system Continuous code reviews, fewer defects Cheaper in the long run, and more fun
Problems: Not all people like it Pairs need to be able to work together
![Page 25: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/25.jpg)
April 10, 2023 25
Practices: Collective ownership
All code can be changed by anybody on the team Everybody is required to improve any portion of
bad code s/he sees Everyone has responsibility for the system Individual code ownership tends to create experts
![Page 26: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/26.jpg)
April 10, 2023 26
Practices: Continuous integration
Integration happens after a few hours of development Checkout build with your changes, Make sure all tests
pass (green bar) In case of errors:
Do not put changes into the build Fix problems
Checkin the system to the common repository Repeat
![Page 27: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/27.jpg)
April 10, 2023 27
Continuous Integration
Find problems early Can see if a change breaks the system more
quickly -- while you remember the details Small increments
![Page 28: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/28.jpg)
April 10, 2023 28
Practices: Coding standards
Coding Standard Naming conventions and style Least amount of work possible: Code should exist once
and only once
Team has to adopt a coding standard Makes it easier to understand other people’s code Avoids code changes because of syntactic preferences
![Page 29: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/29.jpg)
April 10, 2023 29
Practices: On-site customer
Many software projects fail because they do not deliver software that meets business needs
Real customer has to be part of the team Defines business needs Answers questions and resolves issues Prioritizes features
![Page 30: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/30.jpg)
April 10, 2023 30
Outline
Main Goal: Suggest practices, values, and some process for completing a final
project on time that is better than any one could do it in in four times the time.
Outline Distinguish Waterfall (plan driven) from Agile 11 Practices of quality software development to use on
your final project Four values of Extreme Programming (XP) Process considerations adapted from Scrum
![Page 31: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/31.jpg)
April 10, 2023 31
Values: Communication
Communication Customer centric (write "Stories") Pair programming Task estimation Iteration planning
What to do in the next time period May be weekly goals
Design sessions
The Agile Manifesto
![Page 32: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/32.jpg)
April 10, 2023 32
Values: Simplicity
Simplicity Choose the simplest thing that will work Choose the simplest design, technology,
algorithm, technique
![Page 33: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/33.jpg)
April 10, 2023 33
Values: Feedback
Feedback very important
Small Iterations Frequent deliveries Pair programming Constant code review Continuous integration (add often to the build) automated unit tests (JUnit, for example)
![Page 34: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/34.jpg)
April 10, 2023 34
Values: Feedback
Compiler feedback: seconds Pair programming feedback: half minutes Unit test feedback: few minutes Acceptance testing: half hours
Customers write these, no can do in 335 Customer feedback: daily (or several times/week
in our case) Iteration feedback: weekly FeedBack?
![Page 35: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/35.jpg)
April 10, 2023 35
Agile ManifestoManifesto for Agile Software Development
We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value:
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
That is, while there is value in the items on the right, we value the items on the left more.
![Page 36: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/36.jpg)
April 10, 2023 36
Outline
Main Goal: Suggest practices, values, and some process for completing a final
project on time that is better than any one could do it in in four times the time.
Outline Distinguish Waterfall (plan driven) from Agile 11 Practices of quality software development to use on
your final project Four values of Extreme Programming (XP) Process considerations adapted from Scrum
![Page 37: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/37.jpg)
April 10, 2023 37
335 Final Project
SLs and Rick are the customers JPaint: Mike and Marc Risk: Will and Ivan Networked Hearts: Mark and Rick
As customers, we reserve the right to change requirements :-)
![Page 38: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/38.jpg)
April 10, 2023 38
Team
Class Meetings, every Tue until 27-Nov All teams (4 or 7) meet with customers to clarify
specs, changes, tech issues Each week, ask these three Scrum Meeting
Questions: What have we done since our last meeting? What impeded our work? What will we before the next meeting?
More meetings/coding session preferred of course
![Page 39: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/39.jpg)
April 10, 2023 39
![Page 40: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/40.jpg)
April 10, 2023 40
A little Scrum
Scrum: A popular Agile Method. We'll use Scrum meetings (mentioned on previous slide) today
and the next four Tuesdays Product Backlog
A document (a spreadsheet or table) in your repository that lists all functionality with estimates. Highest priorities on top. More later
Review Meetings Each team will meet with their customer / grader (SLs)
Meeting 1: by 6-Nov Meeting 2: by 20-Nov
![Page 41: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/41.jpg)
April 10, 2023 41
Today
Start the Product Backlog which is "the master list of all functionality desired in the product. When a project is initiated there is no comprehensive, time-consuming effort to write down all foreseeable tasks or requirements. Typically, a project writes down everything obvious (…your team actually did that last week…). The Product Backlog is then allowed to grow and change as more is learned about the product and its customers." Mountain Goat Software
![Page 42: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/42.jpg)
April 10, 2023 42
Deliverable due next week
Put a document into you repository that lists all functionality you can think of along with estimates in hours and who is responsible. See example on next slide
Print a copy of this document to be turned in every Tuesday meeting. It may not vary much, that's okay This is an attempt to produce visibility
![Page 43: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/43.jpg)
April 10, 2023 43
![Page 44: 18-Agile07FinalProject1CHECKER.ppt](https://reader036.vdocuments.us/reader036/viewer/2022062511/54c78c784a7959a4108b45a7/html5/thumbnails/44.jpg)
April 10, 2023 44
Today
All teams meet customers/graders by Project Share discoveries, query the specs (we take role)
In individual teams Draft the product Backlog, estimate, assign responsible people,
schedule pair programming sessions and/or all team meetings/coding sessions
Ask these three questions What have we done since our last meeting? What impeded our work? What will we before the next meeting?